CITY OF DOVER, DELAWARE
COUNCIL COMMITTEE OF THE WHOLE MEETING
Tuesday, October 13, 2026 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
THIS AGENDA HAS BEEN REVISED BY REMOVING PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE MEETING ITEM #1 – DOVER PARK
CONSTRUCTION ALTERNATIVE STRATEGY
Public comments are welcomed on any item and will be permitted at the appropriate time. When possible,
please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be
recognized.
VIRTUAL MEETING NOTICE
This meeting will be held in City Hall Council Chambers with electronic access via
WebEx. Public participation information is as follows:
Dial: 1-650-479-3208
Link: https://shorturl.at/rHOjb
Event number: 2537 601 0738
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting
starts.
CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER
ADOPTION OF AGENDA
COUNCIL REPORTS - SEPTEMBER 2026
1. First District
2. Second District
3. Third District
4. Fourth District
5. At-Large
1
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING - October 13, 2026 PAGE 2
6. Council President Neil
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
ADOPTION OF THE AGENDA
1. Consideration of Withdrawal and Reallocation of CDBG Funds for People's Community
Center Renovation Project (Debbie O'Brien, Community Development Manager)
(Staff Recommendation: Approve the withdrawal of the previously approved $40,000 CDBG
allocation for the People's Community Center Renovation Project and direct staff to make the
funds available through the 2027 Annual Action Plan Process.)
ADJOURNMENT OF THE PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
ADOPTION OF THE AGENDA
1. Proposed Ordinance #2026-15 - Amending Chapter 42 - Environment – By Adding Sec.42-
3 Lighting (Eddie Kopp, Code Enforcement Supervisor)
(Staff Recommendation: Forward Proposed Ordinance #2026-15 to Council for approval.)
2. Budget Amendment Discussion (Sharon Duca, City Manager)
(Committee Action Not Required)
3. Alderman's Court Ad Hoc Committee Update (Councilman Anderson)
(Committee Action Not Required)
ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
2
Page 3
Item 1.
ACTION FORM
PROCEEDING: Council Committee of The Whole (Parks, Recreation, and Community Enhancement)
DEPARTMENT OF ORIGIN: Planning, Inspections & Community Development
DATE SUBMITTED: 10/2/26
PREPARED BY: Debbie O’Brien, Community Development Manager
SUBJECT: Consideration of Withdrawal and Reallocation of CDBG Funds for People's Community Center
Renovation Project
REFERENCE: N/A
RELATED PROJECT: N/A
REVIEWED BY: Sharon J. Duca, P.E., ICMA-CM, City Manager and Patricia Marney, Controller/ Treasurer
EXHIBITS: Exhibit A – Project Timeline
Exhibit B - 10-13-26 Community Development Packet Material
EXPENDITURE REQUIRED: There is no impact on the City's CDBG entitlement funding.
AMOUNT BUDGETED: $40,000
FUNDING SOURCE (Dept./Page in CIP & Budget): 2025 CDBG Entitlement Grant
TIMETABLE: Pending Council approval, staff will take the necessary administrative and contractual actions
to discontinue the project, discontinue the environmental review process without submitting the Request for
Release of Funds (RROF) to HUD. Staff will follow the amendment procedures established in the City's
Citizen Participation Plan.
RECOMMENDED ACTION: Staff recommends that City Council withdraw the previously approved
$40,000 CDBG allocation for the People's Community Center Renovation Project and direct staff to make the
funds available for consideration through the 2027 Annual Action Plan process.
BACKGROUND AND ANALYSIS
In the 2025–2029 Consolidated Plan and 2025 Annual Action Plan, the City of Dover allocated $40,000 in U.S.
Department of Housing and Urban Development (HUD) Community Development Block Grant (CDBG) funds
to People's Community Center, with the allocation unanimously approved by City Council through the Consent
Agenda on April 28, 2025. The funding was intended to renovate a portion of the homeless shelter to create
private and group meeting space for case management and supportive services for individuals experiencing
homelessness. During the environmental review process, staff determined that a Phase I Environmental Site
Assessment was necessary to evaluate potential environmental contamination in accordance with 24 CFR
58.5(i)(2). Upon completion of the Environmental Review Record (ERR), HUD regulations require publication
of a Notice of Intent to Request Release of Funds (NOI/RROF) and an opportunity for public comment before
submitting the RROF to HUD, consistent with 24 CFR 58.43 and the City's Citizen Participation Plan (CPP).
Comments received during the public comment period prompted additional staff review, which identified
several programmatic, procurement, contractual, compliance, and project implementation concerns that call into
question the project's feasibility and ability to achieve its intended CDBG objectives. Staff subsequently
consulted with HUD and the City Solicitor regarding available options. HUD confirmed that the decision to
proceed with or discontinue a CDBG-funded activity is a local decision and that, because the RROF has not
been submitted, the City may discontinue the environmental review process if it elects not to proceed. Any
reallocation of the funds would be subject to the amendment procedures established in the City's CPP.
