Page 1
CITY OF DOVER, DELAWARE
PLANNING COMMISSION
Monday, December 15, 2025 at 7:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover
DE 19903 and via email at CompPlan@dover.de.us.
IN-PERSON and VIRTUAL MEETING NOTICE
The Planning Commission Meeting for December 15, 2025 will be held at City Hall in City Council
Chambers at 7:00PM and as a Virtual Meeting using Webex, an audio/video conferencing system as an
electronic means of communication. The public is welcome to attend. See participation information below
to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Planning Commission Meeting of December 15, 2025 at 7:00PM
Join By Phone: Dial +1-650-479-3208
Access Code: 253 665 37347
Password from Phones: 3683772
Join Online: https://bit.ly/PCMeeting12152025
Webinar Number: 2536 653 7347
Webinar Password: DoverPC
If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting
starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
ADOPTION OF AGENDA
APPROVAL OF MINUTES
1. Adoption of Minutes of October 20, 2025
1
Page 2
PLANNING COMMISSION - December 15, 2025 PAGE 2
COMMUNICATIONS & REPORTS
Meeting Reminder: The next Planning Commission regular meeting date is Tuesday, January 20,
2026.
Update on City Council Actions
Department of Planning & Inspections Updates
2. Draft Schedule of Deadlines and Meetings for 2026
OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS
OLD BUSINESS
Requests for Extension of Planning Commission Approval
NEW APPLICATIONS
3. S-25-07 Revised The Old Post at 55 Loockerman Plaza – Public Hearing and Review of a
Revised Site Development Plan Application and associated Revised Architectural Review
Certification for redevelopment of the Old Dover Post Office property consisting of 1.267 acres
for a mixed-use project known as The Old Post. The project involves the demolition of the rear
warehouse portion of the existing building and adaptive re-use of part of the front 4,560 SF
portion of the building for restaurant, commercial retail or business space and apartment units.
In this Revision are proposed increases in apartment unit count from 36 to 42 units and
architectural changes consisting of a second floor addition to the front wings of the building
and a four-story 43,092 SF building addition proposed for a total forty-two (42) residential
apartment units and with parking and other site improvements. The property is zoned C-2
(Central Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone),
and subject to the H (Historic District Zone). The property is located on the north side of
Loockerman Plaza and adjacent to Innovation Way. The owner of record is Old Post, LLC.
Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05-077.05-04-53.00-000. Council
District 4. For Consideration: Revised Parking Strategy Statement and Active Recreation Area
Plan. This Revised project is the subject of HI-25-01 Revised The Old Post for Historic District
Commission Review and Recommendation on the Architectural Review Certification on
November 20, 2025.
NEW BUSINESS
PUBLIC COMMENTS OPPORTUNITY
ADJOURN
Posted Agenda: December 5, 2025
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
2
Page 3
Item 1.
CITY OF DOVER PLANNING COMMISSION
October 20, 2025
The Meeting of the City of Dover Planning Commission was held on Monday, October 20, 2025,
at 7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system Webex.
The Meeting Session was conducted with Chair Mr. Witham presiding. Members present were
Mr. Roach (virtual), Mrs. Denney, Mrs. Maucher (virtual), Mr. Baldwin, Mr. Reaves (virtual),
Mrs. Welsh and Mr. Witham. Mr. Lewis and Dr. Jones were absent.
Staff members present were Mrs. Dawn Melson-Williams, Ms. Sharon Duca, Mr. Jason Lyon
(virtual) and Mrs. Kristen Mullaney.
APPROVAL OF AGENDA
Mrs. Welsh moved to approve the Agenda as presented, seconded by Mrs. Denney and the
motion was carried 7-0 with Mr. Lewis and Dr. Jones absent.
APPROVAL OF MEETING MINUTES OF SEPTEMBER 15, 2025
Mrs. Denney moved to approve the Planning Commission Meeting Minutes of September 15,
2025, seconded by Mrs. Welsh and the motion was carried 7-0 with Mr. Lewis and Dr. Jones
absent.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, November 17, 2025, at 7 PM. We will determine whether that meeting is necessary
in early November. There is a chance that you may not meet that evening as currently there is not
a new application to consider.
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on September 22 & 23 and October 13 & 14, 2025.
Mrs. Melson-Williams stated that there is not much to report. We are trying to hang on. We have
a variety of different position openings in our overall Department as does the City citywide. So,
she encourages people to take a look at what those employment opportunities may be.
Mrs. Melson-Williams stated that the Institute for Public Administration at the University of
Delaware has a Planning Education Certificate Series and that actually began last week.
Unfortunately, that class filled rather quickly so hopefully they will re-do that one. It was one
specifically on Planning Commission training. But they have the upcoming Tuesday series to be
presented on various Planning topics. If you are interested in attending any of those training
sessions, please alert Planning Staff as they will have to register you. You can join Mrs. Denney
as she is going to be attending those.
As the Chair noted, the 2025 Delaware Planning Conference Annual Meeting that is presented
by the American Planning Association’s Delaware Chapter is scheduled for Wednesday,
December 3, 2025. It is here in Dover and it is a one-day long Conference with various speakers.
It is to be held at Bally’s Dover Casino Resort in their Rollins Center. Likewise, there are a
1
3
Page 4
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
number of registration options on that; so, see Planning Staff if you are interested in attending
that Planning Conference.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the Webex system.
OLD BUSINESS
Requests for Extensions of Planning Commission Approval:
S-23-20 Cold Storage Warehouse at 451 Garrison Oak Drive - Request for a One-Year Extension
of the Planning Commission Approval granted November 20, 2023 of the Site Development Plan
for a 165,000 SF Warehouse with associated site improvements. The site is located at Lot 8 of
the Garrison Oak Business & Technology Park. The property is zoned IPM-2 (Industrial Park
Manufacturing Zone – Business and Technology Center) and partially subject to the SWPOZ
(Source Water Protection Overlay Zone: Tier 2 Primary Wellhead Protection Area). The
property of 11.53 acres is located on the south side of Garrison Oak Drive. The owner of record
is the City of Dover; and the equitable owner is SLS Equity Partners. Property Address: 451
Garrison Oak Drive. Tax Parcel: LC-05-068.00-02-08.00-000. Council District 3. Waiver
Requests Approved: Partial Elimination of Upright Curbing and Reduction of Parking
Requirement. Approved: Performance Standards Review Application. The site was granted two
variances to reduce setbacks related to building height and to increase the maximum lot
coverage to 71% (Board of Adjustment Application V-23-05).
Representative: Mr. Jonathan Street, Becker Morgan Group (virtual); Ms. Shira Weisz
Mrs. Melson-Williams stated that S-23-20 is for the Cold Storage Warehouse at 451 Garrison
Oak Drive. That is Lot 8 within the Garrison Oak Business and Technology Park. The Planning
Commission reviewed it back in November 2023 as a Site Development Plan for a rather large
warehouse building and its associated warehouse improvements. At the time, waiver requests
were approved related to the partial elimination of upright curbing and also a reduction in the
parking requirement. The Planning Commission also approved a Performance Standards Review
Application for the site as it is found in the IPM-2 (Industrial Park Manufacturing Zone –
Business and Technology Center) and also partially subject to the SWPOZ (Source Water
Protection Overlay Zone: Tier 2 Primary Wellhead Protection Area). It was previously the
subject of a Board of Adjustment application. Since that time back in 2023, the applicant in the
recent month has achieved Final Site Plan Approval for their project but is seeking additional
time in order to proceed with moving towards construction and an end user for that site.
Mr. Street stated that they have no presentation other than that the project recently received Final
Plan Approval and frankly they are just in need of more time to develop a list of contractors and
pull permits. The time it took from the end result of Final Plan Approval, there isn’t enough time
to pull permits. They are requesting a one-year extension to the Planning Commission approval
so the end user has time to develop those contracts and pull permits.
2
4
Page 5
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
Mrs. Welsh moved to approve S-23-20 Cold Storage Warehouse at 451 Garrison Oak Drive for a
one-year extension, seconded by Mrs. Denney and the motion was carried 7-0 by roll call vote
with Mr. Lewis and Dr. Jones absent. Mrs. Welsh voting yes. Mr. Roach voting yes. Mrs.
Maucher voting yes. Mrs. Denney voting yes. Mr. Baldwin voting yes. Mr. Reaves voting yes. Mr.
Witham voting yes; the request appears to be reasonable under the circumstances.
S-23-21 BHD Operations Facility at 250 Garrison Oak Drive - Request for a One-Year
Extension of the Planning Commission Approval granted November 20, 2025 of a Site
Development Plan for a 6,000 SF Office Building with 4,000 SF Truck Maintenance Garage,
parking and storage area for collection trucks and containers, a refueling station, and with
associated site improvements. The site is located at Lot 11 of the Garrison Oak Business &
Technology Park. The property is zoned IPM-2 (Industrial Park Manufacturing Zone – Business
and Technology Center). The property of 10.755 acres is located on the west side of Garrison
Oak Drive. The owner of record is Trash Gurls, Inc. Property Address: 250 Garrison Oak Drive.
Tax Parcel: LC-05-068.00-02-11.00-000. Council District 3. Approved: Performance Standards
Review Application.
Representative: Mr. Jim Eriksen, Solutions IPEM
Mrs. Melson-Williams stated that this is S-23-21 BHD Operations Facility at 250 Garrison Oak
Drive, another lot in the Garrison Oak Business and Technology Park; this is specifically Lot 11.
Likewise, it received Planning Commission approval back in November of 2023 for an office
building and a truck maintenance garage combination along with a storage area for the
trash/recycling collection trucks and containers. It is not a facility that would process trash. This
is where the collection trucks live when they are not out collecting the trash. That Site Plan was
approved also with a Performance Standards Review Application back in November 2023.
Likewise, they have been moving through the Site Plan finalization process. They do actually
have all of the agency approvals in hand and they are just waiting on a time on her calendar to
grant their Final Plan Approval. We do have it in the Planning Office and they have already filed
Building Permits. But in the interest of making sure the project stays alive, we suggested that
they go ahead and seek an extension. Specifically, their letter requests a six-month extension but
our standard approval time for an extension is one year just for tracking purposes.
Mr. Eriksen stated that he doesn’t have a ton to add. Basically, we have been moving forward
with the engineering process. We received most of our approvals back in January. We were
waiting for some correspondence between the City and DelDOT to be able to move forward at
that point. Once they received that, they moved forward with the Final Site Plan. At this point,
they have the request for Final and they are just waiting for a little bit of time to finalize that
Final Site Plan as well as establish the Building Permit and go through that process.
Mr. Witham asked if they have had any hiccups in the process. Responding to Mr. Witham, Mr.
Eriksen stated that the biggest thing is just timing of agencies. We had a little hiccup with
DelDOT. It took a few months to coordinate that and we were at the finish line back in June from
a Final Site Plan standpoint and we submitted all of our sets for final approval. We just haven’t
heard anything back from the City at that point.
3
5
Page 6
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
Mrs. Welsh moved to approve S-23-21 BHD Operations Facility at 250 Garrison Oak Drive for
a one-year extension due to the timeline issues that they have experienced, seconded by Mrs.
Denney and the motion was carried 7-0 by roll call vote. Mrs. Welsh voting yes. Mr. Roach
voting yes. Mrs. Denney voting yes. Mrs. Maucher voting yes. Mr. Baldwin voting yes. Mr.
Reaves voting yes. Mr. Witham voting yes; for the reasons set forth on public record.
NEW APPLICATIONS
Z-25-01 Lands of Bayhealth Medical Center, Inc. at 600 South State Street: Rezoning
RGO/SWPOZ to IO/SWPOZ - Public Hearing and Review for Recommendation to City Council
of a Rezoning application for a parcel of land consisting of 1.0053 acres +/-. The property is
zoned RGO (General Residence and Office Zone) and partially subject to the SWPOZ (Source
Water Protection Overlay Zone). The proposed zoning for the property is IO (Institutional and
Office Zone) and partially subject to the SWPOZ (Source Water Protection Overlay Zone). The
property is located at the southwest corner of South State Street and South Street. The owner of
record is Bayhealth Medical Center, Inc. Property Address: 600 South State Street. Tax Parcel:
ED-05-077.13-01-48.00-000. Council District 2. Ordinance #2025-15. The First Reading of the
Proposed Ordinance occurred on September 22, 2025 and Public Hearings are scheduled for
Planning Commission on October 20, 2025 and City Council on November 10, 2025.
Representative: Mr. Gregg Moore, Becker Morgan Group
Mrs. Melson-Williams stated that this is a Rezoning Application for the Lands of Bayhealth
Medical Center, Inc.; specifically for the property located at 600 South State Street. The
rendering shown on the screen kind of gives you a sense of where the property is located; it is
shown in the center of the page shaded in yellow. It is at the corner of State Street which runs
north/south and South Street which is on the north side of this property. It is a property just over
an acre in size. Currently, there is a two-story brick building located on property which since
having been acquired by Bayhealth has served as offices. They are seeking Rezoning because of
future plans for the hospital expansion. The hospital is the remaining portion of that block that’s
bounded by South Street, South State Street, Hope Street and then South Governors Avenue.
Currently, the property is zoned RGO (General Residence and Office Zone) so the office type
use there is permitted. There is a portion of the property that falls within the SWPOZ (Source
Water Protection Overlay Zone). That is the shaded green curve that kind of passes through this
property. That is a zoning classification that helps protect our underground water resources. With
this Rezoning, the property would remain subject to the SWPOZ (Source Water Protection
Overlay Zone). They are making a request for rezoning to IO (Institutional and Office Zone).
The IO (Institutional and Office Zone) has a variety of uses that are permitted in that zone. With
a Rezoning application, we can’t lock it in to any one of those in particular but for a sense of
what can happen in the IO (Institutional and Office Zone), it’s a series of different office types,
banks, design and development laboratories, public and institutional uses and those would
include things like hospitals, medical clinics, libraries, police stations, courthouses, schools
colleges, universities, places of public assembly, philanthropic institutions, and other public uses.
The IO (Institutional and Office Zone) also allows for things like child care centers, emergency
shelters, transitional housing, and adult daycare facilities. Then there are other things that would
be allowed through a Conditional Use which is a specialized review process and then other
4
6
Page 7
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
accessory uses. With a Rezoning application, we have to look to the City’s Comprehensive Plan
and what does that say from a land use perspective about how the property should be utilized and
in the 2019 Comprehensive Plan, the Land Development Plan Map identifies this property as the
Institutional land use category. The goals for Institutional land uses are specifically listed in the
Comprehensive Plan. It is to maintain and improve the City’s position as a center of government,
education and medicine through support of existing institutions and encouraging well-designed
campuses that are integrated into the community and have room to expand. The Comprehensive
Plan also outlines the policies and recommendations and specifically speaks to the hospital
complex that’s found in this area of the City. With the Comprehensive Plan, the land use
category of Institutional identifies the appropriate zoning district that it could be considered to be
rezoned to and that is where we find the IO (Institutional and Office Zone). The next slide
shows the location of this property that is shaded in the darker gray. You can see the balance of
the property at the existing hospital location for Bayhealth.
As part of our Report, the Planning Staff must formulate a report and the Planning Commission
members were provided that. In it, they discussed different zoning classifications and what it
means for IO (Institutional and Office Zone) which is more truly an institutional zone here in the
City. Staff is recommending approval of the Rezoning to IO (Institutional and Office Zone)
noting that it is consistent with the Comprehensive Plan and that it’s grouping is in the area of
other similar institutional activities and we also recommend that it would remain subject to the
SWPOZ (Source Water Protection Overlay Zone) recognizing that there are some exemptions for
that zone in its requirements because of the location here in Downtown. The Comprehensive
Plan encourages the long-term viability of our existing major institutions; so, we also note that.
The Rezoning process does not grant approval of a specific use of the property but makes the use
of the property subject to the list of permitted uses in the Zoning District that it is applied.
Tonight, the Planning Commission, in looking at a Rezoning, will be making a recommendation
that will move onto City Council. The Planning Commission is charged with considering this
with three factors that are outlined in the Report. The first one being whether it is compatible
with existing uses and zones in the area. The second one being whether adequate public services
and infrastructure exists or can be created to serve the needs of any demand related to such
change. And then, the third is whether the change is in accordance with the City’s
Comprehensive Plan. The Development Advisory Committee Report is made up of those
background information provided by Staff, our Staff recommendation, and then the conditional
comments from the Development Advisory Committee agencies. In this case, most of these
agencies are identifying that they have no objection to the Rezoning and they provide some
additional guidance about future endeavors should the property seek to redevelop. Those
agencies include our Department of Water/Wastewater, Public Works, the City’s Electric
Department, Office of the Fire Marshal, the DelDOT and Kent Conservation District as well as
the Dover/Kent MPO for this project.
Mr. Moore stated that Mrs. Melson-Williams’ presentation was very complete. They agree with
the Staff Report with all of the recommendations and all of the conditions that are there. A
couple things that he does want to make clear. We do believe that there is a significant change in
character of the neighborhood which would facilitate the Rezoning. That is the only parcel that
Bayhealth owns in this area that is not IO (Institutional and Office Zone). All of the remaining
parcels are IO (Institutional and Office Zone) including the parcel directly across State Street,
5
7
Page 8
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
which is where the surgery center is and the parking lot. The property across South Street is their
central utilities office building and parking is also IO (Institutional and Office Zone); as well as
the properties that are on the opposite side of Hope Street, which houses some parking for the
Bayhealth building on that side. In addition, Holy Cross is also IO (Institutional and Office
Zone). So, we are almost completely surrounded by IO (Institutional and Office Zone) which is
really why we think it’s very compatible with the surrounding neighborhoods as Mrs. Melson-
Williams pointed out. Also, the Comprehensive Plan, as Mrs. Melson-Williams pointed out, they
are consistent with that. So, this is just allowing us to have all of the parcels of Bayhealth in the
IO (Institutional and Office Zone) which makes perfect sense to us. They are planning a major
renovation/addition to the entire campus. We are focusing on this very block. We own property
around it, but the problem that we are having is that our hospital is starting to spread out too
much. We are going to pursue a ten-story addition to the existing building, four stories of which
were built in about 2010 and that was actually approved in this chamber for the ten-story tower
in 2006. We will be coming back to this Board probably next year and presenting our
Comprehensive Master Plan of the entire campus and you all will be seeing that. That ten-story
tower addition is the focus of that. That will be what we call a bed tower where we are going to
be adding up to in our first bays, about 100 beds and in total for a 30-year master plan, about 200
beds. Part of that is from growth of our community. We are the main health care provider and we
are running low on beds and that has been since COVID. That is also presenting us problems in
our Emergency Department where we are having problems finding beds for people who come
into the Emergency Department. They can’t get a bed and it becomes backed up causing wait
times. We are trying to alleviate that for our community. A lot of the building is to the left. The
tower is actually right in the center of the South Street block. You can see that there is a square
and it is above that area where we are asking for Rezoning. Much of that area to the left is what
we would call legacy buildings. Much of it is more than 50 years old. Our original hospital is
embedded in there and because of the age, it does not meet current health care codes, it does not
meet floor to ceiling distances, and we have a problem being able to repurpose some of those
areas because of that. As a result, we are going to go vertically with ten stories and surround the
area around the bed tower where people will actually be in rooms. We will migrate everything
around there so that they are more efficient. If you have been in the hospital lately, when you go
in the main entrance that is the existing four-story podium that was approved in 2006. That four-
story podium will allow the six stories to be above it to get to ten stories. This is a very planned
process. But if you go there now, many of our beds have locations to the left and there are two
different banks of elevators. One is as far as almost 500 feet from the main entrance. We are
seeing that our patients, health care providers, and others have confusion as to where they need
to go and where are the rooms located. We have some elderly people who have a difficult time in
actually making that walk down to the elevators. This will make it more efficient and will go
straight up right behind the information desk at the front entrance. Eventually, under their Master
Plan, they are going to be tearing down a lot of that component of the hospital that is 50 years
and older and that would then become future growth but the hospital would be centered around
the ten-story tower. So, that is kind of a snippet of our expansion and we will be bringing that
back in detail and we will have all kinds of plans. We did appear before the Board of Adjustment
last week with the ten-story tower and some of the details about the tower and with that, it allows
us to finish our master planning so that we can submit that to the Planning Department. We have
had a number of meetings with Mrs. Melson-Williams about that. This is somewhat of a house
cleaning issue for us so that all of our properties are zoned similarly when we present a 30-year
6
8
Page 9
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
master plan.
Mrs. Denney stated that when you say ten stories, there are already six floors. Responding to
Mrs. Denney, Mr. Moore stated no. There are actually two buildings. When you go straight in
the main entrance now, the desk is right in front of you. We call that the podium which is a four-
story structure and we designed that to allow six stories to go on top. The elevators that you
would go to to get into the second, third and fourth floors with the Cancer Center being one of
them, that elevator will actually continue to stay in the current location and will go all the way to
the top. That is what he is saying is the easy way to find everything. You will be able to walk
directly behind the desk, go to the elevator and be able to go all the way to ten stories. You won’t
have as much having to walk distances to get to the green elevator or the yellow elevator.
Mrs. Denney stated that it is a good plan because she still goes over there frequently on a
volunteer basis and it is usually it is about a five-mile walk by the time you go up. This will
really make that a lot easier. Responding to Mrs. Denney, Mr. Moore stated that our Master Plan
is a three-phase plan. The first phase will be that tower and it will probably take three to five
years to execute that and the second phase, which is adding around the tower would probably be
starting in five to seven years. The problem that we have is that it is very difficult to maintain
healthcare process throughout the whole hospital and it is very difficult for us to make
expansions.
Mr. Witham stated that from a personal standpoint and a public standpoint, the big issue here is
the hospital business. In fact, the wait time in our trauma care and emergency services is
absolutely outrageous. He recognizes the problems that they have that really need to be
addressed. He realizes that your plan provides all of that but the sooner that issue can be
addressed, the sooner it will help. Responding to Mr. Witham, Mr. Moore stated that part of our
first phase is improvements both inside and to make some additions to the ED and the tower.
That Emergency Department will go from one story to three stories surrounding that tower. We
will be adding temporary beds there so that when you come in you will have a place to go, you
will be seen. They can decide whether or not you need to get admitted, and then you can go to a
room. The other thing that he didn’t mention that they are going to be doing is that we have a
number of rooms that are dual occupancy rooms where there are two beds in a room. His father
was in one. It is difficult for the providers and it is difficult for the patients. It is not the best
program for healthcare. We are going to eliminate all of them and then through our Master Plan,
they will all be single person rooms which are more modern healthcare. Part of our two hundred
(200) beds is because we have to do that. It is not a full add that we have to split, it’s two
hundred (200) rooms and that will give us the same amount of beds in single rooms. But we have
nearly one hundred (100) that we need to add for exactly what you are saying for capacity; and
part of that is our aging healthcare and our aging population and part of that is growth and part is
just modern medicine. We hear your story. We have heard it many times. The hospital knows it
well and they want to quickly get into the building phase so that we can address that.
Mr. Witham opened the public hearing.
Mr. Zach Prebula – Kent Economic Partnership 555 Bay Road Dover, DE 19901
Mr. Prebula stated that they are in support of this project. Part of our goal as the economic
7
9
Page 10
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
development organization is to support businesses looking to expand and Bayhealth is one of our
largest employers looking to do just that. By approving this Rezoning, you can help Bayhealth
move this expansion forward more smoothly as they only have to focus on one zoning code
rather than navigate multiple which will help them get this expansion through more timely.
Mr. Nate Attard – 452 East Loockerman Street Dover, DE 19901
Mr. Attard stated that he is the President of the group called The Friends of Old Dover. He is not
here to voice his displeasure with this Rezoning. This Rezoning is consistent with the City’s
2019 Comprehensive Plan and it should be supported. He is; however, here to voice his
displeasure that the City did not effectively utilize the H (Historic District) overlay for this and
other adjacent properties. City Staff has not been willing to recommend this overlay in any
meaningful way in any recent years to provide the community a voice and preservation and
design outcomes with the exception of the nearby Family Court property where this was used
after the demolition of the buildings on the site. The City has not sought to proactively use this
overlay to provide a voice to the citizens in what our City will look like in the future. Better
outcomes come with community support and involvement. With this Rezoning, it looks like we
are going to get another parking garage at this location. He knows Bayhealth can do better so he
is just hoping that with this, we get some more positive design outcomes, not just a single
faceless parking garage. Many hospitals do this and he knows Bayhealth can do it. He knows
their design consultants can rise to the challenge.
Mr. Thomas Smith – 126 Hampton Drive Dover, DE 19901
Mr. Smith stated that he is a member of the board called the Historical Society of Dover, aka The
Friends of Old Dover. Our mission is to protect and preserve the historic buildings of our City
and its wonderful architect. We also realize that rezoning will probably result in the demolition
of certain properties that some people in the City consider historic because they knew the people
who lived there as part of the community. Preserving our community is important to us.
However, these properties that we are concerned with and that will change as the hospital
expands are not in the Historic District and we fully realize that. What we want you to know is
the expansion of Bayhealth Campus is necessary to the health of our community. We fully
understand that and we fully support that. We do not want people to get the idea that we are
always against something because we are not always against something. What we are against is
the change in the community fabric that has a negative effect on our community. So, the Board
of Directors wants Bayhealth and the City of Dover to know that we do not oppose this zoning
change.
Ms. Laura Kaehler – 307 Merion Drive Dover, DE 19901
Ms. Kaehler stated that the house at 600 South State Street is the house that she grew up in. It is
the house where her dad had his office. He was a general practitioner for 30 years and was also
involved at Kent General from the 1960’s to the 1990’s. Her family had just heard about this just
recently. They didn’t know anything was planned for the house. When her mom sold the house,
she was told that it would be a nice block or shield from the industrial look of the hospital next to
the Historic District. The house itself is an old home at approximately 100 years old. But because
Dover is a historic community and that’s what kind of puts them on the map, she would ask them
to reconsider getting rid of that house just because they make a nice shield. When you are
coming down that main street, you would see the houses next to the Historic District. That is
8
10
Page 11
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
what we were told it was going to be and now the family is saddened to hear this. She knows that
the hospital needs to expand, but she would also ask for consideration of maybe starting a
hospital zone 2; maybe something off campus. Just like churches when they expand, they end up
having to go out of the City because they need so much room. With this being so close to
Downtown Dover and the Historic District, it could be expanded without having to look outside
of the main part of Dover and that way it would keep this house as a buffer. If you drive down
the street and notice what it looks like, it does make it look much different. Dover is known as
historic; it’s what just kind of puts it there. She would just ask that they think about the idea and
perhaps an off-campus location could be used to expand for what they need because they will
have to do it again. Also, they are just going to become land locked; so, maybe they should just
start their future where they can expand.
Ms. Anne DeMarie – 712 Oak Drive Dover, DE 19901
Ms. DeMarie stated that her question is since they are asking for the change; they probably have
a pretty good idea of what they want to do. She knows that they have all of these options but she
would like to know what they really want to do with the property. They probably already know
what they want to do with it if they are requesting the zoning IO (Institutional and Office Zone).
How many stories do they think they are going to make out of that space where the house is or is
that going to be part of the emergency department? If they tear down that house, how many
stories do you intend on building right there and what do you intend to do there? Are you
considering adult day care? If you are, an adult day care facility wouldn’t have to be there. An
emergency shelter wouldn’t have to be there. Are you considering transitional housing? Are you
considering child day care centers? Because that doesn’t have to be there and certain institutions
don’t have to be there; and if they are, are you going to be considering how close they are
because they have to be within a certain number of feet or in close proximity to the two schools
at Holy Cross and South Dover Elementary. You say you have plans, what are you plans right
now for the property at 600 South State Street? She really hasn’t heard what you intentions are
there. She will be honest; she doesn’t attend these things but she was kind of bewildered and
disappointed that she has not heard questions from the Commission. She is shocked and annoyed
and irritated and disappointed that she is not hearing questions. She is hoping that people
listening online maybe will come to the next meeting and make a difference. She thought that
was the whole idea; to come here and explain really what your plans are in a little more detail.
Just these options aren’t really telling the citizens really what you are doing. She is sure that most
of the people surrounding that area have no idea that you are even having this meeting tonight.
She knows that you sent letters to a certain group but she is thinking about the traffic. She hasn’t
even heard anybody interested in the amount of traffic this is going to involve. Just the things
that you are allowed to do from the 10.1 until you get to the 10.2 where you need more
approvals. But she is not hearing anything else. Like you said, you must have some idea if you
want to go to an IO (Institutional and Office Zone), what else is in your mind that you want to
do? She would just like to know from someone on the Commission or Staff. Responding to Ms.