3
Page 4
Item 1.
Exhibit A – Project Timeline
People's Community Center (PCC) – CDBG Renovation Project
Date Event
City Council approved the 2025 Annual Action Plan, including a $40,000
4/28/2025 CDBG allocation to PCC for renovations to create private and group meeting
space for case management and supportive services.
9/17/2025 Staff initiated the Environmental Review Record (ERR) for the project.
9/24/2025 Sub-recipient agreement was fully executed.
Staff notified the sub-recipient of the City's procurement requirements,
10/7/2025 including the requirement to obtain at least 3 price quotations for purchases
exceeding $10,000.
During the environmental review, staff notified the sub-recipient that a Phase
11/4/2025 I Environmental Site Assessment was necessary due to the age, location, and
proposed use of the property.
The Phase I Environmental Site Assessment was completed, allowing the
1/27/2026
environmental review process to proceed.
PCC submitted an invoice and proof of payment for reimbursement.
Although an explanation was provided regarding the solicitation of only two
6/11/2026 contractor quotations, the procurement documentation provided appeared
incomplete, and the additional quotation requested by staff was not
provided.
The first Notice of Intent to Request Release of Funds (NOI/RROF) was
6/12/2026
published with an erroneous public comment date.
The corrected Notice of Intent to Request Release of Funds (NOI/RROF) was
6/23/2026
published, initiating the required public comment period
In response to issues identified during the public comment period, staff
conducted a comprehensive review of the project and supporting
6/23-30/2026 documentation. The review identified concerns regarding project feasibility,
prior funding history, procurement documentation, contractual provisions,
and the project's ability to achieve its intended CDBG national objective
Page 1 of 2
4
Page 5
Item 1.
Exhibit A – Project Timeline
People's Community Center (PCC) – CDBG Renovation Project
Date Event
within a reasonable timeframe. Staff subsequently consulted with HUD and
the City Solicitor regarding available options.
HUD confirmed that the decision whether to continue or discontinue the
project is a local decision and advised that any decision should be based on
6/30/2026
programmatic, contractual, compliance, procurement, and implementation
considerations.
6/30/2026 The sub-recipient agreement expired and was not extended.
Page 2 of 2
5
Page 6
Exhibit B - 10/13/26 Community Development Packet Material Item 1.
Staff Recommendation Packet - $40,000 Allocation for the People's Community
Center 2025 CDBG Renovations Project
Table of Contents
Pages Document Purpose
Summary of recommendation and
1–3 Staff Presentation
five areas of concern
Detailed examples supporting
4–11 Basis for Staff's Recommendation
recommendation
Summary of City agreements and
12 City Grant/Funding History
balances
ARPA Round 1 Application/Reimbursement Prior renovation scope, timetable
13–16
Documentation and supporting documentation
17–67 ARPA 2 GKCC and Related Documentation Prior funding and contractual history
Application review and staff
68–75 2025 CDBG Correspondence/Application
requests
Documents, requests and
76–121 Renovations Agreement/Reimbursements
clarifications
122– Operations Documents, requests and
146 Correspondence/Reimbursements clarifications
147- Proposed workforce development
Economic Development Funding
149 funding
150–
2026 CDBG Application/Correspondence Application and concerns
161
162-
Miscellaneous communications
164
6
Page 7
September 29 Statement Item 1.
Good evening. My name is Debbie O’Brien, and I’m the Community Development
Manager. One of my responsibilities is to administer the Community
Development Block Grant funding that the City receives from HUD annually.
I’m here tonight to present the facts that have influenced my recommendation to
withdraw this funding and to explain why, based on the information gathered
through my review, I believe this is the prudent course of action.
I want to emphasize that this recommendation was not made lightly. My
responsibility is not only to help the City use its CDBG resources to address
community needs, but also to protect the City’s ability to continue receiving
those federal funds. When the City accepts CDBG funding, it also accepts
responsibility for ensuring that those funds are administered in accordance with
federal requirements. Failure to do so can expose the City to corrective action,
repayment of funds, and, in more serious circumstances, it can jeopardize
future CDBG funding.
When the Environmental Review process entered its comment period with the
Notice of Intent to Request Release of Funds, I did so in good faith and with the
expectation that the project would continue through the normal CDBG process.
However, the public comments received during that process raised concerns
that warranted a closer look at the overall feasibility of the project.
In response, I conducted additional research and reviewed the project more
broadly; not simply from an environmental standpoint, but also in terms of its
documentation, procurement, contractual obligations, project readiness, and
compliance with CDBG requirements.