DeMarie, Mr. Moore stated that he needs to be very clear that they are here for a Rezoning
tonight. The Rezoning has legal standard for its approval and that is that we have to prove that
it’s a change in character of the neighborhood, which his testimony was that over almost 100
years, the hospital has existed here and this neighborhood has changed as Bayhealth has grown
and our community has grown. Thus, much of the property surrounding us is already IO
(Institutional and Office Zone). We have to prove that we are compatible with surrounding uses.
9
11
Page 12
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
We have coexisted with Holy Cross and the commercial zones around us for decades and we
plan to continue to be good neighbors to them. We have to prove that we are consistent with the
Comprehensive Plan. What we can’t do legally is come here and show you plans of what they
are doing and what they want to do and what it all looks like because that is called contract
zoning and that is illegal in Delaware. We are very aware of our community making comments
of what it’s going to be. He was clear that what he said they were going to do was based on the
presentation to the Board of Adjustment of last week; that is public information. We are
beginning the process of outreach to our community. We started that with City Council in this
Chamber trying to explain to them. We are in the process now establishing days to outreach to
our neighbors in the surrounding area as well as The Friends of Old Dover so that people are
aware. We are going to do a good job of that outreach and that has already started by our
executive team establishing dates and locations so that when we do outreach, we have a good
process to do that. With that, Bayhealth is not trying to be coy by not explaining and bringing
drawings. That is not a legal standard that they have to prove and it is contract zoning. We want
to make sure that they are proper to the process.
Mrs. Denney stated that for her last thirty to forty years of her career she spent in medical
management. She has managed both a primary care and an orthopedic surgeon practice here
locally. The one thing that she can tell everyone for sure is that for a long time there has not been
enough beds in that hospital. It needs to expand in order to accommodate the general population
as well as the aging population. While the comments and thoughts about perhaps having an
annexed building, that doesn’t really work. You can’t have somebody and think oh we saw them
in the emergency room but they have to have surgery so now they are going in an ambulance and
ride down the street before their appendix bursts. When she saw this application and looked at it
initially, it seemed to make common sense to her; the planning aspect is that the zoning should
be uniform across the board so that you don’t have just this one little piece standing out
especially in that block. She is elated when she realizes that they are planning on going up as
opposed to spreading way out. Especially at this point, we don’t know what will happen. But the
hospital is one of our biggest employers and it is very important to our community. It is very
essential to the health of our residents. For those who know me and know that I speak very
firmly about things that near and close to her heart, she is very adamant in declaring that this is
the Capital City of the State that started the Nation and we do have to be careful when we start
erasing history. She felt that with the Downtown development further up and she expressed that,
but there is plenty of history north on State Street. Again, it would be very difficult to preserve
that area and expand the hospital the way it needs to be done. It is not just the people who work
there and separating rooms, there is a lot of behind the scenes that go on like JACO inspections
and many other inspections and types of things that happen. For many years when she first
started here, the hospital was very small and we had one insurance plan that would insure doctors
here for people to see doctors here and that was the old Principal Health Care. Part of her job was
to bring people here and expand. It was very hard to recruit doctors here. It is kind of crazy
because you think when you are driving your beat-up old Volkswagen trying to get through med
school and you’re thinking “someday, someday, some day.” Recruiting doctors, many of those
wives want to live near Central Park in New York City; they don’t want to live in Downtown
Dover. They are disappointed with the restaurants and the shopping and that was a callus. For
her, it was involving herself with the restoration of the Schwartz Center so we could bring some
more and more arts down here. It is a very fine line and while she is certainly empathic to “I
10
12
Page 13
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
grew up in a house there,” she really understands that and how it touches you but this expansion
of this hospital which begins in a very small way with a Rezoning, needs to happen for the state
of everyone’s health here. It begins with a lot of things and this is the first hurdle right now for
us.
Mr. Richard Kosior and Mrs. Kathy Kosior – 12 Elm Terrace Dover, DE 19901
Mrs. Kosior stated that they have traffic concerns which are pretty standard in any building
project and also the use of the corner lot where 600 S. State Street is now and what that would
mean for it. She understands that it is not revealed at this moment but was it a parking garage,
was it a parking area and how would it impact State Street to Elm Terrace where we live.
Mr. Moore stated that in a Rezoning is not appropriate to be addressing traffic. We are talking
about a use and any project that goes on in Downtown Dover will go through the Department of
Transportation and any Traffic Impact Studies will be done if needed. The beauty of this site for
100 years for Bayhealth is that we have two of the main feeders through the Downtown; both
Governors Avenue and State Street to allow access from both sides of the hospital. It has
functioned greatly there and that is a very good access to have. We have both Hope Street and
South Street to give us feeders for that so we can manage traffic. We aren’t concerned about that.
We know we have a lot of work to do to address traffic but that’s true of almost every function,
whether it’s codes of the buildings or fire or emergency. All of those things will be addressed but
the Rezoning is not the place to address them. We think that’s the Site Plan process when we are
detailing all of our plans exactly. The public will have part of that process and it has worked
well. The Commission has done a great job. He will end by saying that in 2006 he stood in this
very Chamber getting a 10-story tower approved. This is not a surprise; this is not new. Being a
Delawarean and knowing the growth that we have, 200 hundred beds are direly needed in this
facility.
Ms. Laura Kaehler – 307 Merion Drive Dover, DE 19901
Ms. Kaehler stated that she just wanted to add that Bayhealth does have another location in
Milford, DE. Just like there is another location, there could be another location for Dover. It
would be like two locations for Dover, not for people to get sent from one location to the other
but if half of the people attended one and the other half to the other. There wouldn’t be as much
traffic going to each one. But also, eventually there needs to be something done in the future
because Dover will keep expanding and it won’t physically fit there. If that is paid attention to
now and planned for now, the second location outside of where the main area of Dover is and the
historic area of Dover is, the extra beds and things could go somewhere else. Responding to Ms.
Kaehler, Mr. Witham stated that you realize you will have an opportunity to come forward to
comment during the Site Plan Development of this parcel.
Mr. Witham closed the public hearing.
Mrs. Denney moved to recommend approval to City Council for Z-25-01 Lands of Bayhealth
Medical Center, Inc. at 600 South State Street: Rezoning RGO/SWPOZ to IO/SWPOZ as this is
just a very small piece of what needs to happen here but it begins with Rezoning this small parcel
from RGO to IO and all of the zoning in the block will now be equal, seconded by Mrs. Welsh
and the motion was carried 7-0 by roll call vote with Mr. Lewis and Dr. Jones absent. Mrs.
11
13
Page 14
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
Denney voting yes; in accordance with her motion and she does think that the Rezoning of this
parcel needs to happen just to make that uniform. Mrs. Maucher voting yes; based on DAC
comments as well as it being consistent with the Comprehensive Plan. Mr. Baldwin voting yes;
based on aforementioned statements. Mr. Reaves voting yes; for reasons previously stated. Mrs.
Welsh voting yes; she will state that we are just voting on the Rezoning at this point in time and
she has seen many proposals from Becker Morgan Group to this Commission so she has no
doubt that when they come back, we will see an excellent presentation that will let us all know
what is planned for this site. Mr. Roach voting yes; he encourages the community to continue to
show up to these meetings. He definitely understands their concerns and like everyone said, it’s a
Rezoning application so continue to come to the future meetings to state your concerns and
things like that. Mr. Witham voting yes; the zoning is clearly compatible with the existing uses of
the zones in the area. This property is completely surrounded by IO (Institutional and Office
Zone) and it makes a lot of sense. There appears to be adequate public services and substantial
infrastructure that already exists to meet the needs of future expansion of the hospital which is
indicated by the comments. It is sorely needed and the change in the zoning is compatible with
the Comprehensive Plan.
Mrs. Melson-Williams stated that the Planning Commission’s recommendation will be
forwarded along with your public testimony this evening. City Council will consider this
Rezoning application at their meeting on November 10, 2025. The Council Agendas are posted
about a week before and their meetings begin at 6:30PM.
S-25-12 Blue Hen Corporate Center Pad Sites Master Plan (as Revised) - Public Hearing and
Review of a Site Development Master Plan application for three parcels of land with frontage on
Bay Road consisting of a total of 23.61 acres ±. The properties are zoned SC-2 (Community
Shopping Center Zone) and with certain areas subject to the SWPOZ (Source Water Protection
Overlay Zone Tier 3 – Excellent Recharge Areas). The proposed project would set the sites for
four 8,000 SF buildings (Buildings 1 – 4) and associated 450 parking spaces to be placed on the
pad sites located at the Blue Hen Corporate Center. Development is proposed in no specific
phase order because it will be built to suit as tenants approach the developer. The property is
located on the east side of Bay Road and south of Blue Hen Boulevard. The owners of record is
Blue Hen CC, LLC, and Blue Hen Mall, LLC. Property Addresses: 631 Bay Road and 655 Bay
Road and another listed as 655 Bay Road (S-10). Tax Parcels: ED-05-077.00-01-19.08-000, ED-
05-077.00-01-19.04-000, and ED-05-077.00-01-19.05-000. Council District 2. Waiver
Requested: Partial Elimination of Upright Curbing.
Representative: Mr. Jonathan Richard, Becker Morgan Group
Mrs. Melson-Williams stated that this is a Site Development Master Plan. It involves three
parcels of land that are part of the larger area known as the Blue Hen Corporate Center which is
located on the east side of Bay Road. The overall Master Plan comes to the Planning
Commission and then it identifies just general phases of a project. Then each phase would then
be subject to an Administrative Site Plan Review process. The Planning Commission is charged
with looking at the overall concept but then the finalized details will happen through an
Administrative Site Plan Review process. As noted on their opening cover sheet, they are
looking to place buildings, moving from the left, Building 1, Building 2 and then what had
12
14
Page 15
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
initially been filed as a location for Buildings 3 and 4 on the far right, has been revised to just be
a large parking area. That’s the note for revision. The property is zoned SC-2 (Community
Shopping Center Zone). We are dealing with three parcels of various sizes. The area that is to
become the redeveloped parking lot is also subject to the SWPOZ (Source Water Protection
Overlay Zone Tier 3 – Excellent Recharge Areas) and as such, has some limitations on its level
of impervious surface coverage that they will have to make reductions in that area to achieve.
The property as noted is zoned SC-2 (Community Shopping Center Zone) and that is described
more fully in our Report as well. As noted, a Conceptual Master Plan outlines the general
concepts for laying out a building and parking. Then the details are more fleshed out in the
second step of the process with an Administrative Site Plan Review that involves the Planning
Office and other regulatory agencies. For this project, they are providing parking spaces well
above the minimum requirements based on the buildings that they hope to construct and then the
additional parking area that will be established. They will have to provide bicycle parking at each
of these locations and items related to lighting of those parking areas and for the building sites,
things like dumpsters. The frontage of this property will need to be improved with a street
frontage sidewalk and then connecting sidewalks from that sidewalk into the site to serve each of
these areas. Since they don’t know who the tenants of the individual buildings will be, there is no
building architecture that is being presented to the Commission this evening. When they move
into that Administrative Site Plan process, if this goes forward, they will have to revisit the
Planning Commission with that architecture. As with any site development, there is some
landscaping and tree planting requirements for the project site. There is tree planting based on
the size of the areas of the development and then from a landscape requirement, this property is
located where an arterial street buffer is required. That minimum buffer is thirty (30) feet in
depth when measured from the right of way. Their initial proposal is showing that being
implemented for the plan. The Planning Office provided review comments on the plan being
revised for these two buildings and then the parking lot area. Key things for them to continue to
work on will be bicycle parking, the overall pedestrian circulation for both along the frontage
and then moving into this overall site area, and then greater details on the Landscape Plan to
ensure that we are meeting our tree planting and the lot coverage limitations that may be
proposed on the particular areas of the site. They did make one waiver request and that was for
the elimination of upright curbing. Your Zoning Ordinance allows the City Planner to grant
approval of that request and we have done so. It is the elimination of select areas of curbing
related to what is anticipated to be their stormwater management design. So that will be looked
at even more so when we get actual real buildings to be placed these locations. The other
recommendations that the Planning Staff had made for this project are outlined on Page 9 of our
DAC Report. They go onto discuss ensuring that pedestrian circulation is clearly delineated and
that with landscaping that there would be a greater mix of tree species so that we don’t see all of
one type. Then if some bug likes that one type, then you have no trees. Certainly, with the area
that is to be the redeveloped or improved parking lot, there are some landscaping requirements in
the parking lot areas that they will have to ensure that they are meeting. Along Bay Road, for the
installation of sidewalks, they will have to work with whether that happens on their property or
within the available right-of-way along that street frontage. We do recommend in the area that is
to be the parking lot, to implement parking lot islands with upright curbing in appropriate areas
to help with traffic circulation and control in those areas to guide where the major circulation
should be versus driving down a parking lot aisle. She will note that there is an opportunity for
interconnection with this property and to the properties located just to the south. With the
13
15
Page 16
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
development of the properties off of Stover Boulevard and Energy Drive there was a service road
connection that stubbed into this Blue Hen Corporate Center property area. But it is not fully
established because of lack of easements to do so and really the property design on the corporate
center side. We also note that if they plan on having electric vehicle charging that is easier
planned at the beginning rather than later. The various Development Advisory Committee
participants have also provided comments and those coming from the typical agencies: the
Department of Water/Wastewater, the Public Works Office, the Electric Department, the Fire
Marshal’s Office, DelDOT, the Kent Conservation District, the MPO and also from Chesapeake
Utilities.
Mr. Richard stated that there is also an owner/representative from Pettinaro Construction
Company online tonight in case there are any questions that arise for the owner itself. As Mrs.
Melson-Williams previously mentioned, this is the Blue Hen Corporate Center with the pad sites
being the three stars on your screen. The overall parcel in the middle happens to be about 18
acres, the one to the left is about 2.3 acres and the one the south which is on the right is about 3.1
acres, summing to just shy of 24 acres. The present uses are parking lots of the building which
have not been utilized in probably several years just because of the lack of the parking necessary
for the Blue Hen Mall or Corporate Center as it transitioned throughout the years. The Blue Hen
Mall is a very old facility that was built before his time. Obviously, the proposed uses would be
two commercial pad sites with a parking on the southern side, just kind of revamping that
parking area on the south side there. That has a Source Water Protection Overlay Zone attached
to that as well. With that, we will make the improvements necessary to comply with the SWPOZ
(Source Water Protection Overlay Zone) which he believes is ultimately a reduction in
impervious surface. The two buildings are 8,000 SF a piece holding about 16,000 SF and
requiring about 54 parking spaces. As Mrs. Melson-Williams had mentioned, this is well over
parked given the nature of this used to be the Blue Hen Mall with just over 500 spaces. The next
slide gives a little more of a detailed view of what’s going to happen for Building 1 and Building
2. Building 1 is the one to the left which is encompassed by the Firestone on the left-hand side
and the Enterprise just on the right-hand side of that building. Then Building 2, which is directly
adjacent to Way Back Burgers. The next slide shows a bigger view of the south parking lot. As
Mrs. Melson-Williams had previously mentioned, nearby is the service road that was built with
the Stover Professional Campus at that particular time. There is certainly a possibility to make a
connection there to make that service road go all the way through. The next slide is a color
rendering of this with the appropriate landscaping that is up there with the buffering that we are
required given the fact that this is an arterial buffer. What was not shown on this plan at that
particular time was the sidewalk interconnectivity. We do not have any opposition to that. It will
kind of give it a better networking to access the Corporate Center itself. We actually have
discussed that with Mrs. Melson-Williams and we are going to be working through that
particular process with her when the Administrative Site Plans come through for these three
parcels. The only waiver that we are requesting is the upright curbing waiver for stormwater
management in certain areas. These pad sites all drain towards Bay Road. Therefore, they are
going to be draining through the landscaped area and the necessary upright curbing waiver will
really help the situation for sheet flow across the parking lot towards those existing storm drains
that are out there adjacent to the right-of-way. They have reviewed Staff’s Report and they are in
agreeance with everything that is mentioned in there and coming back for the Administrative Site
Plan reviews and ultimately coming back for the building elevations to be reviewed by this
14
16
Page 17
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
Commission to actually see the architectural elevations and so forth at that time. As previously
mentioned by Mrs. Melson-Williams, we do not have a current tenant for this particular project
itself. This is a Master Plan so we are just trying to strategically plan ourselves for the future for
future development on this parcel itself. When that information becomes available, obviously the
building elevations will show how the potential tenant could potentially be.
Mr. Witham opened the public hearing.
Mr. Zach Prebula – Kent Economic Partnership 555 Bay Road Dover, DE 19901
Mr. Prebula stated that as mentioned earlier, part of our role is supporting business expansion but
our overall role is to locate and attract businesses to Kent County. This project here will help us
do both and speed to the market with doing those. Attraction and supporting business expansion
is vital as businesses are looking to move faster than ever now a days and by approving this, you
can help get this one step closer to being ready for the market to attract and support our
businesses and create jobs here in Kent County and Dover.
Ms. Andrea Fineroski – Pettinaro Construction
Ms. Fineroski stated that she just wanted to thank Mr. Richard for such a good presentation. I
typically do attend these meetings myself; however, she is moving tomorrow and was unable to
make the trip down to Dover tonight. If anyone has any other questions, she would be glad to
answer them. She thinks Mr. Richard did a fantastic job on the presentation. We conferred on
this during the day today and she thinks he touched on everything that we have done with this
project so far.
Mr. Witham closed the public hearing.
Mrs. Welsh moved to approve S-25-12 Blue Hen Corporate Center Pad Sites Master Plan (as
Revised) as presented to the Commission; it was well done and it seems like it’s a good use for
those vacant areas of the property.
Mrs. Maucher stated that she wants to make a friendly amendment to include the partial
elimination of the upright curbing waiver request.
Mr. Witham stated that since she brought that up, he has a question for Mrs. Melson-Williams.
Do we need to approve your action on the waiver? Responding to Mr. Witham, Mrs. Melson-
Williams stated that in regard to the waiver request for upright curbing, the authority is granted
to the City Planner but you can certainly recognize that in your motion. The other thing the
Planning Staff would want to confirm with the motion maker and the seconder is whether or not
they are referring to the Development Advisory Committee Report and comments as part of your
recommendation of approval. Responding to Mrs. Melson-Williams, Mrs. Welsh stated yes.
Mr. Witham asked if Mrs. Welsh agrees with the amendment. Responding to Mr. Witham, Mrs.
Welsh stated yes, she does.
Mrs. Welsh moved to approve S-25-12 Blue Hen Corporate Center Pad Sites Master Plan (as
Revised) as presented to the Commission; it was well done and it seems like it’s a good use for
15
17
Page 18
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
those vacant areas of the property and to include the waiver request for the partial elimination of
upright curbing and the DAC Report and comments, seconded by Mrs. Maucher and the motion
was carried 7-0 by roll call vote with Mr. Lewis and Dr. Jones absent. Mrs. Welsh voting yes; for
the reasons stated in the motion. Mr. Roach voting yes. Mrs. Denney voting yes; she is looking
forward to seeing yet another Becker Morgan Group project come to fruition soon. Mrs.
Maucher voting yes; based on the DAC comments. Mr. Baldwin voting yes. Mr. Reaves voting
yes. Mr. Witham voting yes; based upon the comments tonight before the Commission and based
upon the DAC comments as well.
S-25-14 LivSmart Extended Stay Hotel at 530 and 540 Bay Road – Public Hearing and Review
of Site Development Plan for new 5-story hotel of 113 rooms as a Hilton LivSmart Extended
Stay Hotel and with associated parking lot and site improvements. The project will involve the
consolidation of two parcels totaling 2.20 acres +/-. The properties are zoned C-4 (Highway
Commercial Zone) and are located at the southwest corner of Miller Road and Bay Road with
Martin Street to the west. The owners of record are Bay Road Four, LLC and Bay Road Three,
LLC and the equitable owner is Weathervane Capital Partners. Property Addresses: 530 Bay
Road and 540 Bay Road. Tax Parcels: ED-05-077.00-01-45.00-000 and ED-05-077.10-01-10.02-
000. Council District 2. Waiver Requests: Reduction of Arterial Street Buffer and Elimination of
Loading Berth. The most recent application was S-21-05 Bay Road Office Park Master Plan
(Revised) granted conditional approval by the Planning Commission in May 2021; it is expired.
Representative: Mr. James Curran, Century Engineering; Mr. Mike Murchie of Weathervane
Capital Partners
Mrs. Melson-Williams stated that this is for a hotel project at 530 and 540 Bay Road. This
request is made up of two parcels of land that are zoned C-4 (Highway Commercial Zone). This
is a proposal for a five-story hotel consisting of about 113 rooms. It is an Extended Stay Hotel
and along with that there is the associated parking lot that surrounds the building. The two
parcels working together here make up the site and they will be combined as part of their project
activities. The properties are located on the west side of Bay Road and is bounded by Miller
Road which is on the right-hand side of this image and Martin Street which is at the top of the
image and then the property to its south or left is other lands that are owned and already
developed. There is an entrance drive that leads back to the office building that is currently
occupied by Century Engineering. That entrance drive is important because it is one of the access
points to this property along with an access point from Miller Road. With the property being
zoned C-4 (Highway Commercial Zone), they have to follow those bulk standards. Parking for a
hotel is based on a rate per guest room along with some additional areas. They include office
space. Based on the rooms and that extra space, they would be required to have 117 parking
spaces and they have above that. Also associated with parking, there would be a requirement for
bicycle parking based on the number of spaces they are providing. They would be required to
provide 7 bicycle spaces. We need to clarify with the applicant this evening if they are seeking a
waiver of those bicycle parking spaces. Other site elements that we have on this plan include the
required dumpsters, street lighting; and she did speak to access which comes from both an
existing street there of Miller Drive and then the shared commercial existing driveway that leads
from Bay Road basically back to a property in the rear. Other parking requirements include a
waiver request for the elimination of the loading berth requirement. They do have kind of a drop-
16
18
Page 19
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
off area at the front of the building, but our Code would require more than just one based on the
size of the building. So, they are seeking relief from that. The applicant has presented building
architecture and we will see more of that in their presentation. They have provided information
about all sides of the building since it will be visible from multiple streets. With this property,
they are required to have a tree planting requirement. There was some indication in a data
column that there might be woodlands on the site and she thinks the applicant has been
reevaluating whether or not the existing vegetation is truly woodland on this property or not.
That has some implications on their tree planting requirements so we will hear about that. They
are requesting a waiver for the reduction of the Arterial Street Buffer, seeking to go from the 30-
foot requirement down to 20 feet. She will note that one of these properties at 540 Bay Road did
previously receive that relief as it was proposed earlier for a different development scenario but
that has since expired. Additionally, because this property is across the street from residential
when you look at Martin Street, there are some parking lot screenings. They will be
implementing that for those parking spaces that face that road. The Planning Staff has provided a
number of comments. They are recommending approval of both the elimination of loading berths
and the reduction of the Arterial Street Buffer to 20 feet. They are also asking them to clarify the
cross-access easement to be able to utilize that shared entrance drive that was previously planned
and exists on the adjacent property. Likewise, the Development Advisory Committee Report
continues with comments from our regulatory agencies including the Department of Public
Works, Department of Water/Wastewater, the Electric Department, the Office of the Fire
Marshal, DelDOT, the Kent Conservation District, the Dover/Kent County MPO, and
Chesapeake Utilities with those agencies providing technical review comments and advisory
comments in other instances.
Mr. Curran stated that the LivSmart Extended Stay by Hilton is proposed at 530 and 540 Bay
Road. The total area is 2.2 acres. It’s a vacant lot. There is some vegetation down the center. We
did look at that; it does not meet the qualifications or definition for woodland; it’s a hedgerow so
that will be revised on our plans. Water, sewer and electric are all available on the site. It is
situated along Bay Road between Miller Road, Martin Street, and the Century Engineering
entrance road. The existing concrete for the previous use that has been demolished will be
removed. The zoning is C-4 (Highway Commercial Zone) and hotels are a permitted use. We are
proposing a five-story extended stay hotel and the gross square footage is about 57,000 SF;
11,000 plus SF on each floor and 113 guest rooms. We are proposing sidewalks along Miller
Drive and Martin Street and the connection of the existing sidewalk on the opposite of the
Century Engineering entrance road, a shared use path along Bay Road connecting to our Miller
Drive intersection with a crosswalk and handicapped ramp on the opposite side of Miller Drive.
There is no access directly from Bay Road. Entry will be from the Century Engineering access
drive and Miller Road. We did uncover the recorded plan that shows a 30-foot-wide shared
access easement along the Century Engineering drive so that shouldn’t be a problem. They are
requesting three waivers as Mrs. Melson-Williams mentioned. They are asking for a waiver from
the 30-foot Arterial Street Buffer requirement along Bay Road. We are providing 20 feet and can
fit all of the required landscaping within the 20-foot buffer. No widening from DelDOT is
required along Bay Road so that existing width will remain. They are requesting a waiver from
providing an off-street loading berth due to the nature of this hotel. There are very few deliveries
of linen and some concessions for vending machines and office supplies that will be done. There
will be small box trucks that can be unloaded from the front entrance. They are also looking for a
17
19
Page 20
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
waiver from the bicycle parking requirement. They do understand the importance of bicycles and
adequate bicycle facilities; however, with an extended stay hotel, very few if any patrons require
their bicycles to stay there. We have very few employees and any guests who do bring their bikes
can keep it inside due to weather and other financial reasons. They add that there are no
restaurants or bars, banquet facilities, or conference facilities in the hotel. It is generally the
residence rooms, a small gymnasium for the guests, and a small laundry area for the guests. At
an extended stay, you don’t expect any other patrons other than the people staying at the hotel.
They did receive all of the comments and letters. They do not agree with the recommendations
from the Dover/Kent County MPO about extending the shared use path on other frontages north
of the Miller Road intersection. There is drainage and other concerns about adding that along the
frontage of other uses. They have the existing sidewalks along Martin Street for pedestrians if
they would like to walk to Martin Luther King Jr Blvd. They have an existing sidewalk along the
south side of the Century entry road and we are providing connections to there. There is very
little traffic so adding sidewalk along the north side is not necessary. As he explained for the bike
racks, they do not propose any bicycle racks outside for this use. The next slide shows a
prototype of what the hotel will look like. Most of the parking is in the front; there will be some
parking in the back. On the plan, we have 123 parking spaces. We may need to lose 2 of those to
add an emergency generator; so, they will probably end up with 121 spaces which are still about
four more than what’s required per Code. The remaining slides are just the different views of the
hotel: the front, the back, there is a small patio area in the back, and the two sides.
Mr. Witham stated that Staff notes that the plan itself is difficult to read the location and details
of the sidewalk along portions of Martin Street at the intersection of Miller Road. Has that been
explained? Responding to Mr. Witham, Mr. Curran stated that he doesn’t think he touched on
that but they will make the plans more legible. There is sidewalk from Miller Road to about
halfway down Martin Street where the right of way ends. The sidewalk is along the curb line and
they will tie into that sidewalk and extend it to the Century Engineering entrance drive. There is
also sidewalk from about where our entrance is on Miller Road towards Bay Road. In between
our entrance and Martin, there is not sidewalk and they will be adding sidewalk so that it’s all
interconnected.
Mrs. Maucher asked what is considered an extended stay. Is it weeks, months? Responding to
Mrs. Maucher, Mr. Murchie stated that in the industry, an extended stay is considered for people
generally staying more than a week and sometimes they may stay a few months. You might think
about someone going through relocation and their home is not done yet so they will stay for a
week or a few weeks. It could be a traveling contractor working at the Air Force Base. So, we do
expect that a good percentage, probably more than a third of the people staying there, will be
staying for more than 10 days.
Mrs. Maucher asked what the amenities were that they were including at the hotel. Responding
to Mrs. Maucher, Mr. Murchie stated that the amenities that are being included are what is
typically important by Hilton in today’s environment and that is a really nice gym for people
who work out and a really nice laundry room for people to do their laundry. Also, by the front
desk there will be a really nice coffee bar for people to have their morning coffee in.
Mr. Witham stated that he anticipates that some of your cliental is going to be people who are
18
20
Page 21
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
working at the Air Force Base. Responding to Mr. Witham, Mr. Murchie stated that they could
be for sure. We work with Hilton on the location of our LivSmart and they have a kind of profile
on what they think some of the residents will be and whether it could be Air Force Base.
Traveling nurses or traveling doctors is also kind of common. He toured one of these LivSmarts
in Tennessee and it was nurses and construction technicians.
Mrs. Welsh stated that she thinks she saw a colored rendering that was up on the screen. Could
that be put up again? Just from the description of the colors, she was envisioning more black than
that but that (image) answers her question.