What I found led me to believe that Council should have the opportunity to
consider these facts before the City proceeds with the request for release of
funds.
In reaching this recommendation, I focused on five fundamental questions:
7
Page 8
Item 1.
1. Programmatic: Is the project capable of achieving its CDBG objective
within a reasonable timeframe? Multiple funding sources have been
identified for renovation of this space over several years, while the proposed
renovation has not been completed. This history, together with the absence of
a clearly demonstrated timeline for completion and operation of the
proposed program, led me to question whether the project is sufficiently
defined and whether the organization has the resources necessary to
complete it and achieve the intended CDBG objective.
2. Procurement: Has the organization demonstrated adherence to
procurement standards? The review identified recurring deficiencies in
procurement and supporting documentation. Despite repeated reminders
regarding the City’s requirement to obtain at least three quotations for
purchases exceeding $10,000, and to follow the City’s purchasing policy,
those deficiencies remained unresolved.
3. Contractual: Has the organization fulfilled its contractual obligations?
The review identified multiple instances in which the subrecipient did not
demonstrate adherence to obligations established in the executed
agreement. Based on these unresolved contractual performance and
documentation concerns, I determined that extending the agreement was not
warranted.
4. Compliance: Can the City reasonably assure that the project can be
implemented in compliance with applicable Federal Guidelines? For
purposes of this review, compliance includes not only meeting individual
program requirements, but also the City’s ability to provide appropriate
oversight and assurance that those requirements will continue to be met
throughout the life of the project. The expanded review identified concerns
regarding the integrity of past performance, including an instance that
conveyed the appearance of impropriety. The organization’s ability to
demonstrate achievement of the intended CDBG national objective through
reliable, measurable methods is also a concern. Adequate procedures and
documentation have not been demonstrated for identifying eligible
8
Page 9
Item 1.
beneficiaries, verifying eligibility, and measuring outcomes necessary to
establish compliance with the applicable national objective.
5. Implementation: Is there a defined and reliable path to completion and
provision of services? Based on the programmatic, procurement,
contractual, and compliance concerns identified, I do not have sufficient
assurance that the project can be successfully implemented, or that the
proposed workforce development program can be sustained. The project has
not progressed to implementation within the established performance period;
required reporting and supporting documentation remain outstanding;
procurement and contractual obligations have not been consistently
demonstrated; and the project has relied on multiple potential funding
sources without a clearly demonstrated, sustainable funding plan. Recent
reductions in Grant-in-Aid funding, along with the denial of Economic
Development grant funding, also raise additional concerns regarding the
sustainability of the proposed program. Collectively, these factors indicate
that there is not currently a sufficiently defined or reliable path to completion
of the renovation and provision of the proposed services.
My responsibility is to ensure that the City’s federal funds are used for eligible
activities, supported by adequate documentation, and administered in
accordance with the requirements that come with accepting those funds. For
the reasons I’ve outlined tonight, I recommend that the current CDBG allocation
to this project be withdrawn.
I’m happy to answer any questions you may have.
9
Page 10
Item 1.
MEMORANDUM
COMMUNITY DEVELOPMENT OFFICE
Department of Planning & Inspections
15 Loockerman Plaza
Dover, DE 19901
Phone: (302) 736-7175 • Fax (302) 736-4217
TO: Administrative File for the 2025 CDBG People’s Community Center Renovations
Project
FROM: Debbie O’Brien, Community Development Manager
DATE: October 2, 2026
RE: Basis for Staff's Recommendation
________________________________________________________________________________________
EXAMPLES OF IDENTIFIED ISSUES
1) Programmatic:
a) Multiple Funding Sources and Claims
i) The organization was previously awarded $40,000 in ARPA
funding for the same or substantially similar renovation project,
described as renovation of a bowling alley to provide space for
case management and counseling.
ii) According to the ARPA application, the members were to
contribute matching funds of $152,978. Documentation does not
show matching disbursements.
iii) The 2025 CDBG application identified the Church endowment as
the source for matching funds. In a subsequent conversation, Dr.
Hodge indicated that the endowment would have to be used to
complete the project if sufficient grant funding was not received
and acknowledged that this would not be sustainable long-term,
since the revenues from the endowment were funding its
operations.
10
Page 11
Item 1.
Basis for Staff’s Recommendation
2
iv) At the Leg and Fin Committee meeting of February 26, 2026, Dr.
Hodge mentioned that they had “received money from a private
foundation to completely renovate a space that would be
segregated, for these different groups” [NeighborGood Partners,
DOL, and Polytech] to hold workshops and case management.
No additional information was provided regarding money from a
private foundation.
v) In an email on April 6, 2026, Dr. Hodge stated that the Governor’s
office had “funded a renovation project in the basement of
People’s Church, in order to convert one large space into private
offices and a conference room, for training and case
management.” I called the Governor’s office, and they had no
knowledge of this funding commitment. They did, however,
suggest that he may have been referring to the Grant-in-Aid bill
which the Governor signed in July, appropriating $55,000 to
People’s Community Center. In my research, I found that the
$55,000 was to support the Center for Children and Youth, as
opposed to a renovations project.
vi) The 2026 CDBG application identified Grant-in-Aid funding as the
source of matching funds. This was not funded as planned.
vii) The 2025 CDBG grant was declared as the source of funding for
some of the building renovations, yet no permits nor invoices
were produced for any work.
viii) Additionally, the $40,000 request was unclear. In one
paragraph, it was to be used to continue renovations, and in the
next paragraph, it would be used to replace the HVAC, which was
just replaced in April 2022 with ARPA funds. The application went
on to say that this $40,000 was only 5% of the total cost of the
project, with the remaining $760,000 to be provided by other
sources. Even if the full award was granted, I felt that there
should be more transparency about the estimated costs and
other funding sources. The bid from Delmarva Veteran Builders
was not attached, as indicated.
11
Page 12
Item 1.
Basis for Staff’s Recommendation
3
ix) The application for funding from the Delaware Opioid Settlement
Commission states that $350,000 is needed “to renovate and
equip a community-based workforce development and support
center for individuals experiencing substance use disorders,
homelessness, trauma, and economic instability.” While this
funding has yet to be released, Dr. Hodge is still (according to his
statement on September 29, 2026) relying on it to finish the
renovations and support operations.
b) Reasonable timeframe
i) The ARPA application anticipated completion by September 2022;
the project was not started nor completed.
ii) The 2025 CDBG agreement had a performance deadline of June
30, 2026. The application stated that “the work would take no
longer than 3 months.”
iii) The environmental review and mitigation process pushed the
anticipated start date to January 15, 2026. The contractor quote
was signed on May 12, 2026, but no permit application had been
received by the City as of June 30, 2026 - 9 months later.
c) Organizational Capacity and Reporting
i) I requested monthly program updates on February 5, 2026, as
required by the agreement. No response or reports were ever
received.
ii) The 2026 CDBG application was received on February 17, 2026 -
more than 2 weeks after the January 30 deadline and contained
inconsistencies and missing attachments. On February 20, 2026,
I requested corrections, but no response was received.
iii) In the February 20, 2026 email, I requested information regarding
the organization's methodology for documenting low- and
moderate-income beneficiaries. The organization had mentioned
in its application that program data was collected through Charity
Tracker; however, no reports have been submitted and no
response was received.
12
Page 13
Item 1.
Basis for Staff’s Recommendation
4
iv) August 13, 2026 - I requested the closeout report for the shelter
operations project, noting that I needed the information by
September 9th. Dr. Hodge responded that he would get to it as
soon as he could, but no report has been received. Annual
reporting to HUD is currently missing this information.
2) Procurement:
a) In emails on October 7, 2025 and May 27, 2026 - I reinforced the
requirement to obtain three quotations for purchases exceeding
$10,000.
b) Emails on May 27 and June 10, 2026 - I reinforced the requirement to
follow the City's purchasing policy.
c) A January 30, 2026 reimbursement request was missing two of three
invoices, and the invoice that was submitted had not yet been paid. I
requested the invoice copies and proof of payment on February 2.
No response was received.
d) A separate January 30 reimbursement request for $8,528.89 in ARPA
Round 2 (Greater Kent County Coalition funding) expenses included
a typed list of Amazon charges without sufficient detail or proof of
payment. This request was subsequently replaced with the staff
payroll reimbursement request sent on 6/11/26.
e) The April 9 (renovations) reimbursement request was still missing
the two previously requested invoices and included expenses
outside the scope of the agreement, including a dishwasher/soap
expense of $6,173 and shower repairs of $14,000. This request was
later replaced with the request for reimbursement of the MFI
contract on 6/11/26.
f) In the April 10 (operations) request, receipts were for Workforce
Development activities instead of shelter operations. I responded to
both requests on April 28th to explain that neither invoice could be
paid as presented, reiterating my February 6th email about required
documentation
13
Page 14
Item 1.