Mrs. Melson-Williams stated that for those that have joined us online, the image that you are
seeing on screen is also being presented on a board here in the room that shows a color palette
that is more in the white and gray with a portion of it looking like it’s somewhat charcoal or lead
pencil color.
Mr. Witham opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mrs. Welsh stated that she heard the gentleman make the presentation, she believes he
commented that they disagreed with the MPO comment on one of the issues. Can she be
refreshed on that? Responding to Mrs. Welsh, Mr. Curran stated that the MPO requested that we
extend the shared use path beyond our project another 500 feet towards Martin Luther King Jr
Blvd. There are a lot of concerns with that. We are extending our shared use path to our frontage
at Miller Road, a crosswalk at Miller Road, and a proposed handicap ramp for a future
connection. There is drainage. There are like swales on the shoulder and grass that would have to
be navigated in order to do that. In addition, along Martin Street, they have both sides of the road
with sidewalks so he thinks it would be safer for pedestrians to walk along the back roads if they
needed to get to Martin Luther King Jr Blvd. if they needed to do any shopping.
Mrs. Welsh moved to approve S-25-14 LivSmart Extended Stay Hotel at 530 and 540 Bay Road
inclusive of the waiver requests for the reduction of the Arterial Street Buffer, the elimination of
the loading berth, and in accordance with all DAC comments, seconded by Mrs. Denney.
Mr. Witham asked if she was including the waiver for the seven bicycle parking spaces.
Responding to Mr. Witham, Mrs. Welsh stated yes.
Mrs. Welsh moved to approve S-25-14 LivSmart Extended Stay Hotel at 530 and 540 Bay Road
inclusive of the waiver requests for the reduction of the Arterial Street Buffer, the elimination of
the loading berth, and the elimination of seven bicycle parking spaces and also in accordance
with all DAC comments, seconded by Mrs. Denney and the motion was carried 7-0 by roll call
vote with Mr. Lewis and Dr. Jones absent. Mrs. Welsh voting yes; for reasons stated in the
motion and she thinks it is a good use of the property. Mr. Roach voting yes. Mrs. Denney voting
yes. Mrs. Maucher voting yes; based on DAC comments. Mr. Baldwin voting yes. Mr. Reaves
voting yes. Mr. Witham voting yes; based upon the recommendation of Staff as well as the
presentation tonight and he thinks he would agree with the comments from the applicant not to
approve the extension of the walkway.
19
21
Page 22
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
S-25-15 7-Eleven with Fuel Pumps at 736 and 738 N. DuPont Highway and 1021 & 1027 N.
State Street – Public Hearing and Review of Site Development Plan for redevelopment of four
parcels (to be consolidated) for a 4,816 SF convenience retail store with fuel pumps under a
canopy and associated site improvements. The existing buildings on the properties will be
demolished. The properties are located on the east side of North State Street and west of DuPont
Highway. The properties are zoned C-4 (Highway Commercial Zone). The owner of record is
Harrington Four Seasons, LLC and the equitable owner is Dover DuPont State, LLC. Property
Addresses: 736 N. Dupont Highway, 738 N. DuPont Highway, 1021 N. State Street and 1027 N.
DuPont Highway. Tax Parcels: ED-05-068.09-01-07.00-000, ED-05-068.09-01-06.00-000, ED-
05-068.09-01-04.01-000 and ED-05-068.09-01-04.00-000. Council District 3. Waiver Requests:
Reduction of Arterial Street Buffer and Partial Elimination of Upright Curbing.
Representatives: Mr. Mike Kaezyski, Atwell, LLC; Mr. Michael Harrington, Sr., Owner; Mr.
Michael Harrington, Jr., Owner; Mr. Michael Carp, Dover DuPont State LLC; Mr. Edward D.
Scott
Mrs. Melson-Williams stated that this is another Site Plan for us this evening found basically
near the intersection of North State Street and North DuPont Highway. It encompasses a total of
four parcels currently and she will just note those for the record: 736 and 738 N. DuPont Hwy,
1021 N. State Street, and 1027 N. State Street. These are properties that have existing buildings
on them. We will see some more about that in the applicants’ presentation but they are all zoned
C-4 (Highway Commercial Zone) and the proposal is for a convenience store with gas pumps.
Both of those are uses that are allowed in the C-4 (Highway Commercial Zone) zoning district.
The gas pumps have some additional caveats to them as they are considered a motor vehicle
service type activity. The surrounding use to the north of this is where you find the TD Bank and
then there are other commercial properties located to the south of this collection of properties. As
noted, the C-4 (Highway Commercial Zone) has bulk standards which they are meeting for the
project. With the addition of the gas pumps, we have to look at the provisions for motor vehicles
services in the C-4 (Highway Commercial Zone). They are complying with those and they have
provided us with information regarding one of the things that they had concern which is when
they have an entrance drive that has to be at least ten feet from the property line. There was some
concern about the southern access point onto DuPont Highway but they believe that their design
can be adjusted to accommodate that in particular. The property meets its parking requirements
and is providing the associated bicycle parking. Site access to this site will be both from N. State
Street and also from the southbound lanes from DuPont Highway. That will function as they are
designed as a one-way circulation for a right-in and a right-out on that DuPont Highway side.
They are proposing to construct the sidewalk on the property frontages making adjustments as
necessary with their new entrance designs for that. The project does include the dumpster and
then they do have a couple of wavier requests. Planning Staff has already recommended
authorization of the partial elimination of upright curbing associated with some of their
stormwater management planning and also for access immediately around the building so that it
will be level entry from the parking areas that are already there which also include their
handicapped parking locations. The building is further protected by a barrier system of bollards.
The other waiver is related to a reduction in the Arterial Street Buffer going from 30 feet to less
than that. That is required on the DuPont Highway frontage of the property. This project will be
dedicating additional right-of-way to DuPont Highway so there may be additional green space
20
22
Page 23
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
that is not physically on their property but within the right-of-way. They are asking for relief on
that side but include landscaping in that area as required. They have presented building
architecture for both the convenient store building and the separate gas canopy. We will see
some more details about that in their presentation. This, again, has some parking that would be
facing across the street towards residential. There is an apartment complex on the opposite side
of N. State Street. They are implementing a hedge type planting to help screen that. As noted, the
Planning Office has provided comments on the review of this application. They will have to
include ultimately a Record Plan to combine all of these parcels together and also work with
DelDOT on their entrance plan approvals, ensuring that they are meeting that code requirement
in our Zoning Ordinance about distance to a property line for those entry/exit points. The
Planning Staff, as noted, is in support of the waiver request for the Arterial Street Buffer and for
the upright curbing that they already granted. They did, in their recommendations, note that they
would like the applicant to look at the location of the bicycle parking. While they are providing
it, it’s currently located on the north side of the circulation drive and Staff thinks it would be
better served and increase safety if they could be located in closer proximity to the building
itself. With the building architecture, they did also note a concern on the elevation that faces N.
State Street in that it appears to be a fairly blank building space with limited architectural relief.
They ask that the applicant look to bring a number of the materials that animate the rest of the
building facades onto that front of the building. It does have an entrance door on it as well from
that small parking lot area. Likewise, the Development Advisory Committee Report continues on
with the various agency comments from our Department of Water/Wastewater and Public
Works, the Electric Department, the Fire Marshal’s Office for the City, DelDOT, the Kent
Conservation District, the MPO, and also from Chesapeake Utilities.
Mr. Kaezyski stated that tonight he has with him Mr. Michael Harrington, Sr. and Mr. Michael
Harrington, Jr, the owners of the property. Online we have Mr. Michael Harp with Dover
DuPont State LLC; he is the developer of the project and he is working on behalf of the 7-
Eleven. The next slide shows an aerial context view overall. In the middle of the view, you see
the rendering of the site itself. Across the street is the large area that was a project that is under
construction. There is a shopping center in front with some apartment buildings in the back
where the overflow of parking is off the right-hand side there. To the left-hand side, you can see
the lake and the apartment complexes across the street on State Street. What you see is DuPont
Highway which runs north and south kind of up and down through the middle of the plan view
itself. State Street splits off towards the top and runs towards the lower left corner. Our property
itself fronts on both State Street and DuPont Highway. The next slide shows an aerial view of the
existing property itself. You can see the extent of the development on the site. As Mrs. Melson-
Williams mentioned, this is the assemblage of four parcels that the Harrington’s own. There are
one or two different LLC entities that own the properties. We will consolidate that and complete
the Consolidation Record Plan as we receive the final plans when we get to that point later. To
the north, you can see the TD Bank as it exists and the drive through lanes that circulate around
the property. They have an entrance off of State Street. For our site itself, we have a rather wide
entrance off of State Street. The two properties are in the back. There are two parcels that front
that you can see the two separate buildings: a kind of white shaded building on the upper side
there and a darker smaller building in the lower left corner and two buildings that front along
DuPont Highway that make up the four parcels. You can see how this is a rather extensive
development on the site right now and the impervious coverage will show that we are actually
21
23
Page 24
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
reducing the impervious coverage by about 10% from about 80% down to 70% overall and we
are increasing the green space. There are two other features to point out on this plan. Along the
State Street side just north of the white building that you see there on the TD Bank property is
one of their larger stormwater facilities just south of their entrance and then over on the DuPont
Highway side, there is a green wedge where the drive through lanes wrap around and are parallel
to DuPont Highway, that is their other stormwater management facility. There is a comment that
came through from the MPO that talked about a possible connection to each driveway. A
presence of the existing stormwater facility and the type of circulation that you see there makes
that impractical.
The next slide shows a plan view of the site as it would be developed. You can see in the green
how much additional extents of green that we will have. As he mentioned, they are going from
20% open space to 30% open space. It is about 3/10 of an acre to about almost a half-acre of
pervious coverage or open space coverage that you would see on the site. We do have two
stormwater management facilities of our own that are situated in the back. You see the store
building itself in the middle of the property. The lighter shade is the parking that already
surrounds the building; that will be concrete. To the left-hand side, you see a rear parking lot.
Just beyond that, there is a darker green that is kind of an almost triangular shape. That is a larger
stormwater management facility. We have it mapped and likely in the bio-retention as it does
have infiltration capability. The smaller facility on the north side essentially picks up the
entrance driveway itself and a small part of the north side is stored there. You can see the fuel
pumps facing DuPont Highway. This is what they recall a six MDP or manual dispensing pump
facility with twelve fueling locations with one on either side of each dual island. So, you have
twelve places where people can fuel up and be able to park and fuel. You will be able to get in
between cars that are sitting there being fueled. The layout of the pumps themselves are laid out
so that you have sufficient circulation and you are not blocked by somebody that is sitting there
fueling.
There were two waivers that were mentioned here. The first is the flush parking that we have. As
he mentioned, the light gray that surrounds the store will be concrete. You will have a concrete
parking area that blends flush into the walkway of the building itself. There will be a series of
bollards that are set about 4-5 feet apart around the facility. You typically see these at other
similar convenient stores in the area that are constructed. We will call them the red stores and the
blue stores; and you can probably figure out which ones they are as they are competitors here.
But you will have that type of situation where you have ease of pedestrian traversing from the
parking here into the store no matter where they are. This would include handicap accessibility
from the pumps into the store itself which they typically try to locate the accessible pump
location in line with where the handicap spaces are so that you have a straight walkway, but no
matter where you are you have an ease of access into the store. The second waiver that we had is
related to the required 30-foot buffer along DuPont Highway, this is physically possible. The
width of that green space that you see there is close to about 50 feet. What we do have here,
DelDOT requires up to dedicate right of way to a distance of 30 feet behind what they call a
white stripe or the edge of the travel lane. So, the outer or southbound through lane, 30 feet off
set from where the right-of-way sits. On this plan, they need to dedicate about 10 feet or so to
DelDOT to meet dedication requirements for right-of-way. That leaves about 23-24 feet of actual
green space behind that proposed right-of-way line. But effectively, the green space itself will be
22
24
Page 25
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
well in exceedance of 30 feet. The next slide shows the landscaping around the site. You can
kind of see behind the stormwater management facility; there is a green line that is a hedgerow
line that they will have to shield the parking spaces themselves from the roadway. It will be
hedge type planting and they will also have a whole series of street trees and lot trees
surrounding that stormwater management facility back there. For the stormwater management
facilities, the two bio-retention areas will be planted with wet tolerant perennials so you will see
vegetation at this facility and some color seasonally as you would typically see there. Along the
front itself, you will also see plantings there to kind of screen the front end off and not totally
hide that but enough to block the view from the street. There were two comments that came in
regarding the access for the site. It is a little difficult to see on this plan but you may see it on the
copy that you did receive. The first comments came in from the Planning Department of the City.
With the south entrance itself, the curb line needs to be 10 feet set off from the property line and
we can adjust our curb line to meet that 10 feet. That will actually close off that access driveway
and make that a little narrower. The intent here is to have a one way in and one way out access
along DuPont Highway. That will be accomplished through signage and striping on the
pavement. We will actually stripe it “do not enter” as well as provide a “do not enter” sign and
one-way signs at both entrances. We will provide what they call core striping, the white striping
at that northern entrance as well so that it appears to be channelized. The throat width itself is
necessary to allow for delivery tractor trailers and fuel trucks and the product trucks that come
into the store to be able to make the turn in off of Route 13 without having to cross into
additional through lanes. They can make a right from the far-right lane of Route 13 to turn into
the site. Our trucks typically enter from Route 13 through the site and then exit left or right onto
State Street. They have also modeled where they can bring trucks in off of State Street and they
can make the maneuvers on the site to then exit off of State Street as well depending on the time
of day that they come in with backing maneuvers and things like that within the driveways
onsite. The next slide shows the architecture for the elevations of the front and back of the store.
You can see the front on the top shows a dual door entry and the storefront windows and the
different materials on the façade. The high façade along the front is a parapet type of treatment
along the front. The back wall is a little more plain as it was originally set up in the prototype
and we are working with 7-Eleven to incorporate some of the features that you do see in the front
in the back as well to kind of dress it up a little bit. We will provide those as we go through the
Construction Plans to the City for review before Final Plans. The next slide shows either side of
the building. What you see at the top should be the view as you are driving northbound on Route
13. The view on the bottom end would be as you are driving southbound on Route 13. You can
see where there is differentiation in the architecture and there may be features that they can
incorporate in the back as well to dress up that rear elevation. We have discussed the four parcels
that will be combined here and the two waivers that we do have. The parking that they have
proposed onsite is 30 parking spaces; 16 are required so we are well exceeding the parking
requirements for the proposed use. We are working with DelDOT on the entrances themselves.
They have forgone a traffic study for this property. The existing 7-Eleven that is just to the south
of this will likely be relocated to this location here, especially with the addition of the fuel
pumps. Operating two stores basically two doors down won’t necessarily work so likely we will
see that relocation. We are also working with the Kent Conservation District. We have had our
presubmission meeting and discussed all of our stormwater. We are just about ready to submit
final construction plans to the Kent Conservation District for review of the stormwater
management facilities which have been designed in accordance with the infiltration testing that
23
25
Page 26
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
they have received last month. So, we are proceeding as we go through Planning Commission
here and then look to submit construction plans to the Kent Conservation District and DelDOT
and then move towards final plan approvals this winter.
Mrs. Denney stated that there’s the request from the Planning Office to move the bicycle
parking. Can you tell me what’s happened with that? Responding to Mrs. Denney, Mr. Kaezyski
stated that it is one comment that the Planning Department did make that he did not mention in
his presentation here. From the store itself, basically directly north kind of where the notch is in
the paving; just after that notch is where the bicycle parking is located now. We are looking to
bring that into the store area itself. Ideally, if he can locate it, there are typically islands on each
corner where we don’t have a parking space. They are a little tight on this site. We will see if we
can make that work with 7-Eleven. The other option may be on the south side of the store where
we can get parking but still have access to get the bikes there. One thing that we might do is
remove one parking space to be able to physically get in there but he thinks that they could also
shift parking to provide a driveway, essentially an access alley way to get into if we locate bike
parking at that location, but we will get it as close to the store as we can.
Mrs. Denney stated that if it changes, you will not have to cross as a pedestrian in front of a car.
So, we have eliminated that issue. Responding to Mrs. Denney, Mr. Kaezyski stated that it is
correct, we can see if we can accommodate that. The other location that we may have is at the
back on the far side where the parking spaces are towards the stormwater management area. You
cross a driveway there but it’s not a major driveway. You do have pedestrians that will be
walking along the frontage on either side if they were walking in the provided walkways from
both frontage sidewalks that we have. You still would have those and it wouldn’t be much
different if you had to cross a driveway with your bicycle. If we can make it easier and we are
able to fit it up closer to the store, we will definitely do that.
Mrs. Welsh stated that she has looked at the MPO comments regarding the traffic in the ingress
and egress. You did answer that in your presentation about one way in and one way out, but you
kind of piqued her interest on the safety issue for ingress and egress on State Street particularly
when you said trucks were going to be coming in and out of there. You said trucks would be
using that entrance? Responding to Mrs. Welsh, Mr. Kaezyski stated yes.
Mrs. Welsh stated that she has driven that road 100,000 times and she just has concerns with a
truck making a left hand turn out of that entrance to try to go south on State Street because the
traffic coming off of Route 13 coming south on that road doesn’t slow down. Even a car that
would be coming south and trying to turn left into the 7-Eleven, is going to be crossing what she
sees depicted as a double yellow line and then over two lanes of traffic going north which they
don’t really go too slow when they are trying to make the light there. So, she has serious issues
there as far as safety concerns. Responding to Mrs. Welsh, Mr. Kaezyski stated that as he
mentioned, we have been working with DelDOT on this and we are processing our construction
plans for this now. They have examined the plans themselves. We do have a right in/right out,
essentially access off of DuPont Highway that is split between the two access points one way in
and one way out. We have full access at the rear. Right now, what are out there is just the
through lanes themselves. We will construct the right turn lane into the site so that you will be
able to pull off the roadway and make the turn into the site. We will also construct a dedicated
24
26
Page 27
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
left turn lane within the existing median. That is out on State Street so you will have a place as
you are looking to make the left to pull in there coming south off of Route 13. The posted speeds
are low in that area; he believes that it is actually 25 MPH.
Mrs. Welsh stated that doesn’t mean anything because no one follows that. It’s just that it is so
close to the intersection there. Responding to Mrs. Welsh, Mr. Kaezyski stated yes, they have
been able to demonstrate that the turn lanes that we would need would fit within the existing
lanes to the roadway that is already out there. We wouldn’t have to encroach in either of the
existing turn lanes so we are not modifying anything else. We are just adding for our site itself.
As far as the truck movements, we would need to demonstrate that we have the turning templates
for the various types of trucks that would access here for DelDOT to review. We have shown
that the trucks can make the turns without encroaching onto oncoming traffic. If they make the
right out in the right turn lanes or in the northbound through lane or if they make the left in, then
they stay within the lane itself and they don’t have to cross out. The same thing coming off of
DuPont Highway, that they don’t have to cross over additional through lanes to make the turn in.
All of that they will need to demonstrate to DelDOT before final entrance plan approval is
granted and they will certainly share that with the City as we process our DelDOT approvals for
those.
Mrs. Welsh questioned whether DelDOT hasn’t approved that yet, you are just presenting that to
them as this point? Responding to Mrs. Welsh, Mr. Kaezyski stated that is correct. The MPO
commented that they did have regarded the driveway on State Street for TD Bank and it
suggested possibly combining the two driveways. There are existing stormwater facilities that
TD Bank has on their property right there immediately off of that entrance. The dark green that
you see right there that whole area is essentially one of their stormwater management facilities so
that would be eliminated if you tried to shift the entrance itself and what we don’t want to do is
kind of intermix this site traffic with the bank traffic with the one-way circulation that they have.
If we try to come into the TD Bank and work our way through again, we get closer and closer to
the drive through lanes and it is just not feasible.
Mr. Harrington, Jr. stated that he wants to add one more point to give a little history of the
property where you can see it on S. State Street. addressing your concern or your issue, a year
ago they partnered with DelDOT for a pedestrian sidewalk and bike trail that leads from the
south side going north where Planet Fitness is. They worked with DelDOT and they gave the
land through eminent domain. They gave the land to DelDOT so that they could construct a 35
feet rights in/rights out no curb for pedestrians. If you go north where Planet Fitness is and you
come to our property that is already constructed. So DelDOT has already approved it because
they built the entrance. We thank DelDOT for doing that and they partnered with DelDOT to
make things a lot easier in the future. Responding to Mr. Harrington, Jr., Mrs. Welsh stated thank
you. She appreciates the information and the fact that you are working with DelDOT. She is still
going to cross her fingers and hope that your plans work.
Mr. Harrington, Jr. stated that DelDOT made the construction and we agreed to it. Responding to
Mr. Harrington, Jr., Mrs. Welsh stated that people don’t always follow what you think they
should.
25
27
Page 28
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
Mr. Witham stated that he thinks the applicant is aware that there has to be a separate application
for any signage. Responding to Mr. Witham, Mr. Kaezyski stated yes, that is correct. They
wanted to show at least in context what it would look like. We understand that there is a separate
permit needed.
Mr. Witham opened the public hearing.
Mr. Michael Carp of the Project Team
Mr. Carp stated that Mr. Kaezyski represented our case rather well and doesn’t have anything to
add.
Mr. Edward D. Scott of the Project Team
Mr. Scott stated that he wanted to thank you for your consideration.
Mr. Witham closed the public hearing.
Mrs. Welsh stated that the applicant did answer her other question that she didn’t ask about the
other 7-Eleven. So, do you anticipate that they will be moving to the new location? Responding
to Mrs. Welsh, Mr. Kaezyski stated yes, more than likely. With a close proximity like that, you
are competing with yourself.
Mr. Carp stated that 7-Eleven will close upon termination of their lease.
Mrs. Denney moved to approve S-25-15 7-Eleven with Fuel Pumps at 736 and 738 N. DuPont
Highway and 1021 & 1027 N. State Street including the waiver request for the partial
elimination of upright curbing as well as the reduction of the Arterial Street Buffer as they have
already been approved by the Planning Office and as we have to allow DelDOT to make
whatever recommendations or adjustments that need to be made to the ingress/egress because
obviously it is not within our purview, seconded by Mrs. Welsh and the motion was carried 7-0
by roll call vote with Mr. Lewis and Dr. Jones absent. Mrs. Denney voting yes; she thinks it is a
nice addition there and she thinks that it is in keeping with replacing the one that is currently out
on the highway which she thinks will benefit many. If you just need a little something from there
and you live on State Street, it’s a little complicated to get out there and this will make it far
more convenient for her. Mrs. Maucher voting yes; based on the DAC Report comments. Mr.
Baldwin voting yes; based on previous statements. Mr. Reaves voting yes; for previously stated
comments. Mrs. Welsh voting yes; based on the presentation and the information provided as far
as our questions and issues and in accordance with previous comments. Mr. Roach voting yes.
Mr. Witham voting yes; based upon the excellent presentation made to the Commission and for
the reasons set forth on the record by the Commissioners as well as Staff and the DAC
comments.
NEW BUSINESS
Update on Appointments to Architectural Review Oversight Subcommittee of Planning
Commission
26
28
Page 29
Item 1.
CITY OF DOVER PLANNING COMMISSION OCTOBER 20, 2025
Mrs. Melson-Williams stated that with the Architectural Review Oversight Subcommittee, that is
something that you were working on this summer to appoint as part of your Annual Meeting.
The Commission members were appointed with Mrs. Kathleen Welsh and Mr. Kenneth Roach
and you directed Staff to reach out to the two current design professional members to seek their
availability to continue to serve. She has confirmed from Dr. Chandler that he is interested in
continuing to serve and she is still waiting for a response from Ms. Keifer on her status. At this
point, you can certainly recognize the ability of Dr. Chandler to serve and she will keep working
on Ms. Keifer. She is hoping to have an answer from Ms. Keifer at your next meeting.
PUBLIC COMMENTS OPPORTUNITY – There were no members of the public present
wishing to comment.
Mr. Witham stated that there has been a recent ruling in Sussex County Superior Court involving
the Planning Commission. He wanted the Commission to be aware of it and if you want a copy
of the editorial comments from the Coastal Gazette. Basically, what it is, the case was called
Smokey Hollow LLC v. Sussex County Planning & Zoning Commission. In this case, the Superior
Court reversed the Planning Commission based on the fact that they said the Planning
Commission did not comply with the law and arbitrarily denied a project which exceeded their
authority. It was a planned development before the Commission and they were requiring the
developer to basically eliminate 8 lots based upon an alleged requirement for them to have a
buffer zone next to their development but the law did not require that. Basically, the
development got appealed and the Planning Commission’s decision got reversed. The bottom
line is that we have to comply with the law as structured and follow the Comprehensive Plan and
the Zoning Law. When that Zoning Law gives that discretion, the Court also said that they would
defer to the Planning Commission if they had that discretion. The Court felt that the Sussex
County Planning Commission exceeded their authority. He doesn’t think that it is anything for us
to worry about but it’s the latest court hearing on what a Planning Commission can and can’t do.
He did take the opportunity to talk directly to the Judge. He explained to him that he wasn’t
trying to change the law, but he thought that they were exceeding the law by arbitrarily making a
decision without supporting facts.
Mrs. Denney stated that it makes perfect sense to her.
Meeting adjourned at 10:04 PM.
Sincerely,
Kristen Mullaney
Secretary
27
29
Page 30
Item 2.
City of Dover, Delaware
APPLICATIONS TO PLANNING COMMISSION FOR CONDITIONAL USES, SITE PLANS, SUBDIVISION, & REZONING
Schedule of APPLICATION DEADLINES, DEVELOPMENT ADVISORY COMMITTEE Meeting dates, PLANNING COMMISSION Meeting dates,
and CITY COUNCIL PUBLIC HEARING dates for 2026 filing deadlines. A Pre-Application Meeting must be conducted with Planning Staff
prior to filing of an Application. The submittal procedures are outlined in Zoning Ordinance, Article 10 Sections 1, 2, 3, 4 and 5.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Application 1/2/26 2/6/26 3/6/26 4/2/26 5/1/26 6/5/26 7/2/26 8/7/26 9/4/26 10/2/26 11/6/26 12/4/26
Deadline Rezoning
by 4:00pm 11/20/26
CITY COUNCIL 1/26/26 2/23/26 3/23/26 4/27/26 5/11/26 6/22/26 7/78/26 8/24/26 9/28/26 10/26/26 11/23/26 12/14/26
Rezoning
Ordinance First
Reading
D.A.C. 1/28/26 2/25/26 4/1/26 4/29/26 5/27/26 7/1/26 7/29/26 9/2/26 9/30/26 10/28/26 12/2/26 12/30/26
MEETING
(STAFF ONLY)
D.A.C. 2/4/26 3/4/26 4/8/26 5/6/26 6/3/26 7/8/26 8/5/26 9/9/26 10/7/26 11/4/26 12/9/26 1/6/27
MEETING
(APPLICANT)
PLANNING 2/17/26 3/16/26 4/20/26 5/18/26 6/15/26 7/20/26 8/17/26 9/21/26 10/19/26 11/16/26 12/21/26 1/19/27
COMMISSION
Public Hearings,
Rezoning
Recommendation
CITY COUNCIL 3/9/26 4/13/26 5/11/26 6/8/26 7/13/26 8/10/26 9/14/26 10/12/26 11/9/26 12/14/26 1/11/27 2/8/27
Action on
Rezonings:
Consideration of PC
Recommendation
and Public
Hearing/Final
Reading – Rezoning
Ordinance
***Planning Staff will advise applicants as to the Committee Meetings schedule if applicable to the Application submission. DRAFT 12.4.2025
For Information Contact:
City of Dover Department of Planning & Inspections, City Hall, 15 Loockerman Plaza P.O. Box 475, Dover DE 19903
(302)736-7196 Phone (302)736-4217 Fax www.cityofdover.gov compplan@dover.de.us 30
Page 31
Item 3.
City of Dover
DATA SHEET FOR REVISED SITE PLAN REVIEW & ARCHITECTURAL REVIEW
CERTIFICATION
DEVELOPMENT ADVISORY COMMITTEE MEETING OF December 2, 2025
PLANNING COMMISSION MEETING OF December 15, 2025
Plan Title: The Old Post at 55 Loockerman Plaza, S-25-07 Revised
Plan Type: REVISED Site Development Plan
Location: Northwest corner of Loockerman Plaza and Innovation Way in Dover, DE
Owner: City of Dover
Equitable Owner: Old Post, LLC
Address: 55 Loockerman Plaza
Tax Parcel: ED-05-077.05-04-53.00-000
Size: 1.267 acres +/-
Present Uses: Vacant Building – Former Dover Post Office
Proposed Use: Mixed-Use Commercial and Multi-family Housing (Apartments) and
associated parking
Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
SWPOZ (Source Water Protection Overlay Zone) – portion of site
Building Area: 47,652 SF
Off Street Parking: 62 provided on-site; 29 provided in proposed easement with City of Dover
Sewer & Water: City of Dover
For Consideration: Parking Strategy Statement (Revised)
Revised Architectural Review Certification
with parking to building separation reduction
Active Recreation Area Plan
P. O. Box 475 Dover, DE 19903 31
Community Excellence Through Quality Service
Page 32
Item 3.
CITY OF DOVER
City of
DEVELOPMENT ADVISORY COMMITTEE Dover
Planning
APPLICATION REVIEW COMMENTARY Office
D.A.C. MEETING DATE: December 4, 2025
DRAFT
APPLICATION: Revised The Old Post at 55 Loockerman Plaza
FILE #: S-25-07 Revised REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE: 302-736-7196
This Report for Revised S-25-07 The Old Post at 55 Loockerman Street was updated upon
submission of an updated Site Plan set and associated Revised Architectural package.
Note: This original Review Report was initially prepared by Staff of the Rossi Group (under a
Planning Services contract with the City of Dover). The Report of March 2025 was completed
with additional review and editing by the City’s Planning Office. This Revised Report utilizes
that original Report as a starting point.
I. PLAN SUMMARY (Reviewed Revised Plan Sets of print date 11/6/2025 and updated set
of print date 12/3/2025)
The Planning Commission will act on a REVISED Site Development Plan Application and
associated Revised Architectural Review Certification for the redevelopment of the Old Dover Post
Office property consisting of 1.267 acres for a mixed-use project known as The Old Post. The project
involves the demolition of the rear warehouse portion of the existing building, reconstruction of the
rear portion of the building into four-story apartment structure, and adaptive re-use of part of the
front 4,560 SF portion of the building for restaurant, commercial retail or business space. The
Revision includes proposed increases in apartment unit count from 36 to 42 units and architectural
changes consisting of a second-floor addition to the front wings. The property is zoned C-2 (Central
Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone), and subject to
the H (Historic District Zone). The property is located on the north side of Loockerman Plaza and
adjacent to Innovation Way. The owner of record is Old Post, LLC. Property Address: 55
Loockerman Plaza. Tax Parcel: ED-05-077.05-04-53.00-000.
The Project Site is subject of HI-25-01 Revised The Old Post. At the Historic District Commission
Meeting of November 20, 2025, the Commission considered the Revised Application and have
provided a Recommendation on the Architectural Review Certification for the project. (See
attached Recommendation Report (to be attached for Planning Commission Packet.)
The Site Plan S-25-07 The Old Post was granted conditional approval by the Planning Commission
on March 17, 2025. This Application Revised S-25-07 will be subject to the same process with a
public hearing before the Planning Commission.
32
Page 33
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 3
Previous Applications
The existing structure was constructed in the 1960s and was in service as the Dover Post Office
until the new post office location opened on Bank Lane in 2021. The property owner is the City of
Dover. After the Post Office closed, the City initiated an RFP process to solicit proposals for
redevelopment of the site. The equitable owner, Old Post, LLC was selected through this process.
Application Z-24-01, approved by City Council on February 12, 2024, rezoned the property from
IO (Institutional and Office Zone) to C-2 (Central Commercial Zone) with it remaining in the H
(Historic District Zone) and SWPOZ (Source Water Protection Overlay Zone).
In February 2025, the Historic District Commission recommended approval of the Architectural
Review Certificate for the proposed building renovations/reconstruction in HI-25-01. In March
2025, the Planning Commission conditionally approved the Site Plan S-25-07, inclusive of the
Architectural Review Certificate. This submission seeks to revise the Site Plan and Architectural
Review Certificate previously approved.
Preliminary Land Use Services Review (PLUS):
The PLUS Review is required by a City of Dover Memorandum of Understanding (MOU) for
certain types of projects. Due to its Downtown Dover Redevelopment Target Area, this project was
not required to complete PLUS Review process.
II. PROJECT DESCRIPTION
PROJECT PROPOSAL Revised (documents of November 2025 and Updated Set of
12/3/2025)
The REVISED application proposes the demolition of the rear portion of the existing structure and
replacement of that structure with a new addition, while maintaining and rehabilitating the front of
the present structure (4,560 SF). Capital City 2030: Transforming Downtown Dover Master Plan
identified the Old Dover Post Office as a Project Site. The Master Plan proposes that a new mixed-
use building could reactivate the site. This project is also identified as a Key Project within the
City’s Downtown Development District (Renewal) application of 2024.
The proposed development proposes a 4,560-SF restaurant space in the former Post Office front
area. The rear warehouse portion of the building will be demolished and replaced with a new four-
story structure comprised of 42 apartment (multifamily) units.
The Applicant’s REVISED submission includes a Site Plan set and Architectural Graphics set with
building elevations and 3-D views. The elements of the project are as follows:
1. Partial Demolition: The rear flat-roofed warehouse portion of the building is to be
demolished as this is where the four-story building addition is proposed. The front gable
roofed portion of the existing building is to remain in its same footprint.
2. Existing Building Renovations: New Azek trimwork is proposed to match the existing. It is
unclear from the submission if the design includes dentil cornices. New replacement
shutters, windows, and front door are noted to match the existing. The Revised Plan
involves the demolition of the roof areas and paired chimneys of the one-story wings to add
an additional floor to make them two story. The Revised Plan shows a new gable roof in
asphalt shingles will be constructed over the original building front wings with two
33
Page 34
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 4
dormers added over each wing. The Revised Plan shows that each wing of the front portion
of the building will include paired sets of glass doors with Azek Trim.
3. Building Addition: The Revised proposed four-story addition will be located directly
behind the front massing portion of building (main block). The proposed addition will be
43 feet 6 inches tall. The existing building is 33 feet 2 inches tall at the peak of its roof. The
addition will feature a brick veneer and brick engaged pilasters with horizontal banding in
brick detailing along all sides on floors two, three, and four, and floor one using EFIS in a
white brick finish. The Revised roof features a wide cornice at the roofline. The east and
west elevations include large glass windows (with door) for the apartments. Glass and
black aluminum railings (black steel cable railing) will be used to enclose balconies. The
Revised addition eliminates some exterior balconies and adds architectural relief by
recessing balconies partially into the building.
4. Parking Lot: A parking lot will be developed along the west side and north side of the
building with access from Innovation Way. This new parking lot will not have vehicular
access from the large municipal parking lot at the Dover Public Library. The applicant is
also working with the City in regard to the adjacent row of parking east of the Library. The
parking lot is fenced with a black aluminum fence and appears to have narrow bands of
grass at the perimeter on the west and north.
5. Sidewalks and Site Amenities: The proposal maintains connected sidewalks along
Innovation Way and Loockerman Plaza. There are also sidewalks adjacent to the parking
lot leading to the building and from the street frontage sidewalks. At some points, steps are
necessary to ascend to the building. A ramp system is noted on the Site Plan for the north
building elevation but not depicted in the renderings. A fenced Zen garden is proposed to
abut the building addition along Innovation Way, but its details are unclear for this slightly
sloped area. The Updated Plan shows a curving pathway in the East Zen garden with
benches and a Yoga space.
6. Tree Planting and Landscaping: The February 2025 submitted project plan identified five
existing trees on the current site. The Revised Landscape Plan identifies three trees to be
removed and 19 trees to be planted. Please clarify on the site plan how many existing trees
will be removed and whether any will be retained.
See the attached Revised Plan submission and associated graphics and drawings for detailed
information on building dimensions, locations, and material choices.
Surrounding Land Uses
This subject property location at the northwest corner of Innovation Way and Loockerman Plaza is
within the Downtown Development District. Properties immediately adjacent to the subject project
location are zoned IO (Institutional and Office). The surrounding properties are also within the H
(Historic Zone). The Dover Public Library and Dover City Hall are located west of the subject site.
State offices are to the north and south of the subject site and a mixed-use building with offices
and a restaurant are located to the east across Innovation Way.
34
Page 35
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 5
III. ZONING REVIEW
C-2 (Central Commercial Zone)
The subject property is zoned C-2 (Central Commercial Zone); this zoning designation will remain
in place. The description of the C-2 (Central Commercial Zone) zoning district is provided in Article
3 §13 of the Zoning Ordinance and provisions identify the allowable (permitted) uses and the related
bulk standards for the C-2 zone. The C-2 zone allows for “retail stores, apartments and multi-family
dwellings provided that now dwelling units shall be permitted on the first floor on the street frontage
of Loockerman Street; uses accessory to the residential units such as lobby and amenity spaces are
permitted on the first floor; live-work units; parking lots and parking structures” as principal uses.
The subject property has frontage on two streets, Loockerman Plaza and Innovation Way. The C-2
zone requires a zero minimum front yard. No side yard is required; however, if one is provided then
it shall be a 5-foot side yard minimum. A 20-foot rear yard setback is required above ground floor
and 5-foot is required at ground floor. The maximum building height for this district is 10 stories or
125 feet.
Code Compliance for C-2 Required Provided
Front yard (ft.) 0 0 feet
Side yard (ft.) None required, but 5 feet 5 feet
minimum if provided
Rear yard (ft.) 20 feet above ground floor; at 20 feet
ground floor 5 feet
Off-street parking 0 62 new spaces (3 ADA), 29
shared with City of Dover (2
ADA)
Building height 10 stories/125 feet maximum 4 stories/45 feet
Lot Coverage Not specified 80.11%
Floor Area Ratio 5.0 0.86
The building’s height and number of stories comply with the C-2 zone. The total lot coverage for
the project is listed as 80.11%. The C-2 zone does not specify a maximum lot coverage
requirement. The maximum floor area ratio (FAR) permitted is 5.0. The plan does not indicate the
FAR, but based upon the building area presented for the existing building and proposed addition,
the FAR is 0.86.
The C-2 zoning district also includes design standards provisions. See the code excerpt below:
Article 3 Section 13
13.5 Design standards. The following standards shall apply to the site and building development in
the central commercial zone (C-2):
35
Page 36
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 6
13.51 Façade articulation. Building facades should incorporate design elements to provide a base,
middle, and top of the building to reinforce the pedestrian scale at the street level.
13.52 Height. For buildings greater than four stories in height, then the upper floors above the
fourth story shall step back six feet for fifty percent of the width of the primary facade. For buildings
greater than six stories, then the upper floors above the sixth floor shall step back an additional six
feet on the primary façade. These step back areas may begin at a lower height than these
minimums as part of the building design in order to be compatible with the character of the area.
13.53 Step back areas. The step back areas should be open to the sky and can be open air
balcony spaces or other design architectural features that are not enclosed spaces.
13.54 Off-street parking. Off-street parking lots shall not be permitted to be situated between the
street line and the primary facade of the principal building. Consideration should be given to
locating parking to the side or rear of the building.
13.55 Screening. Any off-street parking lots provided shall be screened from the street line by
buildings, landscaping, or other means. Off-street parking lots shall be screened from adjacent
residential zones and residential uses. This screening provision does not apply to adjacent alleys.
The plan as presented complies with these design standards. Landscaping must be shown along
Innovation Way to screen the parking area from this street. A Revision presented to the Historic
District Commission proposed a design alternative to create an island between the parking lot
entrances where landscape could be implemented.
The property is partially within the SWPOZ (Source Water Protection Overlay Zone) Tier 3
Excellent Recharge Area, but it is exempt from the requirements of this zone due to its location
within the Downtown Redevelopment Target Area.
H (Historic District Zone)
The entire project site is located in the H (Historic District Zone) and subject to the provisions of
the Zoning Ordinance, Article 3 §21 and referenced sections. The H (Historic District Zone) is
described in Zoning Ordinance, Article 3 Section 21 with the following purpose statement:
Article 3, Section 21. - Historic district (H).
21.1 Purpose. The purpose of this historic district regulation is to preserve and enhance that
unique character and value of the old portion of Dover as an area of special charm and interest. It
is particularly intended that the regulations prevent, in the historic dis trict, any change of
conditions that would be deemed to be a disfigurement or degradation of the present unique
visual and architectural qualities of the district.
IV. ARCHITECTURAL REVIEW CERTIFICATION
Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review
Certification and related building height, bulk, and setback standards. This process begins with
Review by the Historic District Commission.
Review of DESIGN STANDARDS AND GUIDELINES
Location within the H (Historic District Zone) requires proposals for demolition, new construction,
additions, and certain renovation or rehabilitation activities to receive an Architectural Review
Certificate. As stated in the Design Standards and Guidelines for the City of Dover Historic
District Zone, an Architectural Review Certificate will be granted “if it is found that the
architectural style, general design, height, bulk and setbacks, arrangement location and materials
36
Page 37
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 7
affecting the exterior appearance are generally in harmony with neighboring structures and
complementary to the traditional architectural standards of the historic district.” Zoning
Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and
related building height, bulk, and setback standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter
4: New Construction, Additions, Demolition and Relocation. The Design Standards and
Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria
and development guidelines. The guidelines specify a series of individual considerations for new
construction to be considered in the review by the Historic District Commission (and Planning
Commission) of the project for Architectural Review Certification.
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, floor area
ratio, height, etc.
HISTORIC DISTRICT COMMISSION – REVISED RECOMMENDATION
For The Old Post project, the Historic District Commission considered the revised application for
HI-25-01 on November 20, 2025, for an Architectural Review Certificate for development of The
Old Post and associated Site Improvements. The Historic District Commission considered the
proposal for construction and has provided a recommendation to the Planning Commission
in regard to the Architectural Review Certification for the project. The specific
recommendation involved consideration of the Design Standards and Guidelines. See
attached Recommendation Report from the Historic District Commission.
The Planning Commission should act upon the Architectural Review Certification as part of any
motion to approve this project, or as a separate motion if necessary. In taking this action, the
Planning Commission is to consider the standards and guidelines found in Chapter 4 of the Design
Standards and Guidelines for the City of Dover Historic District Zone and other referenced
sections.
V. PARKING SUMMARY
The C-2 (Central Commercial Zone) does not include a minimum parking requirement.
Additionally, Article 6 §3 of the Zoning Ordinance states:
For new construction within the downtown redevelopment target area, as described in appendix
C of the Dover Code of Ordinances, there is no minimum off-street parking requirement based
on use. To utilize this exception, a parking strategy statement must be submitted for review as
part of the site development plan approval required by appendix B, zoning, article 10, section 2.
The applicant has submitted a Parking Strategy Statement for consideration with the Site Plan. The
parking strategy indicates that 121 parking spaces are recommended. The Site Plan and parking
strategy statement show 62 spaces on-site and proposes using 29 spaces on the adjacent parcel
owned by the City of Dover under an easement. Based on the parking strategy statement provided
the parking to be provided for the proposed site is as follows: 62 onsite parking spaces will be
provided for use of the tenants of the apartment units; 29 parking spaces will be provided on the
adjacent parcel directly to the west (Dover Library) through an existing easement with the City of
Dover to support the apartments and proposed restaurant; and. an additional 180 public parking
spaces are available to serve the patrons of the proposed restaurant use along Innovation Way,
37
Page 38
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 8
Loockerman Plaza, and the Dover Library parking lot. A copy of the easement document is on file
in the Planning Office.
VI. SITE CONSIDERATIONS
Lighting
The site plan and architectural package do not detail lighting for the site. Article 5, Section 7.1 details
that lighting of commercial uses shall provide no less than 1½ footcandles at grade. Light shall be
deflected away from adjacent residential areas and shall not be distracting to traffic on adjacent roads.
Dumpsters
Dumpster requirements are specified in Article 5, Section 6, with minimum number required
specified below.
Use Dumpsters Required
Apartment complex or apartment building Two required for the first 48 apartments; one required for each additional
with over 10 units 24 apartments or fraction thereof
Nonresidential uses Two required per property
Based on this, two dumpsters are required. Two dumpsters are provided at the northwest corner of
the parking lot to the rear of the building.
Sidewalks
There are existing sidewalks along the frontage of Loockerman Plaza and Innovation Way along
the perimeter of the property.
VII. TREE PLANTING AND LANDSCAPE PLAN
Tree Planting Requirements
The Zoning Ordinance further requires a tree planting at a rate of one tree per 3,000 SF of non-
woodland development area. Based on the total non-woodland area for the submitted plan of 1.267
acres, or 55,190.52 SF, 19 trees are required to be planted. Three trees exist along the frontage of
the property, and the Landscape Plan shows removal of these trees and planting of 19 trees on the
site.
VIII. OPEN SPACE and RECREATION PLAN
The proposed development qualifies for an exemption under Article 5, §10.515 Residential
developments located within the Downtown Redevelopment Target Area as defined in Appendix
C. Under this provision, the applicant must provide 75 square feet of active recreation per
dwelling unit with a minimum of 2,500 square feet provided on site. The applicant proposes to
provide two Zen Gardens and an indoor Gym on the proposed site. The Zen Garden on the west
side of the building is 1,646 SF and provides patios, benches, shade trees, and shrubbery for
tenants of the apartments. The Zen Garden to the east of the proposed apartments is 2,424 SF and
will provide patios, shade trees, benches, a walking path, and a yoga station as amenities for the
apartment tenants. A 506 SF indoor gym is proposed on the second floor of the apartment building
for tenant use. There were some questions about accessibility to the gym as the previous design
called for a half flight of stairs to the gym which are not ADA accessible; however, the
architectural plans have been revised to provide an ADA accessible ramp in place of the half flight
of stairs.
38
Page 39
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 9
The Revised Open Space and Recreation Plan is subject to review by the Parks, Recreation and
Community Enhancement Committee and will be presented to the Committee on December 9,
2025. The Committee will make a recommendation to the Planning Commission.
IX. CITY AND STATE CODE REQUIREMENTS:
The subject Revised proposal has been reviewed for code compliance, plan conformity, and
completeness in accordance with the agency’s authority and area of expertise. The following items
have been identified as elements which need to be addressed by the applicant:
1) Cover Sheet, C-001:
a) Data Column:
i) Update item 4, the Existing and Proposed Zoning, to include all zoning classifications:
C2/H/SWPOZ
ii) Update item 6, Floodplain, to indicate that the property is not impacted by the 100 Year
Floodplain
iii) Updated item 7, Groundwater Recharge, to reflect that a portion of the property is in the
Excellent Groundwater Recharge area.
iv) Update item 11 to add a Floor Area Ratio calculation for the site to the data column.
v) Update the data column to specify total gross floor area calculation.
vi) Update items 12 and 13 to reflect areas in square feet in addition to acres.
b) Remove the Kent County Engineer signature block.
2) Bicycle parking shall be provided for parking spaces at a rate of one bicycle parking space for
every 20 parking spaces or a fraction thereof. Please include bicycle parking in the parking
strategy statement and clarify how many spots will be accommodated via the indoor storage and
bicycle rack in the SW corner of the site.
3) For building with multi-family units, the Zoning Ordinance, Article 6 §5.3 requires that the
parking spaces be at least 15 feet from the wall of the building and three feet from side and rear
property lines. Provide dimensions to confirm compliance. It appears that the row which includes
the handicapped parking does not comply with the distancing requirement from the building
wall. The Applicant is seeking a reduction of this distance under the provisions of the
Architectural Review Certification, but this must be further discussed with the Fire Marshal’s
Office.
4) The construction of the site entrances and street improvements must comply with the
requirements of DelDOT and the City of Dover Public Works Department based on street
maintenance responsibilities.
a) Clarify materials (concrete and brick) used and placement design for the sidewalk and
entrance construction.
b) Identify any changes to on-street parking spaces along the project frontages.
5) With the updated details provided about the Active Recreation amenities for the site, staff
recommends approval of the Active Recreation Plan subject to the following clarifications or
conditions for the details of the recreational amenities:
a. Identify surface of Yoga Area and ensure connection to accessible pathway.
b. Identify surface materials of the Walking Pathway and its width.
c. Ensure placement of the benches are accessible from the walking pathway and allow for
someone to move off the pathway to rest. 39
Page 40
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 10
d. Ensure the placement of light posts does not impede any sidewalk. Check light post
positions along the parking area.
e. Ensure that the gym space is accessible from the rear addition and through any doors.
Due to the difference in floor-to-floor heights a ramp system or other format will be
necessary rather than just steps. This will need to comply with applicable Building Codes
and Fire Codes.
6) The Historic District Commission recommended conditional approval of the Revised
Architectural Review Certificate for the construction of the project. See attached Revised
Recommendation Report for recommended conditions.
7) Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by
the Kent Conservation District must reflect the Site Plan layout and design conditionally
approved by the Planning Commission and be in compliance with the Zoning Ordinance and
technical review requirements of other agencies.
8) Please provide an Active Recreation Plan sheet that provides the area calculations and details for
the Zen gardens and the interior gym space.
9) The Final Plan set must include notes documenting any action taken by the Planning
Commission on the requested waivers and must list any additional conditions of approval.
X. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the public
in general, and the residents of the immediate neighborhood in particular shall be taken into
consideration. These safeguards may to the maximum extent possible further the expressed intent
of the Zoning Ordinance and the accomplishment of several objectives in particular listed in
subsections 2.21 to 2.28.
1) Revised Architectural Review Certification Staff recommends conditional approval of the
Architectural Review Certificate for the construction of the Dover Mobility Center Garage
finding that the building to be of a design compatible with the intent of the Design Standards
and Guidelines for the City of Dover Historic District Zone.
a) Staff provided a series of recommendations and comments regarding the Architectural
Review Certification and review of the project for compliance with the Design Standards
and Guidelines. These items were previously identified during the review of the project by
the Historic District Commission. See HDC Recommendation Report.
2) Staff recommends the following pertaining to the site design elements of the project:
a) The C-2 zoning district requires that parking lots be screened from the street. This Revised
Plan appears to have proposed an island with plantings to screen the parking lot
improvements from Innovation Way by adding curbing and grass areas.
b) Evaluate the parking lot space locations as some spaces are not full sized or would be
impacted by the Dumpster Enclosure gates. Also, confirm that the northern drive aisle
meets the width requirement for two-way travel. Remove unnecessary pavement to create 40
Page 41
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 11
green islands. Add parking bumpers to ensure vehicles do not impact fence.
c) The sidewalk system on the street frontage should continue and include barrier free access,
crosswalk striping, etc. at the points of intersection with the entrance and exit drive aisles.
d) Any proposed landscaping or tree planting locations, and lighting fixture locations should
be depicted on the plan and be consistent with the character of these elements as they exist
within the Capitol Square Context area.
3) Electric Vehicle Charging Stations: Identify if the project is planning for the installation of
Electric Vehicle Charging Stations in the Parking Lot. Currently, the Zoning Ordinance does
not require them, but many other jurisdictions have implemented such requirements. Electric
Vehicle Charging Stations formats include EV-Capable, EV-Ready, and EV-Installed.
XI. ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the Revised Architectural Review Certification as
part of any motion to approve this project, or as a separate motion if necessary.
2) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers are
at the discretion of the Planning Commission. The Commission may approve or deny waiver
requests.
3) In the event that major changes and revisions to the Revised Site Plan occur in the finalization of
the Plan contact the Department of Planning and Inspections. Examples include relocation of
site components like paving and increases in footprint. These changes may require resubmittal
for review by the Development Advisory Committee, Historic District Commission, Planning
Commission, or other agencies and commissions making recommendations in regard to the Plan.
4) Following Planning Commission approval of the Revised Site Plan, the Plan must be revised to
meet all conditions of approval from the Development Advisory Committee or as otherwise
noted. A Check Print must be submitted for review by Planning Office Staff and the other
commenting agencies. Upon determination that the Plan is complete and all agency approvals
have been received, copies of the Plan may be submitted for final endorsement (Final Plan
Approval).
5) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
6) The applicant/developer shall be aware that prior to any ground disturbing activities on the site
the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits
are required.
7) Construction and demolition will have an effect on the adjacent property owners, employees of
adjacent buildings, and nearby sidewalks and streets. Any work requiring the closing or
rerouting of potential customers, employees, or visitors to the adjacent properties (including
those who park in the existing parking lot), and streets or alleys should be coordinated as to
offer the least amount of inconvenience. Careful consideration will need to be given to the
access to other properties which requires the crossing of these properties or travel over the
public alley.
41
Page 42
Item 3.
S-25-07 REVISED The Old Post
DAC Report of December 2, 2025
Page 12
8) For building new construction, the requirements of the building code and the fire code must be
complied with. Consult with the Chief Building Inspector and City of Dover Fire Marshal for
these requirements. The resolution of these items may impact the site design including such
items as building dimensions and height, building openings, and fire protection needs, etc.
9) The applicant shall be aware that Revised Site Plan approval does not represent a Building
Permit and associated construction activity permits. A separate application process is required
for issuance of a Building Permit from the City of Dover. Building Permits will be required for
each building.
10) The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it
convey permission to place any sign on the premises. Any proposed site or building
identification sign may require a Sign Permit from the City of Dover prior to placement of any
such sign in accordance with Zoning Ordinance Article 5 §4.
If you have any questions or need to discuss any of the above comments, please call the above
contact person and the Planning Office as soon as possible.
42
Page 43
Item 3.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOVEMBER 26, 2025
APPLICATION: REVISED The Old Post at 55 Loockerman Plaza
FILE #: S-25-07
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT EMAIL: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate
capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall
provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling
containers.
2. Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
3. Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
3. Please coordinate with the City of Dover to obtain as-built information from a recent stormwater project. The installed
infrastructure surrounds the property.
STREETS
1. Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
2. The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was
administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at
driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the
curb. Sidewalk and curb shall be installed for the width of the project scope.
3. It shall be unlawful for any person to alter the curb of any street so as to create a curb depression for the purpose of permitting
vehicles to enter onto or exit from the city streets, without a permit issued by the city manager.
43
Page 44
Item 3.
REVISED The Old Post at 55 Loockerman Plaza
File #: S-25-07
November 26, 2025
Page 2 of 4
4. Please provide an entrance plan for the work proposed on Innovation Way. At a minimum, this plan shall provide the radius of
the entrance, grade elevations, and turning diagrams to provide evidence that the improvements will not be detrimental to
traffic or drainage.
5. Please add the following notes to the plans:
a. Standard City of Dover sidewalk, as per Chapter 98, Article IV of the Dover Code of Ordinances, shall be required to be
installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the
standards of Chapter 98, Article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free
pedestrian movement and site access.
b. In accordance with Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at
the ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously
laid by order of the city council, until it is taken up and re-laid.
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010.
Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance
with the City of Dover Department of Water & Wastewater specifications and requirements.
c. The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736-
7025 before the start of construction. A representative from the City of Dover Department of Water & Wastewater must
observe and approve all City-owned water and sanitary sewer interconnections and testing. All water taps must be
performed by a City of Dover-approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity
to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by
the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions
requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful
connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised
that, effective May 1, 2022, water mains can now be constructed using DR 18 PVC.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of
the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must be submitted prior to
approval so the meter size can be placed on the final site plan. The proposed water meters must be installed in a pit per City of
Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
5. The domestic service, fire main connection, and valves must be clearly shown for each building. A valve must be installed at the
tee to isolate the combined fire and domestic water service to the building from the water loop. Typically, this valve is installed
at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be
tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should
be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of
the building. A blow-up detail of this layout is recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. There shall only
be one (1) water service per building. The Department of Water & Wastewater will test and inspect all fire mains to a blind flange
located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and
dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally
through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained
through the floor to the ninety-degree (90°) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through
44
Page 45
Item 3.
REVISED The Old Post at 55 Loockerman Plaza
File #: S-25-07
November 26, 2025
Page 3 of 4
walls and slabs must be Class 52 cement-lined ductile iron pipe. Confirm particulars to meet this requirement with the mechanical
designer.
7. Water services shall be either type K copper or SDR-9. 1. All non-metallic water lines (mains and services) shall be installed with
a tracer wire and identification tape. The wire shall be a minimum of twelve (12) gauge blue-coated solid copper wire, wrapped
around the pipe, and extending up into all valve and curb boxes. The identification tape shall be six inches (6”) wide, laid one foot
(1’) above the pipe, with the following text: “Caution: Buried Water Line Below”. 3M marker balls, model 1423-XR, or approved
equal, shall be installed at every service line connection to the water main and all bends on the service line.
8. On October 24, 2022, the City of Dover Council approved the new Cross Connection Control Program. This program requires
certain backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific
description of the activities within this project.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause
to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage,
uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include
condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water,
surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner,
and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the
site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and
invert elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-
way, and at all bends. Any cleanout located within a traffic-bearing location shall be installed with a heavy-duty cast iron frame
and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are
met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed, a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance
requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be
provided on the plan.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must
be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
45
Page 46
Item 3.