Basis for Staff’s Recommendation
5
g) On June 5, 2026, I sent an email to Dr. Hodge reminding him of the
upcoming expiration date for both of the CDBG agreements. He
responded that he would be submitting invoices by June 9th.
h) The June 10, 2026 CDBG Renovations invoice offered no explanation
for the lack of quotes. I responded asking if he had done the RFP or
sealed bid process. In a subsequent phone conversation, I
suggested he document their reasons for not at least getting 3
quotes.
i) The June 11, 2026 reimbursement request explained the selection
process. I requested the additional quotation on June 11, 2026, but
no response was received. The quotation/agreement submitted was
incomplete, with the even-numbered pages missing.
j) In addition to the lack of quotes and the missing pages, the executed
contractor agreement specified a $52,004.04 deposit to be paid
upon execution, but the proof of payment submitted was
$44,504.04, with no explanation provided for the $7,500 shortage.
k) On June 12, 2026, the CDBG Operations invoice requested
reimbursement for 94 pages of Amazon receipts (178 total), a 5-page
list of charges (some of which were out of order, resulting in a more
cumbersome reconciliation process), and 14 pages of bank
transactions. Upon reconciling, I notified Dr. Hodge that some of the
charges were incurred after the March 31st closure. We went back
and forth for 3 more rounds adding and amending exterminator
receipts, some of which were also outside of the allowable date
range and required extensive reconciliation on my part.
3) Contractual:
a) The agreement required the subrecipient to administer the project in
a manner satisfactory to the City and consistent with applicable
standards.
b) The agreement required submission of monthly progress reports;
none were received despite my requests on 2/5/26 and 8/13/26.
14
Page 15
Item 1.
Basis for Staff’s Recommendation
6
c) The agreement provides that substandard performance, as
determined by the Grantee, constitutes non-compliance. If action to
correct such substandard performance is not taken by the
subrecipient within a reasonable time…contract suspension or
termination procedures will be initiated.
d) The performance period ended June 30, 2026, and no permit
applications for the project had been received by the City prior to
expiration.
e) The agreement required compliance with applicable federal, state,
and local laws, regulations, and policies. The subrecipient did not
demonstrate compliance with the requirements of either the City's
purchasing policy or Uniform Guidance (2 CFR Part 200).
4) Compliance:
a) According to documentation submitted for reimbursement, work
that was done with ARPA funds back in 2022 required a building
permit, an HVAC permit, and a plumbing permit; no permits were
applied for or issued. If permits had been issued, the need for
Historic District Commission approval would have been revealed. In
addition, at least 2 of the contractors did not have a City of Dover
business license.
b) Reimbursement documentation reflected expenditures for
renovations to the kitchen, bathrooms, flooring, dining room, entry
doors, HVAC, and fire suppression system, rather than the proposed
renovation described in the ARPA application, including smoke
detectors throughout the building.
c) ARPA Round 2 spending (the Greater Kent County Coalition funds
that were reallocated) was over-budget, even though we amended
the agreement to allow for beds & lockers to be purchased.
d) In the application for the Economic Development Fund, the
organization listed CDBG as one of the sources of funding ($22,700)
for the Workforce Development Program. The actual purpose for this
CDBG funding was for operation costs of the homeless shelter.
15
Page 16
Item 1.
Basis for Staff’s Recommendation
7
e) At the same meeting, Councilman Dr. Sudler mentioned
“discrepancies” that need to be cleaned up first, which were denied
by Dr. Hodge in his response.
f) On March 23, 2026, the City Solicitor sent a letter requiring overnight
sheltering to stop operating until conditional use approval has been
obtained.
g) On March 26, 2026, the City Solicitor sent a 14-day notice to apply
for conditional use. Compliance is still unresolved.
h) An email from Dr. Hodge on April 6, 2026 stated that the overnight
shelter program ceased operations on April 1, 2026, and that
enforcement actions would not be necessary.
i) On April 28, 2026, the City issued a press release to address the
misinformation that was being spread that the City had shut down all
operations, as opposed to just the overnight sheltering.
j) The press release went on to clarify that the application for
Economic Development funding was denied because it didn’t meet
the City’s sustainability standards, as well as having overall
deficiencies in content.
k) I became aware of ongoing intentional disobedience of the directive
to cease overnight sheltering as recently as June 2026. Complaints
of bed bugs continued to be received from homeless people who
had been sleeping there.
l) In addition, Dr. Hodge sent an email to a City employee accidentally.
In the email, he instructed shelter staff to hide evidence and put
people in hotels prior to a scheduled inspection.
m) On multiple occasions, invoices submitted did not align with
approved and agreed upon specified activities, contrary to the
claims that they did.
5) Implementation:
a) Multiple funding sources (and claims of funding sources) have not
resulted in completion of renovations and subsequent program
launch.
16
Page 17
Item 1.
Basis for Staff’s Recommendation
8
b) Unrelated, but noteworthy, in the most recent Grant In Aid Funding
Bill, the Joint Finance Committee cut funding for the organization
(which had been increasing every year since 2022) and placed an
unprecedented requirement on this organization. SB337 - Section
26 states: “Section 2 of this Act appropriates $55,000 for the
People’s Community Center. It is the intent of the General Assembly
that this funding be used for the purposes of supporting the
programming provided by its Center for Children and Youth. The
People’s Community Center shall submit to the Co-Chairs of the
Joint Finance Committee through the Office of the Controller
General a quarterly report of the program's progress, which shall
include the number of children served and a report of all
expenditures related to the program that used Grant-in-Aid funds.”
c) Opioid Settlement funds earmarked for
17
Page 18
People's Community Center
Agreements with City of Dover as of 10/5/2026 Item 1.
Beginning
Project # Start Date End Date Project Description Paid Current Balance Activity / Scope of Service
Balance
Renovations of areas in an existing church
1 4/27/2022 7/23/2024 ARPA Round 1 Peoples Church 153,978.00 153,978.00 - that will be utilized as a shelter for the
homeless
Support staff to meet the needs of the shelter,
2 5/26/2023 12/31/2024 ARPA Round 2 Peoples Church 63,288.00 63,288.00 - maintenance and utility cost for shelter
operations, and the purchase of meals
5/9/25 Staffing for social and prevention services for
at risk persons, emergency shelter, beds and
3 amended Ongoing ARPA Round 2 GKCC_c/o_PCC 60,675.45 43,371.77 17,303.68
lockers, and transportation for homeless
on 10/10/25 persons in the city limits
PY25/FY26 People's Comm. Ctr. Operating cost for maintenance & utilities for
4 9/16/2025 6/30/2026 22,700.00 22,700.00 -
Shelter Operations the shelter
PY25/FY26 People's Comm. Ctr. Renovations of a facility that services the
5 9/16/2025 6/30/2026 40,000.00 ERR in progress 40,000.00
Renovations homeless
TOTAL 340,641.45 283,337.77 57,303.68
18
Page 19
ARPA 1 Application Item 1.
19
Page 20
ARPA 1 Application
Item 1.
Point Description:
Provide a monthly or annual timetable showing milestones for the completion of the activity.
Beginning of basement renovation October 2020
Beginning of every-night housing December 2020
Beginning of every-night meals April 2021
Completion of showers and laundry October 2021
Beginning of counseling offices June 2022
Beginning of fire suppression system August 2022
Completion of counseling offices September 2022
Maximum Points Possible 100
4
20
Page 21
Item 1.
ARPA 1 Reimb Req - Permits were needed for the grease trap, the
exterior doors, and the HVAC system. At least 2 of the contractors
were not licensed in the City. 21
Page 43
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Debbie
Cc: Harvey, Tracey
Subject: EXTERNAL: ARPA Reimburnsement
Date: Friday, October 17, 2025 12:05:01 PM
Attachments: October Reimbursement.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Thank you for the time you spent the other day walking through our facility! I hope that you
were impressed by how much we have been able to accomplish with minimal external
funding. And thank you to the City for seeing this work as a priority.
Attached hereto is a revised reimbursement request. The total requested is $12,038. That is for
the new beds, lockers, and indirect. We know that we are entitled to 15% indirect funding, but
rather than request all of that up front, it makes sense to me that we ask it to be attached to
each reimbursement. Is that the correct procedure?
I have attached one check (for the beds) and one credit card statement (for the lockers). I was
surprised that receipts were not sufficient. If I were to go to, say, Lowes, to buy equipment,
and were to send you the Lowes receipt, would that not be sufficient? The bank statements
alone do not show what the cost was for, but the receipts do, so I thought that the receipts
would be even better. Please advise.
Thank you,
Derrick Hodge
43
Page 44
46 South Bradford Item 1.
Dover 19904
302.674.4178
A collaboration of community stakeholders
who build partnerships to improve
the quality of life in Downtown Dover.
ARPA – Coalition Funding Reimbursement Request
15 October 2025
New Beds $6,126
Lockers $4,342
Subtotal $10,468
15% Indirect $1,570
Total Request $12,038
44
Page 45
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Debbie
Subject: EXTERNAL: ARPA Reimbursement Request
Date: Friday, January 30, 2026 3:46:30 PM
Attachments: November-January.pdf
Cleaning and Hygiene Detail January 2026.pdf
Bank Statement.pdf
Center Director Salary.pdf.pdf
Occpancy Transfers.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Attached hereto you will find the following:
1. A letter detailing reimbursable expenditures for November, December, and January;
2. Excel spread sheet detailing each purchase of cleaning and hygiene supplies; and
3. Banking records proving each supplies purchase;
4. Banking records showing payment of director's salary and occupancy.
Please therefore process a reimbursement in the amount of $8,528.89.
Thank you,
Derrick Hodge
President of the Board of Directors
Omitted 5 pages of bank statements.
45
Page 46
46 South Bradford Item 1.
Dover 19904
302.674.4178
A collaboration of community stakeholders
who build partnerships to improve
the quality of life in Downtown Dover.