REVISED The Old Post at 55 Loockerman Plaza
File #: S-25-07
November 26, 2025
Page 4 of 4
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and
providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water, for
review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of
Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until
review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water &
Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
4. Water impact fees will be required to be paid prior to the Certificate of Occupancy for this project. Each apartment unit is equal
to one (1) Equivalent Dwelling Unit (EDU).
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending
and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources,
Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees,
completed forms, and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer, and storm sewer
crossings must be shown on the profiles.
4. Wastewater impact fees will be required to be paid prior to the Certificate of Occupancy for this project. Each apartment unit is
equal to one (1) Equivalent Dwelling Unit (EDU).
GENERAL
1. The applicant is advised that, depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist,
which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
SANITATION / STORMWATER / STREETS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
46
Page 47
Item 3.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOV 26, 2025
APPLICATION: REVISED The Old Post at 55 Loockerman Plaza
FILE #: S-25-07
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Ops Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all existing underground electric, communications and water facilities.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
47
Page 48
Item 3.
Revised The Old Post at 55 Loockerman Plaza
File #: S-25-07
Nov 26, 2025
Page 2 of 2
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates.
Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
48
Page 49
C F
S-25-07 I I
Item 3.
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: November 26, 2025 D S
O H
V A
E L
APPLICATION: Revised The Old Post at 55 Loockerman Plaza
R
FILE #: S-25-07 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is mixed use (restaurant/assembly, mercantile, business, and
residential).
2. Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with NFPA 13,
access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the width
of the door(s) or for 10 feet, whichever is greater.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 75% and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of two or
more stories, measured from the face of the building at grade with a maximum slope of ten percent (10%).
Plantings and utility services (includes condenser units, transformers, etc.) shall be permitted within the
perimeter access, and shall not interfere with emergency services fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building perimeter
shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be located
closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of
two or more stories.
5. Fire lanes shall cover 50% of the proposed building.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the
primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served by a
fire lane even if this exceeds the percentage as required.
49
Page 50
Item 3.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the
closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two stories
in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located closer than 15
feet to the exterior wall.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
Where parking is located between the building and the perimeter access area, parking shall not be located
closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of
two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5.2
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and face of
the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow demarcation line
shall mark the edge(s) of the fire lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be suitable
for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot
intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than eight feet
(8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall face all oncoming
traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire
lane signs and shall conform to the specifications of 7.6.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over any fire lane,
an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be provided and the
portion of the building perimeter which contains overhangs, canopies, balconies, or any other building
features shall not apply towards the fire lane accessibility requirements of Section 4.0, Table 5-1 in this
chapter.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and 14 feet
clear width for one-way traffic. The paved width of access roadway shall be measured from edge of parking
spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge of pavement if there is
no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 5.2)
12. Emergency access to rear building areas compliant with City of Dover Code (Appendix B-Zoning, Article
5- Supplementary Regulations, Section 17);
all four stories and greater buildings require 24ft fire lane at the rear.
All two to three story apartment structures require an 18ft Secondary Fire Lane at the rear.
All townhouses (3-8 units with no fire protection) require a 16ft alley or 18ft secondary fire lane at the rear.
13. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-sac as
outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
14. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in reference
to this process.
50
Page 51
Item 3.
15. Gated Areas: Fire Department access shall be provided to the property through the use of a system or
device approved by the Fire Marshal. The system or device required shall be located in an area accessible to
the fire department and approved by the Fire Marshal. All gates shall be either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The owner or
their representative shall meet with the Fire Marshal prior to submission to agree on the system. A letter of
agreement shall be created and signed by both parties. The letter shall include a detailed description of
both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their representative shall
meet with the Fire Marshal prior to submission to agree on the means to open. A letter of agreement shall
be created and signed by both parties. The letter shall include a detailed description of the manual means
to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not less than
14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be setback from
the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
16. Fire hydrants shall be installed per the requirements of City of Dover Public Utilities
Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention Regulations.
City Ordinance Sec 46-9 (f).
5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall be
located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All hydrant spacing
shall be located along available roads or at the direction of the State Fire Marshal. This measurement shall
be calculated by way of accessible thoroughfare(s) from the building to be protected to the hydrant and
may not necessarily be a radius. 5.1.3 Additional hydrants shall be provided when the State Fire Marshal
deems it necessary based on the configuration of the site, building(s), exposures, construction, occupancy,
and/or specific hazard(s).
Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached dwellings,
other residential, rowhouses and townhouses, assembly, health care, business, education, storage,
industrial, mercantile, and mini storage. (702, Chapter 6)
NFPA 1
18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and two-
family dwellings in accordance with both of the following: 1. the maximum distance to a fire hydrant from
the closest point on the building shall not exceed 600 feet 2. the maximum distance between fire hydrants
shall not exceed 800 feet.
18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided for
buildings other than detached one- and two-family dwellings in accordance with both of the following 1.
The maximum distance to a fire hydrant from the closet point on the building shall not exceed 400 feet 2.
The maximum distance between fire hydrants shall not exceed 500 feet
17. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and as
illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define specific
areas, where fire hydrants are located along a curb line with permitted parking, the area between the fire
hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words
"NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and extend
for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked vehicles
they shall be treated as follows: fire hydrants shall be protected in all directions for a distance of seven feet
(7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards filled with concrete and
marked yellow shall be installed at the outermost corners of the fire hydrant demarcation area. The
minimum height of the bollard shall be 36 inches above the finished grade of the adjacent surface, and the
steamer connection of all fire hydrants shall be positioned so as to be facing the edge of the street, or traffic
lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
51
Page 52
Item 3.
The owner is responsible if the hydrant is private.
18. Hydrant barrels shall be provided with reflective material, such as paint, durable for highway/roadway
markings or a reflective tape of a minimum of 2” in width around the barrel under the top flange, hydrant
bonnets shall be color coded based on the following criteria: class AA 1500 GPM - painted light blue, class
A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM - painted orange, class C 250 - 499 GPM -
painted red, class D under 250 GPM - painted black.
(2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
19. Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and-
hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
20. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an occupancy
determined to be a place of assembly by the fire marshal and is capable of receiving an occupant load of 75
persons or greater, shall be required to install a fire alarm in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to be a
place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the assessed
value of the building and is capable of receiving an occupant load 75 persons or greater or is being enlarged
to receive an occupant load of 75 persons or greater, shall be required to install a complete fire alarm
system in accordance with NFPA codes governing the installation of fire alarms and the National Electrical
Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by occupants of
a structure, they shall have a sound level at least 15 decibels (dB) above the average ambient sound level or
five decibels (dB) above the maximum sound level having a duration of at least 60 seconds, whichever is
greater, measured five feet (1.5m) above the floor in the area required to be served by the system using the
A-weighted scale dBA. In the event the stated requirement cannot be met a shunt trip relay/switches shall
be the approved method of meeting the intent of this section of the Code.
(City Code of Ordinances 46-171)
21. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are
modified by more than 50% after the effective date of these Regulations. The 50% figure shall be calculated
utilizing the gross square footage of the building, structure, marine vessel, premises and conditions as to
arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval for a building
rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage of a non-sprinklered
building, may not have another such project for the same building submitted for review and approval any sooner than
three (3) years after the date of the final inspection unless sprinkler projection is provided throughout the entire
building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing, processing,
display or sale of combustible goods, wares, merchandise, products, or materials when more than two (2) stories or
25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding two (2)
stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings storage
areas except individual unit closets that are located within individual residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as adopted
and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under the Life Safety Code,
NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler Systems, NFPA 13, as adopted and/or
modified by these Regulations.
52
Page 53
Item 3.
All buildings used as dormitories, in whole or in part, to house students at a public or private school or public
or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such dormitories regardless if new or
existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted edition of
NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant load
greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an occupant
load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where alcohol will
be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant load
greater than 100 persons and where alcohol will be served for consumption on the premises.
Any additions or increase in interior size to an existing place of assembly which would create an occupant
load of 100 persons or greater and where alcohol will be served for consumption on the premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in accordance
with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1. Dance Halls 2. Discotheques 3.
Nightclubs 4. Bars 5. Restaurants 6. Assembly occupancies with festival seating
22. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within 50
feet of main entrance. Access to the Fire Department Connection must be clear unobstructed access as
defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that hose
lines can be readily and conveniently attached to without interference from any nearby obstructions as
defined by the fire marshal's office. Fire department connections shall be a five-inch Storz. Fire
department connections shall be within 300 feet of an approved City of Dover Fire Hydrant and within
50 feet of the main entrance of the structure it serves. All fire department connections shall be not less
than three feet nor more than five feet in height above finished grade. The fire marshal shall have the
authority to require more stringent requirements when deemed necessary. (City of Dover Code of
Ordinances 46-162)
23. Parking and/or obstructions shall be prohibited in front of fire department connections for a distance
measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
24. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would come
off the fire equipment.
25. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate section of
this regulation and as illustrated by the appropriate figures of this regulation. All standpipe and sprinkler
connections shall have minimum of four inch (4") solid yellow demarcation lines to define specific areas,
Solid yellow demarcation lines shall be measured from the center line of the connection and extend for a
distance of four feet (4') on both sides, and where parking is allow between the building and the street or
53
Page 54
Item 3.
fire lane the solid yellow demarcation lines shall extend from the end of the sidewalk surface to the street
or fire lane (Markings shall not be required on the sidewalk surface).
All fire department connections (standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads
FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red
scotchlite letters on white scotchlite background. The sign shall be clearly visible from the fire lane or
roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021 Delaware
State Fire Prevention Regulations, 705, Chapter 6, 3)
26. Standpipes shall be provided in all areas and buildings as required in the codes and standards listed in
Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet in
height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and standards
listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall be installed in
accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use as each
floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At the
highest intermediate landing between floor levels in every required exit stairway,
Where intermediate landing is not provided, hose connections shall be permitted to be located at the main
floor landings in exit stairways when approved by the authority having jurisdiction,
Where the local fire department has the capability of providing the required pressure, hydraulically
designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide the
required waterflow rate.
A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021
Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
27. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be protected
from impact damage by impact protection. Natural gas and LP gas meters, regulators, and valves located
inside structures shall have impact protection, except when located in separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The bollard
shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at a minimum
of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in height above the
finish grade elevation. Any deviation of the stated requirements must be approved by the fire marshal
and/or chief building inspector. The above dimensions shall serve as the requirement for installation;
however, the fire marshal and/or chief building inspector shall have the authority to require more stringent
dimensions to fit the needs of devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be of
fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved by the
fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
28. Every house, building or structure used or intended for use as living quarters or as a place for conducting
business, and having any wall facing or abutting any public or private street or alley, shall have displayed
54
Page 55
Item 3.
on that wall, in legible, easily read characters which are of contrasting color to the background, the proper
street number for such house, building, or structure in accordance with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four inches in
height, location, the number shall be placed on the house above or to the left or right of the front entrance,
color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic
numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying
individual apartments with exterior doors, and 12 inches when identifying buildings with apartment
complexes where there are two or more buildings not assigned street addresses. Individual buildings with
street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the
center of the building or on the street end of the building so as to be visible from either the public or
private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic
numerals, all numbers used shall be Arabic numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height,
location generally, numbers shall be placed either in the center of the building or on the street end of the
building so as to be visible from either the public or private street or from the parking lot,
property line or driveway, should the building be located far enough from a public or private road so that the
numbers are not clearly visible from the street, then the street address shall also be posted on the property
at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on each
building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number
affixed to the front of the tenant space and on the outside of the rear door which corresponds with that
tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
29. A lock box (Knox) containing any and all means necessary for fire department access shall be provided at
the following occupancies: any occupancy that contains a fire alarm signaling system that is monitored off-
site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new or
existing building where a fire alarm or sprinkler system is being installed. It shall be the
responsibility of the owner or occupant to keep a set of keys in the secured key box that are current
to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service shall be
exempt from this subsection.
Location. The secured key system shall be located as close to the main entrance as possible. Should the
building design not allow the secured key system to be located by the main entrance, the fire marshal
and fire chief shall come to an agreement as to an alternate location for the key box. A secured key
system, once installed, shall not be obstructed from view or obstructed by any means that would
delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress,
whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical
rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire
detection. Keys to individual residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for
new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing
buildings.
55
Page 56
Item 3.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before the
installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
30. All required means of egress shall have an exit discharge consisting of a non-slip surface and leading to and
terminating at a public way. NFPA 101
31. All new passenger elevators in a building shall be provided with a car sized to accommodate an ambulance
cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where two or more new
passenger elevators are located in a single hoist way and serve all or the same portion of the building, only
one elevator car that provides a car sized to accommodate an ambulance cot 24 inches by 84 inches in its
horizontal position for each hoist way shall be required. Elevator cars required to comply with 15.1 or 15.2
shall be identified by the international symbol for emergency medical services (star of life). The symbol
shall be not less than 3 inches (76 mm) in height and shall be placed inside on both sides of the hoist way
door frame. Firefighter recall keys shall be provided in a manner acceptable to the local fire department.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
32. Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This must be
scheduled in advance with an authorized vendor.
33. Project to be completed per approved Site Plan.
34. Full building and fire plan review is required.
35. Separate building permits/plans submission will be required for each building and/or tenant fit out. If the
permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans and permits
submissions will be required for each “tenant fit out” at which time a Certificate of Occupancy will be
issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the
“shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.
36. Construction or renovations cannot be started until building plans are approved.
37. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems require
a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is approved.
38. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
39. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
No building or structure in any district shall be erected or structurally altered without a building permit
duly issued upon application to the building inspector. No building permit shall be issued unless the
proposed construction or use is in full conformity with all the provisions of this ordinance. Any building
permit issued in violation of the provisions of this ordinance shall be null and void and of no effect,
without the necessity for any proceedings for revocations or nullification thereof, and any work
undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for
penalties).
1.1 No building permit shall be issued for the construction or alteration of any building upon a lot
without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the
planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of such
building is subject to approval by the planning commission, except upon approval of such plans
approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has
been approved by the planning commission.
56
Page 57
Item 3.
1.3 No building permit shall be issued for a building to be used for any conditional use in any zone
where such use is allowed only with approval of the planning commission, unless and until such
approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3)
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Please confirm building is 45 feet (exceeding 50 feet would make it midrise with additional
requirements)
2. Will the on-street parking on Loockerman St and Innovation Way still exist? (This is in reference to
clear access to the entrances, item # 3 and item # 23 listed above)
3. Is the parking at least 15’ from the building as outlined in item # 6 listed above?
4. Emergency rear access (item # 12 listed above) will be on the West side of the building.
5. We would like to add a fire hydrant at the Northwest corner of the building or on Innovation Way at
the rear of the building
6. Please ensure the landscape plan does not interfere with perimeter access
7. Fenced/gated areas please see item# 15 listed above
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
57
Page 58
Item 3.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: The Old Post at 55 Loockerman Plaza
FILE#: S-25-07 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Brian Williams PHONE#: 302-760-2141
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. A pre-submittal meeting is required with DelDOT.
58
Page 59
KENT CONSERVATION DISTRICT
Item 3.
1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER
ADMINISTRATIVE SITE PLAN REVIEW
DECEMBER 2025
APPLICATION: Revised The Old Post at 55 Loockerman Plaza
FILE #: S-25-07
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Cullen Baker
PHONE: (302) 608 - 5370
EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO
BE ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a sediment and stormwater management plan
must be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing,
filling, grading, etc.) taking place. The review fee and a completed application is due at the time of plan
submittal to the District’s office.
2. The following notes must appear on the record plan:
a. The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
b. The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment
control measure, as it deems necessary.
c. A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
ADVISORY COMMENTS TO THE APPLICANT:
1. We will need to verify the limit of disturbance. If the limit of disturbance is over 1 acre, the plan will need
to be submitted as a detailed plan and will require an NOI. We will also need to review which stormwater
management methods that are being proposed to meet the DNREC requirements.
2. If the limit of disturbance is under 1 acre the plans can be submitted as a standard plan and will not require
an NOI. We would also need to run a curve number check to verify whether the proposed construction will
require stormwater management for the site.
3. Please note the Kent Conservation District will not review an application more than three times. If after the
third review the plan is still not found to be approvable, the application will be denied, and a new application
with review fees are to be re-submitted to continue a detailed plan review.
4. A letter of no objection to recordation will be provided upon approval of the Sediment and Stormwater
Management Plan.
59
Page 60
Item 3.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 12/2/2025 Organization
S-25-07 Revised The Old Post at 55 Loockerman Plaza
FILE # S-25-07 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development
Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting
transportation safety and connectivity within the region. They are submitted in accordance with the support given by
the MPO Council on November 6, 2024.
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or
eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be
waived.
City of Dover Planning Commission
Site Development Plan Review
S-25-07 Revised The Old Post at 55 Loockerman Plaza
The site plan includes a parking strategy that proposes shared parking with the properties
adjacent to the Old Post Office. This, if done properly, will help reduce the need for additional
paved surfaces in Dover’s downtown, which should have a positive impact on the surrounding
area. However, note that if residents of the apartments and patrons of the restaurant are walking
between properties, crosswalks will be needed at each of the primary crossing locations,
connecting to the Dover Public Library to the west and any other off-site parking areas.
In addition, in the original site plan, the design for the Innovation Way side of the property
included complete sidewalks, a crosswalk running across the entrance to the parking area, and a
landscape island that would serve as a refuge for pedestrians. The landscape island as depicted in
the original plan would also help define the space given for vehicle movement. These features do
not seem to be included in the revised site plan. As it currently appears, the wide driveway
entrance that lacks crosswalks and landscape islands would be unsafe to pedestrians and would
not support a walkable environment. Therefore, the plan should be adjusted so that it includes
complete pedestrian amenities on Innovation Way.
60
Page 61
Item 3.
Including these measures in the plan would be consistent with the goals laid out in Capital City
2030: Transforming Downtown Dover, the City’s downtown master plan. This plan encourages
incorporating pedestrian improvements to all site development in Dover’s downtown. This will
help the City work towards its goals of improving the pedestrian experience on Loockerman
Street and Loockerman Plaza and creating safe corridors for walking and biking.1 Note that each
of the crosswalks should be accompanied by ADA ramps at each end.
The absence of pedestrian crossings is Dover Kent MPO’s most serious concern with the site
plan. Sidewalks are already present along the property’s frontage of Loockerman Plaza. The
Downtown Dover Pathways Plan, completed in 2024, proposes several pedestrian improvements
to Loockerman Plaza, including the filling of sidewalk gaps and the addition of a midblock
crossing.2 Although the frontage of this property is not addressed in the study’s short-term
recommendations, the applicant should ensure that any new development does not impede
pedestrian safety and connectivity.
Accessible parking spaces are included in the plan, close to the main building. An ADA ramp is
also depicted, serving as an access point for users of the accessible parking spaces. ADA ramps
should be included at any additional pedestrian access points.
Finally, while bicycle storage will be available for residents inside the building, the applicant
will still need to meet the City of Dover’s requirements for bicycle parking on the site. This
would best be met by including bike racks near the front of the building for easy access by
patrons. These spaces should be included at a rate of one (1) bicycle parking space for every
twenty (20) vehicle parking spaces. (See Dover Code – Appendix B, Article 6, Section 3.10.)3 If
more information on various types of bike racks is needed, please contact Dover Kent MPO.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
1
Capital City 2030: Transforming Downtown Dover. Downtown Dover Partnership (DDP) (2023).
https://www.downtowndoverpartnership.com/ddp/downtown-dover-strategic-master-plan/.
2
Downtown Dover Pathways Plan. Dover/Kent County MPO (2024).
https://doverkentmpo.delaware.gov/files/2024/08/Downtown-Dover-Pathways-Final-Report-2024-07-
11.pdf#page=65.
3
Dover Code: Appendix B, Article 6, Section 3.10. City of Dover.
https://library.municode.com/de/dover/codes/code_of_ordinances?nodeId=PTIICOOR_APXBZO_ART6OREPAD
RLOFA_S3REOREPASP.
61
Page 62
Item 3.
City of Dover
ARCHITECTURAL REVIEW REPORT for REVISED PLAN
Recommendation from the Dover Historic District Commission Meeting of November 20, 2025
And Staff Review Report
Previous Recommendation from the Dover Historic District Commission on February 20, 2025
Application: The Old Post at 55 Loockerman Plaza, HI-25-01 REVISED
Previous Owner: City of Dover
Current Owner: Old Post, LLC
Location: Northwest corner of Loockerman Plaza and Innovation Way in Dover, DE
Addresses: 55 Loockerman Plaza
Tax Parcels: ED-05-077.05-04-53.00-000
Size: 1.267 acres +/-
Present Uses: Vacant Building – Former Dover Post Office
Proposed Use: Mixed-Use Commercial and Multi-family Housing (Apartments) and
associated parking
Present Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
SWPOZ (Source Water Protection Overlay Zone) – portion of site
For Consideration: Revised Architectural Review Certification
This Report for Revised HI-25-01 The Old Post was updated upon submission of a Revised
Architectural package and Site Plan. The Planning Staff deemed the revision substantial enough to
warrant the Application to go back through the formal Architectural Review Certification process
with the Historic District Commission and Planning Commission. Application HI-25-01 was
initially considered by the Historic District Commission on February 20, 2025, and then considered
by the Planning Commission on March 17, 2025, as Site Plan S-25-07 The Old Post.
ACTION OF THE HISTORIC DISTRICT COMMISSION (on Revised Submission):
The application was considered at the November 20, 2025 Meeting of the Historic District
Commission. The following members were present at the November Meeting: Chairman Eric
Czerwinski, Vice-Chair Mrs. Ellen Richardson, Mrs. Ann Horsey, and Ms. Kathleen Baker. The
application was represented by Sal Leone and Frank DiMondi for The Old Post LLC; Freddy
Badda, Project Architect; and Chad Warren, Project Engineer from Davis, Bowen & Friedel.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
62
Page 63
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 2 of 13
Public testimony was received during the Public Hearing from Zach Prebula of the Kent Economic
Partnership.
Action Taken by Historic District Commission:
The motion to recommend approval passed 4-0 of the members present for this application at the
November 20, 2025 Meeting. The Historic District Commission recommends approval of the
Revised Architectural Review Certificate for Application HI-25-01 Revised The Old Post at 55
Loockerman Plaza based on the applicant’s presentation and plans with reference to the Staff
notes and amendments (Staff Recommendation Report – Section VI) and with information
from the applicant’s updates to the Building Elevations and Site Plan set received of
11/20/2025.
During the Meeting, the Historic District Commission heard the applicants’ presentation on The
Old Post Revised Project and including their response to the series of Staff Comments and
Recommendations. They presented information on the Revisions for the development site and
building; building architectural features and materials; the brick sample of Glen Gary (Rose Red
Ranger); and other site items. Questions focused on the tree plantings and existing trees, building
elevation detailing and materials, planned uses in the building and management thereof, parking
space locations, and site features. The Meeting Minutes of the Historic District Commission are
still being prepared; the Meeting recording will be posted on the City’s website.
Note: This Review Report was initially prepared by Staff of the Rossi Group (under a
Planning Services contract with the City of Dover). The Report was completed with
additional review and editing by the City’s Planning Office.
I. PROJECT DESCRIPTION:
The Historic District Commission will act to make a recommendation regarding an Architectural
Review Certificate for a Revised Site Development Plan Application for the proposed building
renovation and expansion for a mixed-use commercial and multi-family (apartment) development
in Downtown Dover, to be located at 55 Loockerman Plaza, also known as The Old Post. The
development proposal is for the 1.267-acre site. The project involves the demolition of the rear
warehouse portion of the existing building and adaptive re-use of the front 4,560 SF portion (revised
to 4,479 SF) of the building for commercial retail and business space. In this Revision, increases in
apartment unit count from 36 to 42 units and architectural changes consisting of a second-floor
addition to the front wings of the building and a four-story 43,092 SF building addition proposed for
forty-two (42) residential apartment units and with parking and other site improvements.
The property is zoned C-2 (Central Commercial Zone) and is subject to H (Historic District Zone).
The south portion of the site along the frontage of Loockerman Plaza is within the SWPOZ (Source
Water Protection Overlay Zone) Tier 3 Excellent Recharge Area. Because the property is within the
Downtown Redevelopment Target Area, it is exempt from the requirements of the SWPOZ.
The property is located on the north side of Loockerman Plaza and adjacent to Innovation Way. The
owner of record is The Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05-
077.05-04-53.00-000. Council District 4.
63
Page 64
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 3 of 13
The design revisions for The Old Post are presented and focus changes to the building height and
scale; adding an additional story on the front wings; adding an additional story, from three stories to
four stories on the rear addition; and increasing the number of apartment units from 36 to 42, as well
as refinements to the architectural character and material utilization. These are more fully described
in the Applicant’s Revised submission.
Surrounding Land Uses
The location of the subject property at the corner of Loockerman Plaza and Innovation Way is
within the Downtown Development District (and Downtown Redevelopment Target Area). As
previously noted, the parcel is zoned C-2 (Central Commercial Zone) and within the Historic
District. Properties immediately adjacent to the subject project location are zoned IO (Institutional
and Office Zone). The Dover Public Library is adjacent to the site to the west. Properties owned
and occupied by the State of Delaware are adjacent to the north (Department of Natural Resources
and Environmental Control - DNREC) and across Loockerman Plaza to the south. The property
across Innovation Way to the east is Treadway Towers, which includes offices and a restaurant.
The surrounding properties are also within the H (Historic Zone) and the SWPOZ (Source Water
Protection Overlay Zone) Tier 3 Excellent Recharge Area.
Previous Applications
The existing structure was constructed in the 1960s and was in service as the Dover Post Office
until the new post office location opened on Bank Lane in 2021. The previous owner of the
property was the City of Dover. After the Post Office closed, the City initiated an RFP process to
solicit proposals for redevelopment of the site. The current owner, Old Post, LLC was selected
through this process. Application Z-24-01, approved by City Council on February 12, 2024,
rezoned the property from IO (Institutional and Office Zone) to C-2 (Central Commercial Zone)
with it remaining in the H (Historic District Zone) and SWPOZ (Source Water Protection Overlay
Zone).
Application HI-25-01 was initially considered by the Historic District Commission on February 20,
2025, and then considered by the Planning Commission on March 17, 2025, as Site Plan S-25-07
The Old Post. A separate copy of the Historic District Commission’s Recommendation Report and
the original presentation submission documents is also being provided for reference.
II. HISTORIC PROPERTY INFORMATION
Review of Historic Maps
Prior to 1926, Loockerman Plaza did not extend beyond South State Street. Loockerman Plaza was
extended between 1926 and 1936. The building was constructed in the 1960’s.
Property Information
The subject property is located within H (Historic District Zone) as established by the City of
Dover. There are four contexts that contribute to the historic character of Dover, including the
Green Historic Context; the Victorian Historic Context; the Loockerman Historic Context; and the
Capitol Square Historic Context. This property is located within the Capitol Square Historic
Context. The first buildings in the Capitol Square Context were built in the 1930’s and 1940’s as
part of the Federal Works Project Administration. The Design Standards and Guidelines for the
64
Page 65
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 4 of 13
City of Dover Historic District Zone describe this context as “neo-Georgian featuring two-story
brick facades with a water table, marble surround at the entrance, keystones over the window
heads, dentilled cornices and hip roofs… greater latitude is recommended in determining what is
appropriate for new construction and additions within this context… a compatible contemporary
building is preferable to a falsely historical one.”
The building located at 55 Loockerman Plaza was constructed in the 1960s. The most prominent
features are the 5-bay Classical pediment with its turned gable, tympanum, and large columns.
Under this projection, the front elevation wall is setback and includes the door entry with
pedimented surround. The building has a gable roof with the rear being a flat roof system. It
features a brick exterior, columns, dentil cornices, and shuttered windows. The building currently
includes second floor offices (approximately 2,160 SF), a basement (approximately 5,865 SF), and
the first floor of approximately 21,151 SF. There is an existing on-site parking lot (unmarked) and
loading dock. The interior has been completely gutted as a result of recent asbestos abatement.
The structure is not listed on the National Register of Historic Places, and this portion of the
Historic District is not part of an Historic District listed on the National Register of Historic Places.
III. PROJECT PROPOSAL
PROJECT PROPOSAL as Revised (Architectural Graphics Package and Site Plan dated
October 2025)
The application proposes the demolition of the rear portion of the existing structure and
replacement of that structure with a new addition, while maintaining and rehabilitating the front of
the present structure (4,560 SF, revised 4,497 SF) including adding a second story to the front
wings of the building. Capital City 2030: Transforming Downtown Dover Master Plan identified
the Old Dover Post Office as a Project Site. The Master Plan proposes that a new commercial
building could reactivate the site. This project is also identified as a Key Project within the City’s
Downtown Development District (Renewal) application of 2024.