ARPA Funding Reimbursement Request
1 November 2025 – 31 January 2026
Occupancy 3 months x $500 $1,500.00
Center Director 3 months x $300 $ 900.00
Case Manager $1,440.00
Cleaning and Hygiene Supplies $3,576.43
Subtotal $7,416.43
15% Indirect $1,112.46
Total Request $8,528.89
46
Page 47
Item 1.
People's Community Center
Cleaning and Hygiene Supplies Purchase November-January
Date Amount Date Amount
01/21/2026 -73.9 12/14/2025 -24.74
01/21/2026 -14.49 12/11/2025 -24.74
01/18/2026 -76.45 12/11/2025 -37.34
01/16/2026 -11.06 12/11/2025 -85.8
01/16/2026 -41.76 12/05/2025 -38.93
01/16/2026 -23.35 12/03/2025 -55.99
01/16/2026 -44.99 12/02/2025 -440
01/16/2026 -36.97 12/02/2025 19.99
01/15/2026 -44.99 11/29/2025 -26.39
01/15/2026 -20.33 11/26/2025 -220
01/15/2026 -18.89 11/26/2025 -373.99
01/15/2026 -24.74 11/26/2025 -11.98
01/15/2026 -53.51 11/26/2025 -19.99
01/15/2026 -37.34 11/19/2025 -23.98
01/15/2026 -43.69 11/19/2025 -23.6
01/14/2026 -77.25 11/17/2025 -23.6
01/14/2026 -13.79 11/17/2025 -39.37
01/12/2026 -17.05 11/17/2025 -44.99
01/12/2026 -54 11/17/2025 -8.25
01/12/2026 -55.73 11/17/2025 -37.34
01/12/2026 -24.74 11/16/2025 -36.97
01/12/2026 -16.24 11/14/2025 -36.97
01/11/2026 -36.97 11/14/2025 -45.59
01/09/2026 -103.96 11/14/2025 -17.99
01/05/2026 -34.99 11/14/2025 -20.09
01/05/2026 -32.97 11/14/2025 -18.98
01/05/2026 -82.48 11/14/2025 -44.99
01/05/2026 -93.58 11/07/2025 -90.15
12/25/2025 -161.8 11/04/2025 -29.64
12/15/2025 -41.17 11/04/2025 -6.99
12/15/2025 -11.69
12/15/2025 -44.99 Total -$3,576.43
12/15/2025 -26.1
12/15/2025 -44.99
12/15/2025 -17.99
12/15/2025 -20.35
12/15/2025 -25.19
12/14/2025 -36.97
12/14/2025 -45.59
47
Page 48
Item 1.
From: G. Derrick Hodge
To: O"Brien, Debbie
Subject: EXTERNAL:
Date: Tuesday, February 3, 2026 12:59:06 PM
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Dear Deborah,
Hold off on processing those two reimbursements; I decided to make an adjustment. I will send you new requests
on Monday.
Derrick
48
Page 49
Item 1.
From: O"Brien, Debbie
To: Dr. G. Derrick Hodge <gdhodge@pcd-dover.org>
Subject: People"s Community Center Invoices
Date: Friday, February 6, 2026 8:41:00 AM
Good morning, Dr. Hodge,
I hope you’re doing well. First, I want to sincerely thank you and your organization for the
essential services you continue to provide to our community. We truly value the work you do
and appreciate your ongoing partnership.
I recently consulted with our HUD representative, and we agreed that it would be helpful for
us to align on the terminology and supporting documentation required for invoices moving
forward. While there were no concerns with invoices submitted in the past, I now have the
responsibility to ensure full compliance with both ARPA and HUD guidelines. My goal is to
work collaboratively with you to make sure we are maintaining strong, transparent, and fully
auditable records. I would be happy to walk through this with you in person if that’s easiest,
or we can connect by phone or email — whatever you prefer.
Below are the key items we should review together:
Invoice Scope & Documentation
· Reimbursements must align strictly with what is outlined in the grant agreements.
For example, ARPA III specifies: “providing staffing for social and prevention services for at-risk
persons, emergency shelter, beds and lockers, and transportation for homeless persons within
the City of Dover limits.”
· “Indirect” costs cannot be reimbursed without clear documentation. All costs must
be supported by invoices, receipts, or other verifiable records.
o Time and mileage may be tracked and submitted via a spreadsheet or separate
invoice, if applicable.
o If software is shared with the church, we can reimburse up to 50% of the cost with a
copy of the invoice. The same applies to Wi-Fi expenses.
· If the shelter is renting space from the church, a lease agreement will need to be in
place. I will also need documentation showing the percentage of the community center used
for emergency shelter operations (this can typically be supported by architectural drawings).
· Utility reimbursements will require a justification based on the percentage of space
used by the temporary shelter.
49
Page 50
Item 1.
· For the case manager payroll, you may invoice for the full employer cost of $775.08,
which includes employer-paid taxes.