The proposed development will repurpose two 2,500-SF retail units and one 2,000-SF unit for a
business (office) space in the former Post Office front area. The front wings of the building will be
expanded with the addition of second floor space The rear warehouse portion of the building will
be demolished and replaced with a new four-story structure comprised of 42 apartment (multi-
family) units.
The Applicant’s original submission included a Narrative Letter, a Site Plan set, and Architectural
Graphics set with building elevations and 3-D views.
The Applicant’s Revised submission of October 17, 2025 includes a Revised Architectural
Graphics Package and Site Plan Sheet.
The elements of the project are as follows with notations on the Revisions:
65
Page 66
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 5 of 13
1. Partial Demolition: The rear flat-roofed warehouse portion of the building is to be
demolished as this is where the four-story building addition is proposed. The front gable
roofed portion of the existing building is to remain in its same footprint.
2. Existing Building Renovations: New Azek trimwork is proposed to match the existing. It is
unclear from the submission if the design includes dentil cornices. New replacement
shutters, windows, and front door are noted to match the existing. The Revised Plan
involves the demolition of the roof areas and paired chimneys of the one-story wings to add
an additional floor to make them two story. The Revised Plan shows a new gable roof in
asphalt shingles will be constructed over the original building front wings with two
dormers added over each wing. The Revised Plan shows that each wing of the front portion
of the building will include paired sets of glass doors with Azek Trim.
3. Building Addition: The Revised proposed four-story addition will be located directly
behind the front massing portion of building (main block). The proposed addition will be
43 feet 6 inches tall. The existing building is 33 feet 2 inches tall at the peak of its roof. The
addition will feature a brick veneer and brick engaged pilasters with horizontal banding in
brick detailing along all sides on floors two, three, and four, and floor one using EFIS in a
white brick finish. The Revised roof features a wide cornice at the roofline. The east and
west elevations include large glass windows (with door) for the apartments. Glass and
black aluminum railings (black steel cable railing) will be used to enclose balconies. The
Revised addition eliminates some exterior balconies and adds architectural relief by
recessing balconies partially into the building.
4. Parking Lot: A parking lot will be developed along the west side and north side of the
building with access from Innovation Way. This new parking lot will not have vehicular
access from the large municipal parking lot at the Dover Public Library. The applicant is
also working with the City in regards to the adjacent row of parking east of the Library.
The parking lot is fenced with a black aluminum fence and appears to have narrow bands
of grass at the perimeter on the west and north.
5. Sidewalks and Site Amenities: The proposal maintains connected sidewalks along
Innovation Way and Loockerman Plaza. There are also sidewalks adjacent to the parking
lot leading to the building and from the street frontage sidewalks. At some points, steps are
necessary to ascend up to the building. A ramp system is noted on the Site Plan for the
north building elevation but not depicted in the renderings. A fenced Zen garden is
proposed to abut the building addition along Innovation Way, but its details are unclear for
this slightly sloped area.
6. Tree Planting and Landscaping: The February 2025 submitted project plan identified five
existing trees on the current site; it is not clear whether they will be removed to create
space for new concrete patio areas or be kept. The October 2025 renderings appear to
include tree plantings and other areas of landscaping. Please identify on the site plan
whether the trees will stay or where five replacement trees will be located.
66
Page 67
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 6 of 13
See the attached Plan submission and associated graphics and drawings for detailed information on
building dimensions, locations, and material choices.
IV. ZONING REVIEW
The entire project site is located in the H (Historic District Zone) and subject to the provisions of
the Zoning Ordinance, Article 3 §21 and referenced sections. Zoning Ordinance, Article 10 §3.2
outlines the review process for Architectural Review Certification and related building height,
bulk, and setback standards.
The property is partially within the SWPOZ (Source Water Protection Overlay Zone) Tier 3
Excellent Recharge Area, but it is exempt from the requirements of this zone due to its location
within the Downtown Redevelopment Target Area.
The subject project area is zoned C-2 (Central Commercial Zone). The C-2 zone allows for “retail
stores, apartments and multi-family dwellings provided that now dwelling units shall be permitted
on the first floor on the street frontage of Loockerman Street; uses accessory to the residential units
such as lobby and amenity spaces are permitted on the first floor; live-work units; parking lots and
parking structures” as principal uses. The subject property has frontage on two streets, Loockerman
Plaza and Innovation Way. The C-2 zone requires a zero minimum front yard. No side yard is
required; however, if one is provided then it shall be a 5-foot side yard minimum. A 20-foot rear
yard setback is required above ground floor and 5-foot is required at ground floor. The maximum
building height for this district is 10 stories or 125 feet.
Code Compliance for C-2 Required Provided
Front Setback 0 feet > 35 feet
Rear Setback 20 feet above ground floor. At > 100 feet
ground floor, 5’required
Side Setback None required, but 5-foot min. Approx. 15 feet
if provided
Building Height 10 stories (125 feet) 4 stories (43 feet 6 inches)
The C-2 zoning district also includes design standards provisions. See the code excerpt below:
Article 3 Section 13
13.5 Design standards. The following standards shall apply to the site and building development
in the central commercial zone (C-2):
13.51 Façade articulation. Building facades should incorporate design elements to provide a
base, middle, and top of the building to reinforce the pedestrian scale at the street level.
13.52 Height. For buildings greater than four stories in height, then the upper floors above the
fourth story shall step back six feet for fifty percent of the width of the primary facade. For
buildings greater than six stories, then the upper floors above the sixth fl oor shall step back an
additional six feet on the primary façade. These step back areas may begin at a lower height than
these minimums as part of the building design in order to be compatible with the character of the
area.
67
Page 68
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 7 of 13
13.53 Step back areas. The step back areas should be open to the sky and can be open air
balcony spaces or other design architectural features that are not enclosed spaces.
13.54 Off-street parking. Off-street parking lots shall not be permitted to be situated between the
street line and the primary facade of the principal building. Consideration should be given to
locating parking to the side or rear of the building.
13.55 Screening. Any off-street parking lots provided shall be screened from the street line by
buildings, landscaping, or other means. Off-street parking lots shall be screened from adjacent
residential zones and residential uses. This screening provision does not apply to adjacent alleys.
V. Review of DESIGN STANDARDS AND GUIDELINES
The subject property is located in the H (Historic District Zone) within the Capitol Square Context.
The Capitol Square Context is described on pages 2-8 and 2-9 of the Design Standards and
Guidelines for the City of Dover Historic District Zone. This Design Standards and Guidelines
describe this context as “neo-Georgian featuring two-story brick facades with a water table, marble
surround at the entrance, keystones over the window heads, dentilled cornices and hip roofs…
greater latitude is recommended in determining what is appropriate for new construction and
additions within this context… a compatible contemporary building is preferable to a falsely
historical one.” Location within the Dover Historic District Zone requires proposals for
demolition, new construction, building additions, and certain renovation or rehabilitation activities
to existing buildings to receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an
Architectural Review Certificate will be granted “if it is found that the architectural style, general
design, height, bulk and setbacks, arrangement location and materials affecting the exterior
appearance are generally in harmony with neighboring structures and complementary to the
traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the
Historic District Commission will provide a recommendation to the Planning Commission
regarding the Revised project’s compliance with the architectural review standards.
This Revised proposal must be reviewed for conformity with the design criteria guidelines found
in Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings
and Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the
review considerations is given below.
Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings
The Design Standards and Guidelines for Maintenance, Repair, Preservation and Restoration of
Existing Historic Buildings (Chapter 3: pages 3-1 through 3-27) provide the design criteria and
development guidelines. The preservation of the historic character of the District is largely a
function of the preservation of the existing historic building fabric. This Chapter discusses the
various building elements and should also be referenced with new construction.
Any off-street parking lots provided shall be screened from the street line by buildings,
landscaping, or other means. The guidelines specify that “parking lots should be screened from the
street, their layout should include borders and islands planted with trees and shrubs to break-up
68
Page 69
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 8 of 13
expanses of paved areas. Given a parking lot within the Dover Historic District zone, at least 20%
of the area within it should be unpaved and planted.”
Demolition
The proposal for demolition of a portion of the building must be reviewed for conformity with the
design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and
Relocation. The Design Standards and Guidelines gives guidance to the Historic District
Commission by listing specific criteria to be evaluated when considering applications for the
demolition of buildings (or portions of buildings) in the historic district (Chapter 4: pages 4-10 to
4-12). These guidelines are summarized below (see Design Standards and Guidelines for the
complete text).
1. Determine the financial implications of maintaining a property versus demolition.
2. Regardless of economic issues the relative significance of the individual buildings slated for
demolition should be evaluated.
3. In development related applications the City should review the schematic plans for the new
structures to weigh the virtues of the new structure versus what exists.
4. Determine the extent of adequate recordation of a property the applicant would be required
to complete if demolition were approved.
5. Lots left vacant by demolition should be treated in a manner that is sympathetic to the historic
context.
New Construction
The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8)
provide the design criteria and development guidelines. The guidelines specify the following
individual considerations for new construction to be considered in the review by the Historic District
Commission (and Planning Commission) of the project for Architectural Review Certification:
• Style
• Scale (building to reflect dominant cornice and roof height of adjacent buildings)
• Elevation of the First Floor
• Floor-to-Floor heights
• Bays, windows, and doors (size, relationship, spacing of)
• Absolute Size (compare overall size of new building)
• Massing (relationship of solid-to-void)
• Orientation (location of primary façade)
• Proportions (comparison of height to width of building and elements)
• Materials
• Forms (shape of building and roof to be complementary)
• Siting (location of building on lot and in relation to street)
• High density/ large-scale construction
69
Page 70
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 9 of 13
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage,
height, etc. This Revised Proposal for the Old Post appears to conform to most of the bulk
requirements of the C-2 Zoning District; however, should be verified via Site Plan review. The
City of Dover Zoning Ordinance authorizes the Historic District Commission to waive certain bulk
standards when issuing its recommendation to the Planning Commission for an Architectural
Review Certificate if necessary. It is noted that the Zoning Ordinance also includes other site
development requirements such as dumpsters, lighting, tree planting, bicycle parking, rear
emergency access, spacing requirements, etc.
ACTION on ARCHITECTURAL REVIEW CERTIFICATION (for HI-25-01 with February
2025 Review by Historic District Commission and March 17, 2025 Review by Planning
Commission):
Application HI-25-01 was considered at the February 20, 2025 Meeting of the Historic District
Commission. The following members were present at the February Meeting: Chairman Eric
Czerwinski, Vice-Chair Mrs. Ellen Richardson, Mrs. Ann Horsey, and Ms. Mary Mason. The
application was represented by Mike Glick of Lighthouse Construction along with Lauren
Townsend. Public testimony was received during the Public Hearing from Todd Stonesifer as Board
President of the Downtown Dover Partnership.
During the Meeting, the Historic District Commission heard the applicants’ presentation on The Old
Post Project and including their response to the series of Staff Comments and Recommendations.
They presented information on the site’s history; the development site and building placement;
building architectural features and materials; and other site items. Questions focused on the building
elevation detailing, planned uses in the building, and building height.
Action on Architectural Review Certification Recommendation by Historic District Commission:
The motion to recommend approval passed 4-0 of the members present for this application at the
February 20, 2025 Meeting. The Historic District Commission recommended approval of the
Architectural Review Certificate for Application HI-25-01 The Old Post at 55 Loockerman
Plaza based on the applicant’s presentation and plans with reference to the Staff notes and
amendments (Staff Recommendation Report – Section VI) and with information from the applicant’s
Response Letter.
Action on Architecture Review Certification and Site Plan by the Planning Commission:
On March 17, 2025, the Planning Commission voted 9-0 to approve the Site Plan, including the
Architectural Review Certification. The motion is as follows:
Mr. Lewis moved to approve S-25-07 The Old Post at 55 Loockerman Plaza and the
associated Architectural Review Certification for the redevelopment of the old Post Office
property including the Parking Strategy Statement and the Active Recreation Area Plan,
seconded by Mr. Baldwin and the motion was carried 9-0 by roll call vote. Mr. Lewis voting
yes; he thinks it is much needed in the area and it’s an exciting plan. He is looking forward
to seeing it come to fruition. Mr. Roach voting yes; for reasons previously stated. Mrs.
70
Page 71
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 10 of 13
Denney voting yes; but she really does object to the parking. She sees problems but
otherwise she thinks it is well done. Mrs. Maucher voting yes; for reasons stated. Mr.
Baldwin voting yes; he thinks it is a great use of the building. Dr. Jones voting yes; for
reasons previously stated. Mr. Reaves voting yes; for reasons previously stated. Mrs. Welsh
voting yes; she thinks it is a professionally well done package and she thinks it’s in keeping
with what we are trying to accomplish in Downtown Dover. Mr. Witham voting yes; he
thinks this is an excellent use of this property given the limited use of this space that the
property has. He thinks that the parking arrangement is probably the best that they could
come up with given the environment that they are faced with. It is a well-designed building
and the only drawback that he see is that it does not have a flagpole indicated. He votes
yes for the reasons stated in the record by fellow Commissioners as well as the DAC
comments and the Planning Commission’s statements.
VI. STAFF COMMENTS AND RECOMMENDATIONS
The Staff Comments and Recommendations for this application regarding the Architectural
Review Certification were originally provided in the Architectural Review Staff Report Issued for
the February 20, 2025 Historic District Commission Meeting. The comments and
recommendations were updated for this Report following Staff’s review of the Revised
Submission dated October 17, 2025.
The following are Staff comments and recommendations for this application regarding project
activities and Architectural Review Certification. Notes are added in italics on the additional
information provided in the updated Revisions shown in the Elevation Drawings and Site Plan Set
provided for the November 20, 2025 at the Historic District Commission Meeting.
1) Staff again recommends conditional approval of the Architectural Review Certificate for
The Old Post project, finding that the building to be of a compatible design with the nearby
buildings and with the intent of the Design Standards and Guidelines for the City of Dover
Historic District Zone. This includes the demolition of the rear portion of the building, the
renovation of the front section with the addition of a second floor to the front building
wings, and the new building addition at the rear (north). The proposed multi-use site
enhances the pedestrian scale of the downtown area. The preservation of the general
building massing portion (and footprint) fronting Loockerman Plaza maintains the historic
context of the area. The brick exterior finishes on the second-floor addition and on the
upper three stories and EFIS in a white brick appearance (to resemble bricks) along the first
story on the new addition take cues from the architectural styles seen in the Loockerman
Street corridor and Capitol Square context.
2) The following conditions are recommended by Staff to improve the project’s compliance
with the recommended guidelines of the Design Standards and Guidelines. The following
are recommended conditions:
a. The selected brick choices should be compatible with the brick on the existing
structure. The brick material color, size, and format should be identified. A brick
sample of a Glen Gary brick was shown.
71
Page 72
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 11 of 13
b. At the transition point from the existing first floor to the new second floor in the
front building wings should be clarified some type of brick detail would blend the
brick transition/break in old brick and new brick. The Revised Elevations show a
row lock brick pattern at this transition.
c. Clarify the pattern treatment of the EIFS finishes on the first floor of the rear
addition. The rendering as brick with a dark grout line is a very busy pattern. This
should be simplified to a flat finish with scored lines to add details of horizontal and
vertical bands as it appears on the linework drawings. The Revised Elevations show
this updated EIFS pattern.
d. Clarify the wall section at the cornice to clarify if the cornice protects in a different
plane than the general wall surface. Cornicework is a very significant feature of the
buildings in the area. It is unclear if the proposed building would include dentil
cornices. Dentil cornices are recommended, particularly on the south-facing side of
the building.
e. A paneled door should be used on the exterior doors unless it is a glass door
opening. Modern flush doors are not appropriate.
f. Repairing windows with in-kind materials is preferable to replacing windows.
When irreparable, replacement windows should replicate the historic windows as
closely as possible in light pattern, opening size, and function. The main block of
the building appears to originally have 12 over 12 light windows. Windows were
revised to 12 over 12 light windows.
g. While shutters are encouraged, vinyl and aluminum shutters are inappropriate. The
material for the replacement shutters was not identified. Noted the use of wood
shutters.
h. It is inappropriate to remove historic decorative elements. The round six-part
window with trimwork in the tympanum should be retained and the building name
can be placed under it still in the pediment. The six-part window is retained.
i. Consideration of wall or free-standing signage may require additional review.
j. Clarify the roof to wall connection from the front building to the rear addition. It
appears that some areas may result in valleys trapping water and debris. A roof
cricket to be designed to make the transition.
k. Identify any roof drainage systems i.e. gutters and downspouts and the proposed
materials. The use of bronze-colored gutters and drains to match existing.
l. Clarify if brick will be used as the exterior cladding materials for the dormer.
Typically, masonry is not used in these features and a siding material and trimwork
is more often used. The dormer cladding revised to be Hardie (composite) siding.
m. Identify the main entrance door(s) to the apartment building area; is it on Innovation
Way or from the parking lot sides?
n. Identify the railing materials along the steps in the sidewalk system and for the
accessible ramp on the north end of the building. Ensure there is adequate space to
fit the ramp and sidewalk.
o. Any light fixtures utilized on the property should be consistent with the style of the
lighting used in the nearby areas of the Capitol Square Context of the Historic
District.
72
Page 73
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 12 of 13
p. Any revisions or changes in the identified materials may be subject to further
review by the Historic District Commission.
3) Some of the site improvements/amenities were not specifically described or had limited
information within the application information. Please provide information for
consideration and discussion. This information is in the updated Site Plan set.
a. Provide information on the dumpster enclosure construction and screening.
b. Identify format of black aluminum fencing.
c. Provide information on the tree planting plan, other landscaping, and the format of
the Zen garden area.
d. Identify location of bicycle parking (exterior rack).
4) Clarify whether existing trees on the site will be preserved. If they are proposed to be
removed, replacement of removed trees will be required. The development area (the
property) is also subject to tree planting requirements of the Zoning Ordinance.
5) Staff recommends the following pertaining to the site design elements of the project:
a. The C-2 zoning district requires that parking lots be screened from the street. This
Revised Plan appears to have deleted to the parking lot improvements from
Innovation Way that added curbing and grass areas. These should be
reimplemented. The Site Plan was revised to include the central island with
plantings.
b. Evaluate the parking lot space locations as some spaces are not full sized or would
be impacted by the Dumpster Enclosure gates. Also, the northern drive aisle does
not meet the width requirement for two-way travel. Remove unnecessary paving to
create green islands. Add parking bumpers to ensure vehicles do not impact fence.
c. The sidewalk system on the street frontage should continue and include barrier free
access, crosswalk striping, etc. at the points of intersection with the entrance and
exit drive aisles.
d. Any proposed landscaping or tree planting locations, and lighting fixture locations
should be depicted on the plan and be consistent with the character of these
elements as they exist within the Capitol Square Context area.
6) The existing building has a cornerstone/date stone that should be retained. There may also
be an opportunity to add a plaque or other method outlining the history of the building
(time of service as the Dover Post Office).
7) For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Building Inspection Staff and Fire Marshal regarding these
requirements. The resolution of these items can impact the site design in some cases.
8) In the event that major changes and revisions to the design, materials, or site layout occur
in the finalization of the plan and/or construction drawings contact the Department of
Planning and Inspections. These changes may require resubmittal for review by the
Historic District Commission.
73
Page 74
Item 3.
HI-25-01 The Old Post (Revised) at 55 Loockerman Plaza
Revised Architectural Review Certification Recommendation Report from Historic District Commission
November 20, 2025 Meeting
Page 13 of 13
9) This site development plan for this Revised project is also subject to the application and
review process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before
the Planning Commission. Note: Additional technical items for compliance with the Zoning
Ordinance and other regulations may be identified during the Site Plan Process. Review
comments pertaining specifically to the Site Plan set will be issued at that time.
10) The applicant shall be aware that Building Permits are required to proceed with any
construction activities on the project site. The permit applications must comply with the
approvals and conditions granted through the Architectural Review Certification and Site
Plan Review process.
11) The applicant should be aware that a Sign Permit is required to proceed with the placement
of signage on the property.
VII. Historic District Commission Action on Revised Submission
The Historic District Commission considered the Revised proposal at their Meeting of November
20, 2025 and have provided a recommendation in regard to the Revised Architectural Review
Certification for The Old Post and associated Site Improvements. The recommendation reflects
consideration of the Design Standards and Guidelines for the City of Dover Historic District Zone.
The specific conditions of the Recommendation are noted in this Report under the heading of
“Action of the Historic District Commission (on Revised Submission).”
Documents Considered by the Historic District Commission on November 20, 2025:
• Revised Project Architecture Graphic Preservation Set of architectural renderings of
building floor plan and elevation drawings of Building
• Site Plan Sheet
• Updated Revised Building Architecture Elevations (two pages) of 11/20/2025
• Updated Site Plan Set of 11/20/2025
74
Page 75
City of Dover
Item 3.
DATA SHEET FOR RECREATION PLAN REVIEW
Review of Revised Active Recreation Area Plan
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF December 9, 2025
Planning Commission Meeting of December 15, 2025
Plan Title: The Old Post at 55 Loockerman Plaza (S-25-07 Revised)
Plan Type: REVISED Site Development Plan: Revised Active Recreation Area Plan
Location: Northwest corner of Loockerman Plaza and Innovation Way in Dover, DE
Tax Parcel: ED-05-077.05-04-53.00-000
Previous Owner: City of Dover
Current Owner: Old Post, LLC
Property Area: 1.267 Acres +/-
Proposed Use: Mixed-Use Commercial and Multi-family Housing (Apartments – 42
dwelling units) and associated parking
Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
SWPOZ (Source Water Protection Overlay Zone): Tier 3- Excellent
Recharge Area – portion of site
I. Project Summary
The Revised Old Post project will be reviewed as a Site Development Plan and for Architectural
Review Certification by the Planning Commission. The Plan proposes redevelopment of the
1.267-acre site formerly occupied by the Dover Post Office. The project involves the demolition
of the rear warehouse portion of the existing building, reconstruction of the rear portion of the
building into four-story apartment structure (building addition of 43,092 SF), and adaptive re-
use of part of the front 4,560 SF portion of the building for restaurant, commercial retail or
business space. The Revision includes proposed increases in apartment unit count from 36 to 42
units and architectural changes consisting of a second-floor addition to the front wings.
II. Active Recreation Area Plan Summary:
As part of the Plan review process for this project, the applicant is required to provide open space
and Active Recreation Area in accordance with the Zoning Ordinance, Article 5, Section 10.
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations,
Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).
P. O. Box 475 Dover, DE 19903 75
Community Excellence Through Quality Service
Page 76
S-25-07 Revised The Old Post at 55 Loockerman Plaza Item 3.
Summary Report of Revised Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on December 9, 2025
Page 2 of 5
Article 5 Section 10
Section 10. - Open space, recreation, and other public facilities.
The City of Dover shall require the reservation of open space, recreation, and other public facilities in
accordance with the provisions of this section as a condition of approval for all one-family dwelling,
two-family dwelling and multiple-family dwelling residential developments requiring conditional use
approval, site development plan approval, or land subdivision approval by the City of Dover Planning
Commission.
10.1 Recreation areas.
10.11 Purpose. The purpose of this section is to ensure that active recreation areas are
provided as an integral design element within residential developments and that such facilities are
of an adequate scale in relation to the size of the residential development and which provide
residents with a variety of active recreational pursuits.
10.12 Dedication required. The commission shall require the dedication or reservation of
recreation areas, and the subsequent construction of recreation facilities of a character, extent
and location suitable to the needs created by a development for recreation facilities as defined
and in accordance with the design guidelines set forth.
10.13 Definition. The following are illustrative of the types of recreation areas and subsequent
facilities that shall be deemed to serve active recreational needs and therefore to count toward
satisfaction of the recreation area requirements of this section: tennis courts, handball courts,
racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within
clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and
play apparatus, and developed walking, jogging or biking trails.
Because the project is located within the Downtown Redevelopment Target Area, it qualifies for
an exemption under Article 5, §10.515 Residential developments located within the Downtown
Redevelopment Target Area as defined in Appendix C. Under this provision, the applicant must
provide 75 square feet of active recreation per dwelling unit with a minimum of 2,500 square
feet provided on site. See code excerpt:
Article 5 §10.5 Exemption to recreation area and open space dedication.
10.51 Exemptions for small developments.
10.515 Residential developments located within the Downtown Redevelopment Target
Area as defined in Appendix C. These developments shall be exempt from the area
requirements set forth in section 10.16, but shall be required to provide 75 square feet
of active recreation area per dwelling unit with a minimum of 2,500 square feet
provided on site. If the commission determines that the construction of the entirety of
the required active recreation area is not practical or desirable, the commission shall
require a cash in lieu donation for the active recreation area determined as not practical
or desirable. Cash in lieu shall be calculated in accordance with subsection 10.173 of
this article.
The Site Plan set includes information on the proposed Active Recreation amenities along with a
Narrative Letter. A separate Active Recreation Plan sheet was not provided for the project. The
Site Plan sheet and Landscape Plan sheets identify a proposed East Zen Garden area between the
building addition and Innovation Way with a fenced area of 2,424 SF including benches and a
yoga area; and a West Zen Garden with an area of 1,646 SF between the building and the
parking area including benches. The building plans provided show a gym on the second floor of
506 SF. As currently shown on the floor plan, this area of the building is not accessible to
persons with disabilities due to a series of steps to move from the rear addition into the front
portion of the existing building. However, the Narrative Letter indicates that the steps will be
replaced with a ramp system for access.
76
Page 77
S-25-07 Revised The Old Post at 55 Loockerman Plaza Item 3.
Summary Report of Revised Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on December 9, 2025
Page 3 of 5
This Revised Active Recreation component must be reviewed by the Parks, Recreation, and
Community Enhancement Committee for a recommendation prior to consideration of the Site
Plan by Planning Commission. Previously, the initial version of the Old Post project was
presented to the Parks, Recreation and Community Enhancement Committee on March 11, 2025
for recommendations. The Site Plan S-25-07 The Old Post was then granted conditional approval
by the Planning Commission on March 17, 2025. This Application Revised S-25-07 will be
subject to the same process with a public hearing before the Planning Commission.
The following table provides information from the submitted Revised Plans and drawings for
The Old Post project showing the Active Recreation Area plan. This focuses on the amenities
specifically being developed with this project:
Required Provided on Plan
Active Recreation Area 75 SF per dwelling unit 2,424 SF East Zen Garden with
(Article 5 §10.515) or 2,500 SF, greater thereof Yoga Area, Walking Path, and
42 DU = 3,150 SF benches
Requires 3,150 SF 1,646 SF West Zen Garden with
benches
506 SF Gym
Total: 4,576 SF
Active Recreation Accessible The Zen Gardens do not identify the
Amenities walking path surface. The benches
(Article 5 §10.15) are placed near sidewalks or paths.
The gym on the second floor will be
accessible if the ramp system is
implemented in place of steps.
Active Recreation Age Oriented to development Amenities can be used by a variety
Amenities of age groups.
(Article 5 §10.15)
Parking The entire site has 65 parking
spaces on site to serve the residents
with other parking nearby.
Bicycle rack at southwest corner of
building and indoor bike storage
area also.
Setbacks: 30 feet from Amenities do not include game
residential lots and 25 feet from courts that are subject to this
right-of-way for street requirement.
Landscaping The Landscape Plan shows trees
and shrubs in both East and West
Zen Garden areas.
III. STAFF RECOMMENDATIONS:
The following are comments and recommendations from Staff of the Department of Planning &
Inspections and the Parks & Recreation Department following review of the Active Recreation
Area proposed for The Old Post project as Revised.
77
Page 78
S-25-07 Revised The Old Post at 55 Loockerman Plaza Item 3.
Summary Report of Revised Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on December 9, 2025
Page 4 of 5
1. The Revised project plan is required to provide 3,150 SF of Active Recreation Area. The
Plan shows a 2,424 SF East Zen Garden, a 1,646 SF West Zen Garden, and a second-
floor gym that measures approximately 506 SF. The Plan meets the area requirements.
2. With the updated details provided about the Active Recreation amenities for the site, staff
recommends approval of the Active Recreation Plan subject to the following
clarifications or conditions for the details of the recreational amenities:
a. Identify surface of Yoga Area and ensure connection to accessible pathway.
b. Identify surface materials of the Walking Pathway and its width.
c. Ensure placement of the benches are accessible from the walking pathway and
allow for someone to move off the pathway to rest.
d. Ensure the placement of light posts does not impede any sidewalk. Check light
post positions along the parking area.
e. Ensure that the gym space is accessible from the rear addition and through any
doors. Due to the difference in floor-to-floor heights a ramp system or other
format will be necessary rather than just steps. This will need to comply with
applicable Building Codes and Fire Codes.
3. Staff recommends a greater mix of tree plantings as currently as all tree plantings in the
Zen Garden areas are proposed as Columnar Oak trees (QR). If disease or pests impact
this tree type there is the potential to lose all trees since they are of the same variety.
4. The applicant should submit an Active Recreation Plan sheet or augment the current plan
set to clearly provide the Active Recreation area calculations and details on the proposed
Zen Garden areas and gym and indoor bicycle storage area.
5. Staff notes that this location in the Downtown is in a walkable area where the sidewalk
system leads to open space areas like Mirror Lake Park, Silver Lake Park, the Legislative
Mall area, and The Green and to the Capital City/St. Jones Greenway trail system.
6. The applicant is reminded of the requirements for construction phasing of the recreation
area associated with the development of the residential units. With all residential units in
one building, the recreation amenities will have to be completed in conjunction with the
building’s construction and prior to issuance of a Final Certificate of Occupancy.
Article 5 §10.6 Construction Phasing. The recreation and open space areas shall be
completed in a proportion equal to or greater than the proportion of residential dwelling
units completed, except that one hundred (100) percent of the recreation and open space
areas shall be completed prior to issuing building permits for the final twenty (20) percent
of the dwelling units proposed. Building permits shall not be issued for dwelling units
unless the requirements of this section are met.
7. There shall be provisions which ensure that the common open space land (including
active recreation area) shall continue as such and be properly managed and maintained.
The developer shall either retain ownership and responsibility for maintenance of such
open land; or provide for and establish one (1) or more organizations for the ownership
and maintenance of all common open space i.e. a Homeowners Association. The
organization shall be responsible for maintenance, insurance and taxes on the common
open space.
78
Page 79
S-25-07 Revised The Old Post at 55 Loockerman Plaza Item 3.
Summary Report of Revised Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on December 9, 2025
Page 5 of 5
IV. ADVISORY COMMENTS
1. In the event that major changes and revisions to the Revised Site Plan occur in the
finalization of the Site Plan, contact the Department of Planning and Inspections. Examples
include reorientation of building, relocation of site components, and increases in floor area.
These changes may require resubmittal for review by the Development Advisory Committee,
Planning Commission, or other agencies and commissions making recommendations in
regard to the plan.
2. The Parks, Recreation, and Community Enhancement Committee shall submit to the
Planning Commission a report detailing the recommendations as to the Recreation Area Plan.
Attachments:
• Revised S-25-07 Plan Set (print date 12/3/2025)
• Narrative Letter on Recreation Plan
• Select Floor Plans: First Floor and Second Floor
• Cover Page from Architectural Graphics Set (from Historic District Commission
Presentation
Note: This Revised Review Report was initially prepared by Staff of the Rossi Group (under a
Planning Services contract with the City of Dover). The Report was completed with additional
review and editing by the City’s Planning Office.
79
Page 80
Item 3.
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA
Jason P. Loar, P.E.
December 3, 2025 Jamie L. Sechler, P.E.
City of Dover
15 Loockerman Plaza
Dover, DE 19901
Attn: Dawn Melson-Williams, AICP
RE: Old Dover Post
55 Loockerman Plaza
DBF #: 2916A036
Dear Mrs. Melson-Williams:
The following is the Parking Strategy for the proposed Old Post mixed use development located
at 55 Lookerman Plaza:
The developer proposes to provide 1 space per bedroom for all of the apartments. This brings the
total number of parking spaces necessary for the apartments to 65 spaces. For the restaurant, the
developer is proposing to provide 1 space per 4 seats or 3 barstools for 56 necessary spaces. This
brings the total necessary for the proposed site to 121 spaces.
The parking to be provided for the proposed site is as follows; 62 onsite parking spaces will be
provided for use by the tenants of the apartment units. 29 parking spaces will be provided on that
adjacent parcel directly to the west (Dover Library) through an existing easement with the City
of Dover that is already in place to be used by the apartment tenants and patrons of the
restaurant. And directly contiguous to the Old Dover Post there are approximately an additional
180 public parking spaces available to serve the patrons of the proposed restaurant use along
Innovation Way, Loockerman Plaza and the Dover Library parking lot.
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744 80
www.dbfinc.com
Page 81
Letter: City of Dover
December 3, 2025 Item 3.
Page 2
The tables below provide a detailed breakdown of the parking strategy.
NECESSARY PARKING
NUMBER
OF FLOOR
UNIT TYPE REQUIREMENT UNITS AREA NUMBER OF SPACES
1 BEDROOM APARTMENT 1 SPACE 17 17
2 BEDROOM APARTMENT 2 SPACE 15 30
3 BEDROOM APARTMENT 3 SPACE 4 12
STUDIO APARTMENT 1 SPACE 6 6
SUB-TOTAL: 65
SPACES
1 SPACE PER 4 SEATS/3
RESTAURANT BAR STOOLS 4,560 S.F. 56
SUB-TOTAL: 56
SPACES
TOTAL: 121 SPACES
PROVIDED PARKING
PARKING TYPE USE NUMBER OF SPACES
PROPOSED ONSITE APARTMENTS 62
SHARED SPACES ON EXISTING EASEMENT APARTMENTS AND
WITH CITY OF DOVER ON ADJACENT PARCEL RESTAURANT 29
PUBLIC SPACES (LIBRARY LOT, INNOVATION
WAY, LOOCKERMAN PLAZA) RESTAURANT 180
TOTAL: 271 SPACES
If you have any questions or require additional information, please do not hesitate to contact me
at (302) 424-1441 or via email at csw@dbfinc.com.
Respectfully Submitted,
Davis, Bowen & Friedel, Inc.
Chad S. Warren, P.E.
Associate/Sr. Civil Engineer
81
Page 82
Item 3.
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA
Jason P. Loar, P.E.
December 3, 2025 Jamie L. Sechler, P.E.
City of Dover
15 Loockerman Plaza
Dover, DE 19901
Attn: Dawn Melson-Williams, AICP
RE: The Old Post
55 Loockerman Plaza
DBF #: 2916A036
Dear Mrs. Melson-Williams:
On behalf of the developer, we are respectfully requesting an exemption from Appendix B,
Zoning, Article 6, Section 5.3 of the City of Dover.
Appendix B, Zoning, Article 6, Section 5.3 of the City of Dover code is a supplementary parking
regulation for multiple dwellings that states among other things, “The parking of motor vehicles
within 15 feet of any wall or portion thereof, is prohibited.”. In order to provide an adequate
amount of parking for the proposed 42 unit apartment building and the restaurant, the parking lot
to the rear of the proposed building was designed to maximize the number of provided parking
spaces. In doing so, we were subject to several restrictions, these being the minimum parking
space size, minimum fire regulations fire lane widths, City of Dover minimum drive aisle widths,
and above all preserving the original post office building that fronts Loockerman Street per the
Historic District Zone and Architectural Review Certification requirements. With all of these
design restrictions considered, we were forced to place the parking spaces, including 3
handicapped accessible parking spaces, less than 15 feet of the rear (northern) side of the
building, while preserving the original post office building structure.
Under the Architectural Review Certification, Article 10, Section 3.25 states, “An architectural
review certificate may be issued if it is found that the architectural style, general design, height,
bulk and setbacks, arrangement, location and materials and structures affecting the exterior
appearance are generally in harmony with neighboring structures and complementary to the
traditional architectural standards of the historic district as set forth in the historic district
design guidelines and standards adopted by the planning commission and as set forth in the
United States Secretary of the Interior's Standards for Rehabilitation.”. Essentially leniency can
be provided in the general design, height, bulk and setbacks in order to maintain the traditional
architecture of the historic district. Specifically in our case, this provides the ability to allow
exclusion from the minimum 15’ distance between parking spaces and the proposed multifamily
building.
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744 82
www.dbfinc.com
Page 83
Letter: City of Dover
December 3, 2025 Item 3.
Page 2
Additionally, we have discussed this same proposal with the City Fire Marshal and they have
agreed to allow these parking spaces within the 15 feet minimum of the building as this side of
the building does not grant them access to any windows, balconies, etc. above the ground floor
level. These potential emergency points of egress are located on the east and west side of the
multifamily building. Only ground level entry doors and three windows withing the stairwell are
provided at the rear of the building and parking is prohibited for a width of 9 feet in front of the
entry door.
We do intend to adjust the drive aisle widths to maximize the distance between the building and
the adjacent parking spaces, however we will not be able to reach the minimum separation
distance. We appreciate your understanding of this matter and to provide convenience for the
tenants and patrons of the apartments, restaurants, and offices, and to preserve a historic building
of downtown Dover we respectfully request exemption from the minimum distance of 15’ from
parking space to a building as found in Article 6, Section 5.3 of the City of Dover zoning code.
If you have any questions or require additional information, please do not hesitate to contact me
at (302) 424-1441 or via email at csw@dbfinc.com.
Respectfully Submitted,
Davis, Bowen & Friedel, Inc.
Chad S. Warren, P.E.
Associate/Sr. Civil Engineer
83
Page 84
Item 3.
Ring W. Lardner, P.E.
W. Zachary Crouch, P.E.
Michael E. Wheedleton, AIA, LEED GA
Jason P. Loar, P.E.
December 3, 2025 Jamie L. Sechler, P.E.
City of Dover
15 Loockerman Plaza
Dover, DE 19901
Attn: Dawn Melson-Williams, AICP
RE: Old Dover Post
55 Loockerman Plaza
DBF #: 2916A036
Dear Mrs. Melson-Williams:
On behalf of the developer, we are writing this letter to detail the provided Active Recreation
Area provided on the proposed Old Dover Post site.
The City of Dover code requires 75 s.f. or recreation area per dwelling unit with a minimum of
2,500 s.f. or spaces. For our proposed 42 units this totals 3,150 s.f. of required active recreational
area.
The developer is proposing to provide two Zen Gardens and an indoor Gym on the proposed site.
The Zen Garden on the west side of the building is 1,646 s.f. and provides patios, benches, shade
trees, and shrubbery for tenants of the apartments to take advantage of. The Zen Garden to the
east of the proposed apartments will provide patios, shade trees, benches, a walking path, and a
yoga station as amenities for the apartment tenants. A 506 s.f. indoor gym is proposed on the
second floor of the apartment building for tenant use. There were some questions about
accessibility to the gym as the previous design called for a half flight of stairs to the gym which
are not ADA accessible, however the architectural plans have been revised to provide an ADA
accessible ramp in place of the half flight of stairs. In all the total provided Active Recreational
Area is 4,576 s.f, well exceeding the space required by code.
If you have any questions or require additional information, please do not hesitate to contact me
at (302) 424-1441 or via email at csw@dbfinc.com.
Thank you,
Davis, Bowen & Friedel, Inc.
Chad S. Warren, P.E.
Associate/Sr. Civil Engineer
601 E. MAIN STREET, SUITE 100, SALISBURY, MD 21804 • 410-543-9091
1 PARK AVENUE, MILFORD, DE 19963 • 302-424-1441
106 N. WASHINGTON STREET, SUITE 103, EASTON, MD 21601• 410-770-4744 84
www.dbfinc.com
Page 85
Item 3.
INDEX OF SHEETS
OLD DOVER POST C-001
C-002
C-101
C-102
TITLE
LEGEND
EXISTING CONDITIONS
SITE PLAN
COMMERCIAL PROPERTY C-103
C-301
SITE DETAILS
GRADING PLAN
SITE C-401 SEDIMENT AND STORMWATER COVERSHEET AND GENERAL NOTES
GENERAL NOTES:
1. VERTICAL DATUM IS NAVD 88.
EAST DOVER HUNDRED C-402
C-403
PRE CONSTRUCTION SITE STORMWATER MANAGEMENT PLAN
CONSTRUCTION SITE STORMWATER MANAGEMENT PLAN
CITY OF DOVER, KENT COUNTY, DELAWARE
2. EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS, INCLUDING TELEPHONE, ELECTRIC, CABLE TV, GAS, C-404 - C-405 CONSTRUCTION SITE DETAILS AND NOTES
TRAFFIC, SIGNAL, WATER, SEWER, FORCE MAINS AND STORM DRAINAGE ARE BASED UPON THE BEST
AVAILABLE INFORMATION AND ARE SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR ONLY. NO C-501 UTILITY PLAN
GUARANTEE IS MADE OR IMPLIED REGARDING THE ACCURACY OR COMPLETENESS THEREOF. CONTRACTOR IS
C-502 UTILITY DETAILS
RESPONSIBLE FOR THE VERIFICATION OF THE LOCATION, DEPTH, SIZE AND MATERIAL OF ALL UNDERGROUND
UTILITIES TO HIS OWN SATISFACTION BEFORE BEGINNING ANY EXCAVATION OR PIPE LAYING. THE CITY,
L-101 LANDSCAPE PLAN
OWNER, AND ENGINEER DISCLAIM ANY RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF SAID
DBF #2916A039
INFORMATION. IF THE CONTRACTOR RELIES ON SAID INFORMATION, HE DOES SO AT HIS OWN RISK. THE L-102 LANDSCAPE DETAILS
GIVING OF THE INFORMATION ON THE PLANS WILL NOT RELIEVE THE CONTRACTOR OF HIS OBLIGATIONS TO
SUPPORT AND PROTECT ALL SHOWN OR NOT SHOWN EXISTING UTILITIES AND APPURTENANCES. SHOULD ANY V-101 RECORD TITLE
LOCATION MAP EXISTING UTILITIES BE DAMAGED BY THE CONTRACTOR, THEN THE CONTRACTOR SHALL REPAIR THE DAMAGE
CAUSED TO THE CITY'S SATISFACTION, AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL MAKE HIS V-102 RECORD PLAN
1" = 1200' OWN INVESTIGATION AND TEST PIT EXISTING UTILITIES AS REQUIRED.
NOVEMBER 2025
3. CONTRACTOR SHALL NOTIFY "MISS UTILITY" (1-800-282-8555 IN DE) & (1-800-441-8355 OUTSIDE OF DE) AT LEAST
48 HOURS PRIOR TO EXCAVATION TO HAVE EXISTING UNDERGROUND UTILITIES LOCATED AND MARKED.
DATA COLUMN
4. ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
1 TAX MAP ID 2-05-07705-04-5300-00001
5.
6.
USE ONLY SUITABLE AND APPROVED GRANULAR MATERIAL FOR BACK FILLING TRENCHES.
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF TRAFFIC IN ALL WORK AREAS IN ACCORDANCE
WITH DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (DE MUTCD), MOST RECENT VERSION. ANY
PAVEMENT MARKINGS OR PAINTED LINES DISTURBED OR REMOVED DURING CONSTRUCTION SHALL BE
CONSTRUCTION PLANS 2 ENGINEER
DAVIS, BOWEN & FRIEDEL, INC.
1 PARK AVENUE
MILFORD, DE 19963
JAMIE SECHLER
OWNER / DEVELOPER
OLD POST LLC,
91 BRENDA LANE, SUITE A
CAMDEN, DE 19934
FRANK DIMONDI
REPLACED IN KIND AFTER COMPLETION OF PAVEMENT RESTORATION. COST SHALL BE INCLUDED IN THE PHONE: (302) 424-1441 EMAIL:FDIMONDI@MSN.COM
R1UBV PRICES BID FOR PIPE INSTALLATION. EMAIL: JLS@dbfinc.com
VAT
KINGS HW INNO
7. CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL RIGHT-OF-WAY LINES AND PROPERTY LINES TO HIS
SITE OWN SATISFACTION. ALL PROPOSED UTILITIES ARE TO BE CONSTRUCTED WITHIN THE STREET RIGHT-OF-WAY
Y. ION
OR EASEMENT AREAS PROVIDED. ANY DISTURBED AREAS BEYOND THE RIGHT-OF-WAY OR EASEMENT LINES
ST.
CITY OF DOVER, KENT COUNTY, DELAWARE
ER MAN SHALL BE RESTORED IMMEDIATELY TO THEIR ORIGINAL CONDITION. PAYMENT FOR THIS WORK SHALL BE
L OCK INCLUDED IN THE COST OF ITEMS BID.
E. LO
WY.
8. CONTRACTOR SHALL PROVIDE STAKEOUT SURVEY NECESSARY FOR THE PARKING LOT CONSTRUCTION, THE
LAZA EGI INSTALLATION OF UTILITY WORK AND APPURTENANCES, AND DETERMINATION OF RIGHT-OF-WAY. 3 DATUM HORIZONTAL VERTICAL
AN P
SLA
R M NAVD 83 (DE STATE PLANE) NAVD 88
CKE
LOO 9. FITTINGS SHOWN ON THE PLANS ILLUSTRATE ANTICIPATED SIZE AND ANGLE OF DEFLECTION. THIS
FED TIVE
4 ZONING EXISTING PROPOSED
INFORMATION IS SHOWN FOR GENERAL INFORMATION ONLY, AND IS NOT GUARANTEED. ACTUAL SIZE AND
OLD DOVER POST
C2 C2
L ANGLE MAY VARY DUE TO FIELD CONDITIONS. THE CONTRACTOR WILL NOT BE ENTITLED TO ADDITIONAL
ERA AVE VD.
JR. BL COMPENSATION FOR CHANGES RESULTING FROM SUCH CONDITIONS. 5 LAND USE EXISTING PROPOSED
. G
KIN POST OFFICE MIXED USE
T. ST. HER
HS LUT 10. THROUGHOUT THE PROJECT, WHERE ANY UNDERGROUND UTILITIES ARE LOCATED IN, ACROSS OR ADJACENT 4,560 S.F. RESTAURANT & 42 APARTMENT UNITS
ORT T IN
E. N MAR TO DRAINAGE DITCHES AND SWALES, THE CONTRACTOR SHALL RESTORE DISTURBED AREAS TO THEIR
6 FLOODPLAIN THE PROPERTY IS IMPACTED BY THE 100 YEAR FLOODPLAIN AS DETERMINED BY
ORIGINAL GRADES. INSTALL EROSION CONTROL MATTING (AMERICAN GREEN SN 150) AND VEGETATE AS
FEMA PANEL 10001C0167H , DATED MAY 5, 2003.
NWI WETLANDS REQUIRED. PAYMENT OF THIS RESTORATION SHALL BE INCLUDED IN THE COST OF ITEMS BID.
7 GROUNDWATER RECHARGE ALL OF THE PROPERTY IS LOCATED IN AN AREA OF GOOD GROUNDWATER
1" = 400' 11. CONTRACTOR SHALL EXERCISE CAUTION AND TAKE MEASURES NECESSARY TO PROTECT TREES DURING RECHARGE.
CONSTRUCTION ACTIVITIES. DAMAGED TREES TO BE REPLACED, IN KIND, AT THE CONTRACTOR'S EXPENSE.
8 WELLHEAD PROTECTION AREA THE PROPERTY IS NOT LOCATED IN A WELLHEAD PROTECTION AREA.
12. ALL ROADWAYS ARE TO BE SWEPT FREE OF SEDIMENT ON A DAILY BASIS.
9 WETLANDS THE PROPERTY IS NOT IMPACTED BY STATE AND FEDERALLY REGULATED
13. MINIMUM COVER FOR ALL WATER MAINS SHALL BE 4'-0". WETLANDS.
2
10 UTILITIES WATER SEWER
14. PROVIDE CONCRETE BUTTRESSES FOR ALL BENDS, TEES, AND PLUGS ON PROPOSED WATER AND FORCE
CITY OF DOVER CITY OF DOVER
MAINS, PER DETAILS. ANCHOR AND ROD ALL HYDRANTS AS REQUIRED. WATER
15. PLACE NEW VALVES NEXT TO TEES, BENDS, ETC., SUPPORT ALL VALVE BOXES ON (2) SOLID 4" CONCRETE
INNO 11 CODE COMPLIANCE REQUIRED PROPOSED
Y. 3
VAT
KINGS HW
BLOCKS.
FRONT SETBACK 0 FT 0 FT
SITE
16. ALL VALVE CLOSURES AND CUT-INS SHALL BE COORDINATED WITH CITY. DEPARTMENT OF WATER & 1 ION . SIDE SETBACK 5 FT 5 FT
T
AN S
WY. ERM
WASTEWATER OFFICIALS WILL CARRY OUT ALL NECESSARY VALVE CLOSURES. CONTRACTOR SHALL K
COORDINATE ISOLATION OF EXISTING WATER MAINS WITH CITY AND NOTIFY RESIDENTS AT LEAST 48 HOURS OO C REAR SETBACK 20 FT 20 FT
SITE E. L
COMMERCIAL PROPERTY
LEG
PRIOR TO CUT-IN. MAXIMUM BUILDING HEIGHT 75 FT 45 FT
AZA 4
N PL ISLA
17. PIPELINE DETECTION TAPE SHALL BE INSTALLED CONTINUOUSLY ALONG AND DIRECTLY ABOVE ALL PROPOSED PARKING 0 62 ONSITE SPACES (INCLUDING 3 ADA
RMA
WATER, TWELVE (12") INCHES BELOW THE GROUND SURFACE. CKE 5 (SEE PARKING STRATEGY TABLE THIS ACCESSIBLE SPACES)
LOO
6 TIVE SHEET)
18. CONTRACTOR SHALL EXTEND WATER MAIN BELOW ANY CONFLICTS OR OBSTRUCTIONS TO PROVIDE REQUIRED FED 29 SPACES ON AN EASEMENT WITH THE
CLEARANCE. COST SHALL BE INCLUDED IN THE PRICE APPLICABLE ITEMS OF THE PROPOSAL. ERMA
N ST. AVE LVD. CITY OF DOVER ON ADJACENT PARCEL
W. L OOCK ERA GJ R. B
.
(INDLUDING 2 ADA ACCESSIBLE
KIN
ER
L ST
19. THE CONTRACTOR SHALL REMOVE AND IMMEDIATELY REPLACE, RELOCATE, RESET OR RECONSTRUCT ALL T. TH SPACES)
OBSTRUCTIONS IN THE WORK AREA, INCLUDING, BUT NOT LIMITED TO, MAILBOXES, SIGNS, LANDSCAPING, TH S TI N LU
NOR MAR
.
LIGHTING, PLANTERS, CULVERTS, DRIVEWAYS, PARKING AREAS, CURBS, GUTTERS, FENCES, OR OTHER E. 91 TOTAL SPACES
NATURAL OR MAN-MADE OBSTRUCTIONS. TRAFFIC CONTROL REGULATORY, WARNING, AND INFORMATIONAL
LOT COVERAGE 85.00% 80.57%
SIGNS SHALL REMAIN FUNCTIONAL AND VISIBLE TO THE APPROPRIATE LANES OF TRAFFIC AT ALL TIMES, WITH
THEIR RELOCATION KEPT TO A MINIMUM DISTANCE. THE COST SHALL BE INCLUDED IN THE COST OF ITEMS BID. RECREATIONAL AREA 75 S.F. OF RECREATIONAL AREA PER EAST ZEN GARDEN: 2,424 S.F.
DWELLING UNIT. WEST ZEN GARDEN: 1,646 S.F.
20. ALL PROPOSED VALVE BOXES IN UNPAVED AREAS SHALL BE SET IN 3000 PSI CONCRETE PADS, 5" THICK, 7" 75 S.F. X 42 UNITS = 3,150 S.F. SECOND FLOOR GYM: 506 S.F.
THICK IN TRAFFIC AREAS, AT AN 18" DIA.. TOTAL RECREATIONAL AREA: 4,576 S.F.
FEMA FLOOD MAP TREE PLANTING REQUIREMENTS 1 TREE PER 3,000 S.F. OF 19 PROPOSED TREES
21. PRIOR TO ISOLATION AND CUT-IN PROCEDURES, CONTRACTOR SHALL EXCAVATE, LOCATE AND OBSERVE
PANEL #10001C0167H SCALE: 1" = 1/2 MILE NON-WOODLAND DEVELOPMENT AREA
FUNCTION OF ALL EXISTING VALVES TO ASSIST IN THE SYSTEM ISOLATION. UTILIZE VALVES, IF OPERABLE, FOR
TEMPORARY ISOLATION. PAYMENT FOR VALVE EXPLORATION IS TO BE INCLUDED IN PRICES BID FOR WATER 55,191 S.F. / 3,000 S.F. = 19 TREES
MAIN INSTALLATION. CITY SHALL DOCUMENT LINE SIZE, MATERIAL AND MAIN LOCATION. CONTRACTOR IS 12 AREAS
ADVISED THAT SOME EXISTING ISOLATION VALVES MAY NOT BE FUNCTIONAL.
SacB Lo PARCEL AREA 1.267 AC.
22. PARKING SPACES RESERVED FOR USE BY THE HANDICAPPED AND RELATED ACCESSIBLE ROUTES SHALL BE IMPERVIOUS COVER 1.021 AC. (80.57%)
CONSTRUCTED IN ACCORDANCE WITH THE AMERICAN NATIONAL STANDARDS INSTITUTE GUIDELINES ENTITLED
"ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES" (REFERENCE: ANSI A117.1-1998). 13 PROPOSED LAND USE AREAS
BUILDINGS/PARKING 0.876 AC. (69.12%)
23. ALL EXISTING REGULATORY AND WARNING TYPE TRAFFIC SIGNS, AND ALL STREET NAME SIGNS OCCURRING
WITHIN THE PROPOSED PROJECT LIMITS SHALL BE REMOVED AND IMMEDIATELY REPLACED AS DIRECTED BY SIDEWALKS 0.145 AC. (11.45%)
THE CITY.
OPEN SPACE 0.246 AC. (19.43%)
0 400 800 1200
HkB W 24. CONTRACTOR SHALL GRADE, TOPSOIL, SEED, AND MULCH ALL DISTURBED AREAS OF CONSTRUCTION,
INCLUDING PIPE INSTALLATION OR DITCH CONSTRUCTION. EROSION CONTROL MATTING SHALL BE PROVIDED
LOCATION MAP TOTAL 1.267 AC. (100.00%)
Y. INNO ON ALL SLOPES GREATER THAN 3:1. SCALE: 1"=400'
KINGS HW
VAT 25. DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. ALL CONSTRUCTION
SITE
ION T. MUST BE DONE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, AS AMENDED
AN S
WY. E . LO
OCK
ERM AND ALL RULES AND REGULATIONS THERETO APPURTENANT. APPROVED
ZA LEG
26. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING TWO WEEKS PRIOR TO THE START OF CONSTRUCTION AND
SHALL APPRAISE AND COORDINATE DURING ALL PHASES OF CONSTRUCTION: KENT COUNTY ENGINEER
PLA DAVIS, BOWEN & FRIEDEL, INC. - (302) 424-1441
ISLA
MAN
C KER CITY OF DOVER/WATER & WASTEWATER - (302) 736-7025
LOO
FED TIVE
CITY OF DOVER/PLANNING AND INSPECTION - (302) 736-7010
CITY OF DOVER/ELECTRIC UTILITY - (302) 736-7070
ERA AVE BLV
D. KENT CONSERVATION DISTRICT - (302) 608-5370
JR.
L ST PARKING STRATEGY
. G
KIN
HER
S T. LUT
.
TH TIN
E. NO R MAR
SOILS MAP NECESSARY PARKING PROVIDED PARKING
1" = 400' UNIT TYPE REQUIREMENT NUMBER OF UNITS FLOOR AREA NUMBER OF SPACES
PARKING TYPE
1 BEDROOM APARTMENT 1 SPACE 17 17 COUNTY ENGINEER DATE
SOILS DATA
2 BEDROOM APARTMENT 2 SPACE 15 30
LABEL
HkB
SOIL NAME
Handbrook Urban Land Complex, 0 to 5 Percent Slopes
TYPE
B 3 BEDROOM APARTMENT 3 SPACE 4 12
PROPOSED ONSITE APARTMENTS 62
OWNER/DEVELOPER STATEMENT
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-TITLE.dwg Dec 03 , 2025 - 11:24am warc
STUDIO APARTMENT 1 SPACE 6 6 SHARED SPACES ON EXISTING
APARTMENTS AND I, THE UNDERSIGNED, HEREBY STATE THAT I AM THE OWNER OF THE PROPERTY Date:
EASEMENT WITH CITY OF 29 APRIL, 2025
BENCHMARK INFORMATION SUB-TOTAL: 65 SPACES RESTAURANT DESCRIBED AND SHOWN ON THIS PLAN, THE PLAN WAS MADE AT MY DIRECTION, I
DOVER ON ADJACENT PARCEL
ACKNOWLEDGE THE SAME TO BE MY ACT AND DESIRE THE PLAN BE RECORDED Scale:
BM# DESCRIPTION LOCATION ELEVATION PUBLIC SPACES (LIBRARY ACCORDING TO LAW. 1"=20'
LOT, INNOVATION WAY, RESTAURANT 180±
1 IRON ROD W/CAP N:422446.8983 E:626423.5746 15.08' (NAVD 88) 1 SPACE PER 4 SEATS/3 BAR Dwn.By:
RESTAURANT 4,560 S.F. 56 LOOCKERMAN PLAZA)
STOOLS RPK
SUB-TOTAL: 56 SPACES Proj.No.:
TOTAL: 271± SPACES 2916A039
TOTAL: 121 SPACES FRANK DIMONDI DATE
ADJACENT PROPERTY OWNERS OLD POST LLC.
91 BRENDA LANE SUITE A
1 2-05-07705-04-5500-00001 IO ZONING CITY OF DOVER 35 LOOCKERMAN ST., DOVER, DELAWARE 19901 CAMDEN, DE 19934
2 2-05-07705-04-5100-00001 IO ZONING STATE OF DELAWARE 89 KINGS HWY., DOVER DELAWARE 19901
3 2-05-07705-04-5200-00001 IO ZONING CENTRAL DOVER OFFICES, INC. 9 E LOOCKERMAN ST., DOVER, DELAWARE 19901
ENGINEER'S STATEMENT TITLE
4 2-05-07709-05-1300-00001 IO ZONING STATE OF DELAWARE 121 MARTIN L KING JR BLVD., DOVER, DELAWARE 19901 I, JAMIE L. SECHLER, P.E., HEREBY STATE THAT I AM A REGISTERED ENGINEER IN
THE STATE OF DELAWARE, THAT THE INFORMATION SHOWN HEREON HAS BEEN
5 2-05-07709-05-1200-00001 IO ZONING STATE OF DELAWARE 60 LOOCKERMAN ST., DOVER, DELAWARE 19901
PREPARED UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF
6 2-05-07709-05-1100-00001 IO ZONING STATE OF DELAWARE 401 FEDERAL ST., DOVER, DELAWARE 19901 REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE
APPLICABLE LAWS OF THE STATE OF DELAWARE.
Dwg.No.:
by JAMIE L. SECHLER, P.E.
DAVIS, BOWEN & FRIEDEL, INC.
1 PARK AVE.
MILFORD, DELAWARE, 19963
DATE
C-001
85
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2024
Page 86
Item 3.
MANMADE ROADSIDE FEATURES UTILITY FEATURES NATURAL FEATURES
RIGHT-OF-WAY FEATURES
CITY OF DOVER, KENT COUNTY, DELAWARE
DRAINAGE FEATURES
OLD DOVER POST
SURVEY CONTROL & MONUMENTATION
COMMERCIAL PROPERTY
PAVEMENT SECTIONS
IDENTIFIERS
MISCELLANEOUS FEATURES
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-TITLE.dwg Dec 03 , 2025 - 11:24am warc
Date:
APRIL, 2025
Scale:
1"=20'
Dwn.By:
RPK
Proj.No.:
2916A039
LEGEND
Dwg.No.:
C-002
86
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2024
Page 87
Item 3.
EX-SS
EX-SS
EX-SS
60' EXIST. R.O.W.
INNOVATION WY.
EX-SS
CITY OF DOVER, KENT COUNTY, DELAWARE
EX-SS
OLD DOVER POST
EX-SS
EXIST.
R.O.W.
VARIES
EX-SS
COMMERCIAL PROPERTY
EX-SS
.
KERM
AN ST
LOOC
EX-SS
EX-SS
EX-SS
EX-SS
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-EXISTING CONDITIONS.dwg Dec 03 , 2025 - 11:25am warc
Date:
NOVEMBER 2025
Scale:
1"=20'
Dwn.By:
CAW
Proj.No.:
2916A039
EXISTING
CONDITIONS
Dwg.No.:
0 20 40 60
C-101
87
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 88
Item 3.
SITE HATCH LEGEND:
SITE LEGEND:
A STOP SIGN (SEE DETAIL ON SHEET C-103)
EXISTING CONCRETE
B HANDICAP PARKING SPACE WITH SIGN (SEE DETAIL ON SHEET C-103)
EX-SS
C MODIFIED 1-6 CURB (SEE DETAIL ON SHEET C-103)
PROPOSED CONCRETE D DUMPSTER (SEE DETAIL ON SHEET C-103)
E PROPOSED SIDEWALK
F PROPOSED ADA RAMP (WITH RAILING TO MATCH PROPOSED 4' BLACK FENCE)
G PROPOSED 4' TALL BLACK ALUMINUM FENCE (SEE DETAIL ON SHEET C-103)
PROPOSED PAVEMENT SECTION
H PROPOSED GATE
EX-SS
I PROPOSED STEPS
J PROPOSED PATIO/BALCONY
K PROPOSED FLAG POLE
L PROPOSED LIGHT POLE (WITH COLONIAL STYLE LAMP HEAD)
M EXISTING LIGHT POLE
EX-SS
N PROPOSED PATIO
O PROPOSED BIKE RACK
P PROPOSED BENCH
60' EXIST. R.O.W.
Q PROPOSED YOGA STATION
INNOVATION WY.
5' SIDE
EX-SS SETBACK
Q
R1
6'
P M
CITY OF DOVER, KENT COUNTY, DELAWARE
F G
G G
A M M I
8SS 8SS 8SS 8SS
EX-SS
M G
25' I
A 2'
(VARIES) PROPOSED 5'
8' EAST ZEN GARDEN 2W
OLD DOVER POST
C 5'
8S H 2,424 S.F.
S 5' 6FW
J J J J J
' I
M
18' R5
B WALKING PATH J
S 8S
8FW
EX-SS
9' F K
18' 9'
N K
B
8SS K
8SS
ACK
PROPOSED
9' 4 STORY ETB EXIST.
M BUILDING R.O.W.
11 11 8FW ONT
ADDITION VARIES
B 43,092 S.F. S
EX-SS
14 F 0' FR
24' 18'
18' 8FW
M
COMMERCIAL PROPERTY
9' 9' 6
G 9' 5' 2'
R5 J J J J
EX-SS
'
9' PROPOSED
5' 12' WEST ZEN GARDEN .
KERM
P 1,646 S.F. P
I AN ST
20'
M 10'
(VARIES)
LOOC
8'
R C
EX-SS
24'
M 18' 18' J
9' R5
20' REAR 9' '
SETBACK D
24 5' SIDE J
SETBACK
EX-SS H G O
M M L L
G
EX-SS PE PE PE PE PE PE PE PE PE PE PE PE
EXISTING PARKING EASEMENT FROM CITY OF
DOVER FOR USE OF OLD DOVER POST (NOT
SUBJECT TO PARKING TIME RESTRICTIONS)
EX-SS
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-SITE PLAN.dwg Dec 03 , 2025 - 11:25am warc
Date:
NOVEMBER 2025
Scale:
1"=20'
Dwn.By:
CAW
Proj.No.:
2916A039
SITE PLAN
Dwg.No.:
0 20 40 60
C-102
88
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 89
Item 3.
5" 1" BATTER
NORMAL CURB
R1-1
DEPRESSED VARIES, REFER
3 21"
(36"x36") 1 1
2"
NOT LESS THAN 10'
R 1" CURB TO PLANS
SIGN DETAIL 1 1
3 14" TYPE C HOT MIX
18" "R2
2 21" (2 LIFTS, 141" & 2")
REFER TO PAVEMENT
SECTION
6" GABC
BOTTOM OF CURB SUB GRADE COMPACTED TO 95% OF
WHEN TREATED MODIFIED PROCTOR @ ±2% OPTIMUM
1'MIN 4" CR-1 BASE IS SPECIFIED. MOISTURE CONTENT OF ASTM D1557 SAWCUT 1 1/2" DEEP
COMPACTED SUBGRADE TO CONTROL JOINT
95% OF ASTM D-1557. 6"
NOTE:
WHEN ADJACENT TO CONCRETE PAVEMENT, PAVEMENT SECTION MATCH EXISTING DUMPSTER PAD SIZE
INSTALL APPROVED EXPANSION JOINT. (TRAVEL LANES) 4000 PSI CONCRETE WITH CONTROL JOINTS @ 15' MAX. SPACING
PROPOSED STRUCTURAL NUMBER = 2.14 2" CLEAR
MODIFIED P.C.C. CURB, TYPE 1 DETAIL
NOT TO SCALE
TYPICAL SIGN INSTALLATION
NOT TO SCALE 2" CLEAR
(2) LAYERS OF 6 x 6 - COMPACT SUBGRADE TO
W 2.1 x W 2.1 W.W.F. 95% OF ASTM D1557
CITY OF DOVER, KENT COUNTY, DELAWARE
HANDICAP SIGN (R7-8) & HANDICAP SIGN (R7-8) & DUMPSTER PAD DETAIL
HANDICAP SIGN (R7-8)
(USE THIS SIGN AT ALL VAN ACCESSIBLE SIGN (R7-8P) VAN ACCESSIBLE SIGN (R7-8P) NOT TO SCALE
HANDICAPPED PARKING (USE THIS COMBINATION OF SIGNS (USE THIS COMBINATION OF SIGNS
LOCATIONS) SIDEWALK THIS SIGN TYPICAL AT
AT LOCATIONS NOTED ON PLAN) AT LOCATIONS NOTED ON PLAN) R7-8
ALL ACCESSIBLE PARKING
SPACES
OLD DOVER POST
"U"-CHANNEL
POST (2-lbs./ft.)
9'-0" 9'-0" 9'-0"
5' MIN. FROM GRADE/7' MAX.
6" R
18"
6" 4" PIPE BOLLARD PAINTED
2'R
TRAFFIC YELLOW, FILLED
R W/ CONCRETE.
18'-0"
18 " 4"
15"
SLOPE TOP
OF CONCRETE
COMMERCIAL PROPERTY
GROUND/PAVING
3'-9" 9'-0" 3'-9" 9'-0" 3'-9"
SURFACE
9'-0" 9'-0" 9'-0" 3500 P.S.I.
P.C. CONCRETE
3"
2'-0"
4" WIDE BLUE IN COLOR,
ADJACENT PARKING SPACE PAINTED STRIPING TO BE BLUE IN PAINTED STRIPING TO BE BLUE IN
LINE COLOR, 4" WIDE, 24" ON CENTER AND COLOR, 4" WIDE, 24" ON CENTER AND
1'-6"
AT A 45° ANGLE AT A 45° ANGLE
HANDICAP PARKING DETAIL SIGNAGE FOR HANDICAPPED PARKING SPACE
NO TO SCALE NOT TO SCALE
8'-0" MAX.
POST SPACING
POLE
FLUSH COVERED HANDHOLE
24"SQUARE
6' TALL WHITE
PVC FENCING
BASE COVER
TERMINATE GROUND WIRES
CONFORM EDGE TO 72"
TO BONDING LUG ON POLE
SHAPE OF SIDEWALK
#10 CU. GROUND
IN 3/4" PVC SLEEVE 2"
2"-3"
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-SITE PLAN.dwg Dec 03 , 2025 - 11:25am warc
FINISHED GRADE DIRT
BACKFILL
Date:
NOVEMBER 2025
5/8"Ø x 8'-0" (4) ANCHOR RODS ENCASED
CU CLAD STEEL Scale:
IN ANCHOR BASE AS NOTED
GROUND ROD
72" Dwn.By:
30" #4 BARS ON 6" CTRS. WITH 2" CAW
#3 TIES ON 12" CTRS. SPACE Proj.No.:
2916A039
PVC CONDUITS ENCASED 36"
IN ANCHOR BASE
PVC CONDUIT WITH BRANCH 1'-8"
CIR. WIRING SEE DWG E1.1 SITE DETAILS
3" MIN 3" 3"
CONCRETE ANCHOR BASE
(3500 PSI)
4' TALL BLACK ALUMINUM FENCE DETAIL
NOT TO SCALE
(TYP.)
18"Ø DUMPSTER ENCLOSURE DETAIL
NOT TO SCALE
Dwg.No.:
LIGHT POLE BASE DETAIL
NOT TO SCALE C-103
89
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 90
Item 3.
EX-SS
EX-SS
EX-SS
60' EXIST. R.O.W.
INNOVATION WY.
5' SIDE
EX-SS
PROPOSED YOGA STATION
SETBACK
PROPOSED BENCHES
1-CC
3-ND
CITY OF DOVER, KENT COUNTY, DELAWARE
4-RH 2-QR 2-RH 2-QR 2-RH
3-ND
8SS 8SS 8SS 8SS
EX-SS
8-BN 1-MV
2W
OLD DOVER POST
8S
3-ND
S 6FW
1-QR 2-RH
2-RH 3-ND 1-QR 2-RH 3-ND 1-QR
1-CC
S 8S
PROPOSED EAST ZEN GARDEN
8FW
EX-SS
PROPOSED
FLAG POLE
8SS (TYP.)
8SS
PROPOSED
4 STORY EXIST.
BUILDING R.O.W.
8FW
ADDITION VARIES
43,092 S.F.
EX-SS
1-CC
30-TO PROPOSED WEST ZEN GARDEN
8FW
PROPOSED BENCHES PROPOSED BENCHES
COMMERCIAL PROPERTY
2-ND 3-ND
2-ND
3-RH 6-NT 2-RH 6-NT 3-RH
.
AN ST
EX-SS
LOOC
1-QR 1-QR 1-QR 1-QR 1-QR KERM
1-MV
EX-SS
1-MV
20' REAR
SETBACK
5' SIDE
SETBACK
EX-SS
1-CC
EX-SS
EX-SS
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-LANDSCAPE PLAN.dwg Dec 03 , 2025 - 11:26am warc
Date:
NOVEMBER 2025
Scale:
1"=20'
Dwn.By:
CAW
Proj.No.:
2916A039
LANDSCAPE
PLAN
Dwg.No.:
0 20 40 60
L-101
90
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 91
Item 3.
TREE PIT
STRAPS, TYP.
SITE DATA: GENERAL LANDSCAPE NOTES
1. DEVELOPER: OLD POST, LLC
859 GOLF LINKS LANE, SUITE 1 1. QUALITY AND SIZE OF PLANTS, SPREAD OF ROOTS, AND SIZE OF BALLS SHALL BE
TREE ROOT BALL IN ACCORDANCE WITH THE CURRENT STANDARDS OF THE AMERICAN
MAGNOLIA, DELAWARE 19962
ASSOCIATION OF NURSERYMEN "AMERICAN STANDARDS FOR NURSERY STOCK".
G. MICHEAL GLICK
PHONE: 302-677-1965
2. CONTRACTOR SHALL BE REQUIRED TO GUARANTEE ALL PLANT MATERIALS FOR A
EMAIL: MGLICK@LHCONSTRUCTION.COM PERIOD OF ONE YEAR AFTER INSTALLATION IS COMPLETE AND FINAL
ACCEPTANCE OF SITE WORK HAS BEEN GIVEN. AT THE END OF ONE YEAR ALL
2. DESIGN PROFESSIONAL: DAVIS, BOWEN & FRIEDEL, INC. PLANT MATERIAL WHICH IS DEAD OR DYING SHALL BE REPLACED AT THE
ALL DECIDUOUS SHADE TREES OVER 2" CALIPER 1 PARK AVENUE CONTRACTOR'S EXPENSE AS ORIGINALLY SPECIFIED.
AND ALL EVERGREEN TREES OVER 6' IN HEIGHT MILFORD, DELAWARE 19963
SHALL USE THREE STAKES FOR STABILIZATION. JAMIE L. SECHLER P.E. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UTILITIES AND MAY
PHONE: 302-424-1441 MAKE MINOR ADJUSTMENTS IN SPACING AND/OR LOCATION OF PLANT MATERIALS.
TREE PIT EMAIL: JLS@DBFINC.COM CONTRACTOR TO VERIFY "AS BUILT" LOCATION OF ALL UTILITIES.
TREE ROOT BALL 3. SITE AREA: 1.267 ACRES 4. NO SUBSTITUTIONS SHALL BE MADE WITHOUT APPROVAL OF THE OWNER.
STRAPS, TYP.
4. PROPERTY ADDRESS: 55 LOOCKERMAN PLAZA, DOVER, DE 19903 5. ALL AREAS NOT STABILIZED IN PAVING OR PLANT MATERIALS SHOULD BE SEEDED
AND MULCHED. (SEE EROSION & SEDIMENT CONTROL PLAN.)
5. ZONING: C2 MIXED USE COMMERCIAL & MULTIFAMILY.
6. ALL DECIDUOUS SHADE TREES SHALL BRANCH A MINIMUM OF 6'-0" ABOVE
6. NO EXISTING WETLANDS ON SITE. GROUND LEVEL. TREES SHALL BE PLANTED AND STAKED IN ACCORDANCE WITH
NOTE:
THE STAKING DETAIL SHOWN.
- WATER DEEPLY ONCE A WEEK
DURING THE FIRST TWO SUMMERS. STAKES TO BE 7. NO EXISTING WOODLANDS ON SITE.
7. THE FULL EXTENT OF ALL PLANTING BEDS SHALL RECEIVE 4" OF TOPSOIL AND 3"
APPLY A MINIMUM OF 5-10 LOCATED PARALLEL 0F BARK MULCH PER SPECIFICATIONS.
GALLONS OF WATER EACH WEEK. TO PAVEMENT
- CAREFULLY REMOVE CONTAINERS, PLAN 8. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN QUANTITIES
CITY OF DOVER, KENT COUNTY, DELAWARE
WRAPPINGS, WIRES AND TIES FROM SUFFICIENT TO COMPLETE THE PLANTINGS SHOWN ON THIS DRAWING AND AS
ROOT BALL BEFORE PLANTING. SPECIFIED.
- LOOSEN OUTSIDE ROOTS, AND
UNWRAP ANY CIRCLING ROOTS 9. ALL PLANTS SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AS THE
- SECURE STAKES WITH WIDE PLANT'S ORIGINAL GRADE BEFORE DIGGING.
WEBBING STRAPS OR CHAINLOCK
TIES. ALLOW FOR TREE MOVEMENT. 10. THE CONTRACTOR SHALL WATER ALL PLANTS THOROUGHLY TWICE DURING THE
- DO NOT HEAVILY PRUNE THE TREE AT DECIDUOUS TREE
FIRST 24-HOUR PERIOD AFTER PLANTING, AND THEN WEEKLY OR MORE OFTEN, IF
OLD DOVER POST
PLANTING. DO NOT REMOVE THE NECESSARY, DURING THE FIRST GROWING SEASON.
TERMINAL BUDS OF BRANCHES THAT EVERGREEN TREE
EXTEND TO THE EDGE OF THE CROWN. IF 11. AREAS WITHIN THE DRIP LINE OF EXISTING TREES ARE NOT TO BE DISTURBED
NECESSARY, PRUNE ONLY CROSSOVER REMOVE ANY TWINE, DURING THE CONSTRUCTION PROCESS.
LIMBS, CO-DOMINANT LEADERS AND TAPE OR TAGS
BROKEN OR DEAD BRANCHES.
2"x2" STAKES
NOTCH STAKES TO
4"-6" HOLD STRAPS IN PLACE
EVERGREENS 4'- 6' HT.,
STAKE 2'- 3' ABOVE GROUND
SET BASE OF TRUNK AT OR
DECIDUOUS TREES & JUST ABOVE FINAL GRADE
EVERGREENS 6'- 8' HT.,
STAKE 3'- 4' ABOVE GROUND
APPLY 3-4" LAYER OF DOUBLE
SHREDDED HARDWOOD
MULCH. KEEP 2-3" FROM TREE
DECIDUOUS TREES &
EVERGREENS 8'- 10' HT.,
STAKE 4'- 5' ABOVE GROUND
TRUNK.
FINISHED GRADE
LANDSCAPE PLANT SCHEDULE
TREE BACKFILL WITH EXISTING SOIL SYMBOL NATIVE KEY BOTANICAL NAME COMMON NAME SIZE QUANTITY
ROOT FROM THE HOLE. TAMP LIGHTLY AS
COMMERCIAL PROPERTY
4-6" TALL SOIL BERM BALL THE HOLE IS FILLED. DECIDUOUS TREE - CANOPY
DIG A HOLE AT 4"-6" MIN.
LEAST TWO TIMES
THE ROOTBALL 6"-8"
ü MV MAGNOLIA VIRGINIANA SWEETBAY MAGNOLIA 1 3/4" - 2" Cal., B&B 3
DIAMETER. SCARIFY DIAMETER
SIDES OF TREE PIT. ROOT BALL SET ROOT BALL ON UNDISTURBED
SOIL TO PREVENT SETTLING
ü CC CERCIS canadensis EASTERN REDBUD 1 1/2"- 2" Cal., B&B 4
TREE PLANTING DETAIL QR QUERCUS robur 'FASTIGIATA' COLUMNAR OAK 1 1/2"-2" Cal., B&B 12
NOT TO SCALE
TOTAL 19
EVERGREEN TREE-CANOPY
TO THUJA occidentalis 'SMARAGD' EMERALD GREEN ARBORVITAE 5-6'HT., B&B 30
TOTAL 30
EVERGREEN SHRUBS
ND NANDINA domestica 'LEMON-LIME' 'LEMON-LIME' NANDINA 24"-36' 22
BN BUXUS NEWGEN FREEDOM NEWGEN FREEDOM BOXWOOD 24"-36"., B&B 8
RH RHODODENDRON hybrid 'CONLES AUTUMN EMPRES 24"-36" B&B 22
TOTAL 52
GRASSES
NT NASSELLA tenuisima MEXICANA FEATHER GRASS #1 CONT., 18" O.C. 12
TOTAL 12
P:\lighthouse\2916a039 old dover post\DESIGN\2916A039-LANDSCAPE PLAN.dwg Dec 03 , 2025 - 11:26am warc
LANDSCAPE ARCHITECT'S STATEMENT
I, TIMOTHY M. METZNER, HEREBY STATE THAT I AM A REGISTERED LANDSCAPE ARCHITECT IN THE
STATE OF DELAWARE, THAT THE INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY
SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF REPRESENTS GOOD ARCHITECTURAL Date:
PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE. NOVEMBER 2025
Scale:
AS NOTED
____________________________________________________ Dwn.By:
SIGNATURE DATE CAW
REGISTERED LANDSCAPE ARCHITECT: TIMOTHY M. METZNER, RLA Proj.No.:
DAVIS, BOWEN & FRIEDEL, INC. 2916A039
1 PARK AVENUE
MILFORD, DELAWARE 19963
LANDSCAPE
DETAILS
Dwg.No.:
L-102
91
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2025
Page 103
Item 3.
Moonlight
Architecture, Inc.
Architecture Interior Design
Site Planning
DE (302) 645-9361
MD (410) 677-4747
www.moonlightarch.com
All designs, concepts, ideas and arrangements depicted on these
drawings are the property of Moonlight Architecture, Inc. and are
intended to be used in connection with this specific project only and
shall not be used in whole or in part for any other purpose whatsoever
without the written consent of Moonlight Architecture, Inc.. No
changes or deviations shall be allowed without the written consent of
M o o n l i g h t A r c h i t e c t u r e , I n c .
CONSTRUCTION DOCUMENTS FOR THE:
OLD DOVER POST
RENOVATIONS
PROJECT ADDRESS
DOVER, KENT COUNTY
DELAWARE
REVISIONS:
SCALE:
1/8" = 1'-0"
DRAWING DATE:
10/09/2025
SHEET TITLE:
SCHEMATIC FIRST FLOOR
PLAN
C COPYRIGHT 2025 MOONLIGHT ARCHITECTURE, INC.
PROJECT NUMBER:
25059
A1 SCHEMATIC FIRST FLOOR PLAN SHEET #:
1/8" = 1'-0" KEY SD101 103
Page 104
Item 3.
Moonlight
Architecture, Inc.
Architecture Interior Design
Site Planning
DE (302) 645-9361
MD (410) 677-4747
www.moonlightarch.com
All designs, concepts, ideas and arrangements depicted on these
drawings are the property of Moonlight Architecture, Inc. and are
intended to be used in connection with this specific project only and
shall not be used in whole or in part for any other purpose whatsoever
without the written consent of Moonlight Architecture, Inc.. No
changes or deviations shall be allowed without the written consent of
M o o n l i g h t A r c h i t e c t u r e , I n c .
CONSTRUCTION DOCUMENTS FOR THE:
OLD DOVER POST
RENOVATIONS
PROJECT ADDRESS
DOVER, KENT COUNTY
DELAWARE
REVISIONS:
SCALE:
1/8" = 1'-0"
DRAWING DATE:
10/09/2025
SHEET TITLE:
SCHEMATIC SECOND FLOOR
PLAN - OPT. A
C COPYRIGHT 2025 MOONLIGHT ARCHITECTURE, INC.
PROJECT NUMBER:
25059
A1 SCHEMATIC SECOND FLOOR PLAN SHEET #:
1/8" = 1'-0" KEY SD102 104
Page 105
Item 3.
Moonlight
Architecture, Inc.
Architecture Interior Design
Site Planning
DE (302) 645-9361
MD (410) 677-4747
www.moonlightarch.com
All designs, concepts, ideas and arrangements depicted on these
drawings are the property of Moonlight Architecture, Inc. and are
intended to be used in connection with this specific project only and
shall not be used in whole or in part for any other purpose whatsoever
without the written consent of Moonlight Architecture, Inc.. No
changes or deviations shall be allowed without the written consent of
M o o n l i g h t A r c h i t e c t u r e , I n c .
CONSTRUCTION DOCUMENTS FOR THE:
OLD DOVER POST
RENOVATIONS
PROJECT ADDRESS
DOVER, KENT COUNTY
DELAWARE
A2 SCHEMATIC FOURTH FLOOR PLAN
1/8" = 1'-0" KEY
REVISIONS:
SCALE:
1/8" = 1'-0"
DRAWING DATE:
10/09/2025
SHEET TITLE:
SCHEMATIC THIRD AND
FOURTH FLOOR PLANS
C COPYRIGHT 2025 MOONLIGHT ARCHITECTURE, INC.
PROJECT NUMBER:
25059
A1 SCHEMATIC THIRD FLOOR PLAN SHEET #:
1/8" = 1'-0" KEY SD103 105
Page 106
Item 3.
Moonlight
Architecture, Inc.
Architecture Interior Design
Site Planning
DE (302) 645-9361
MD (410) 677-4747
www.moonlightarch.com
All designs, concepts, ideas and arrangements depicted on these
drawings are the property of Moonlight Architecture, Inc. and are
intended to be used in connection with this specific project only and
shall not be used in whole or in part for any other purpose whatsoever
without the written consent of Moonlight Architecture, Inc.. No
changes or deviations shall be allowed without the written consent of
M o o n l i g h t A r c h i t e c t u r e , I n c .
CONSTRUCTION DOCUMENTS FOR THE:
OLD DOVER POST
RENOVATIONS
PROJECT ADDRESS
DOVER, KENT COUNTY
DELAWARE
REVISIONS:
SCALE:
1/8" = 1'-0"
DRAWING DATE:
10/09/2025
SHEET TITLE:
SCHEMATIC EXTERIOR
ELEVATION
C COPYRIGHT 2025 MOONLIGHT ARCHITECTURE, INC.
PROJECT NUMBER:
25059
A1 SCHEMATIC EXTERIOR ELEVATIONS SHEET #:
1/8" = 1'-0" KEY SD104 106
Page 107
Item 3.
Moonlight
Architecture, Inc.
Architecture Interior Design
Site Planning
DE (302) 645-9361
MD (410) 677-4747
www.moonlightarch.com
All designs, concepts, ideas and arrangements depicted on these
drawings are the property of Moonlight Architecture, Inc. and are
intended to be used in connection with this specific project only and
shall not be used in whole or in part for any other purpose whatsoever
without the written consent of Moonlight Architecture, Inc.. No
changes or deviations shall be allowed without the written consent of
M o o n l i g h t A r c h i t e c t u r e , I n c .
CONSTRUCTION DOCUMENTS FOR THE:
OLD DOVER POST
RENOVATIONS
PROJECT ADDRESS
DOVER, KENT COUNTY
DELAWARE
REVISIONS:
SCALE:
1/8" = 1'-0"
DRAWING DATE:
10/09/2025
SHEET TITLE:
SCHEMATIC EXTERIOR
ELEVATION
C COPYRIGHT 2025 MOONLIGHT ARCHITECTURE, INC.
PROJECT NUMBER:
25059
A1 SCHEMATIC EXTERIOR ELEVATIONS SHEET #:
1/8" = 1'-0" KEY SD105 107