· For the Center Director salary, we will need an agreement indicating the center’s
$300/month contribution, along with a brief description of the Director’s responsibilities. If
this payment is made through the church, the payroll register showing the individual is being
paid, along with the proof of payment will suffice.
Other Covered Expenses
· Minor maintenance items (e.g., light bulbs, replaceable parts)
· Utilities (phone, electric, gas)
· Food
· Paper goods
· Cleaning supplies
· Insurance
· Pest extermination services
· Office supplies and printing costs
· Hygiene products, including female hygiene items, towels, and washcloths
Please don’t hesitate to reach out if you have questions or if there’s anything you’d like to
discuss ahead of time. I appreciate your cooperation and look forward to continuing our work
together.
Warm regards,
Debbie O’Brien, CPFO
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
50
Page 51
Item 1.
From: Reverend G. D. Hodge, Ph.D
To: O"Brien, Deborah
Subject: EXTERNAL: ARPA Round 2 GKCC/PCC Reimbursement Request
Date: Thursday, June 11, 2026 4:00:19 PM
Attachments: ARPA Round 2 GKC-PCC Reimbursement Request.pdf
Peoples Community Center Personnel Costs.pdf
PCC MOU.pdf
Hodge Personnel Report.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Please process a reimbursement to People's Community Center for $32,426.48, for allowable
personnel costs. The following supporting documents are attached hereto:
1. Cover letter detailing the reimbursement request;
2. Payroll Report showing staff costs of $26,426.48 for the fiscal year;
3. Memorandum of Understanding between People's Church and People's Community
Center, showing an agreement for the community center to reimburse the church for a
small portion of the professional salary of its Pastor.
4. Payroll report sowing total fiscal year payments to the Pastor.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent
information, or the omission of any material fact, may subject me to criminal, civil, or
administrative consequences including, but not limited to violations of U.S. Code Title 18,
Sections 2, 1001, 1343 and Title 31, Sections 3729-3730 and 3801-3812.
Respectfully submitted,
G. D. Hodge, Ph.D.
President of the Board of Directors
51
Page 53
Item 1.
Includes shelter staff, which can't be paid after 3/31/26 due to Solicitor letter of 3/23/26. Pastor's payroll reports
omitted.
53
Page 56
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: ARPA Round 2 GKCC/PCC Reimbursement Request
Date: Thursday, June 11, 2026 4:02:57 PM
Attachments: Church Invoice 2.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien
Attached hereto is one more document that I forgot to include with the others.
Thank you,
Derrick
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
56
Page 57
Item 1.
46 South Bradford
Dover, Delaware 19901
302.674.4177
pcd-dover.org
INVOICE
Dates of Space Rental: 1 July 2025 – 31 June 2026
Tenant: People’s Community Center
Item: Case Management
Programs: Services for At-Risk Persons in Dover
Service: Case Management and Crisis Counseling – cost sharing
Amounts: $500 per month x 12 months for G. D. Hodge, Ph.D.
Total Due: $6,000
Submitted by:
John Allison, Moderator
People’s Church of Dover
57
Page 58
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: ARPA Round 2 GKC-PCC Reimbursement Request
Date: Friday, June 12, 2026 4:45:45 PM
Attachments: Church Invoice Hodge Salary.pdf
Personnel Roles.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
There were two typographical errors on the church invoice that I sent you yesterday. Attached
hereto is a corrected invoice. Please discard the one I sent yesterday.
Also attached is a list of personnel, with their titles (roles). All are a part of the Center for
Neighbors in Need; we do not seek reimbursement under this grant for employees of other
programs of the PCC.
Thank you,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
58
Page 59
Item 1.
46 South Bradford
Dover, Delaware 19901
302.674.4177
pcd-dover.org
INVOICE
Dates of Services Rendered: 1 July 2025 – 30 June 2026
Tenant: People’s Community Center
Item: Case Management
Programs: Services for At-Risk Persons in Dover
Service: Case Management and Crisis Counseling – cost sharing
Amounts: $500 per month x 12 months for G. D. Hodge, Ph.D.
Total Due: $6,000
Submitted by:
John Allison, Moderator
People’s Church of Dover
59
Page 60
46 South Bradford Item 1.
Dover 19904
302.674.4178
A collaboration of community stakeholders
who work to improve
the quality of life in Downtown Dover.
Personnel Roles
Claud Angel Kitchen Manager
Kaitlyn Bulson Peer Counselor
Teresa Campbell Program Coordinator
Joseph Ellis Kitchen Staff
Danieve Harper Laundry
Richard Kozakowski Clothing and Donations
Creswell Moore Day Supervisor
Quime Romero Laundry and Day Staff
Tyrone Savage Night Staff
60
Page 61
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Cc: Duca, Sharon
Subject: RE: EXTERNAL: ARPA Round 2 GKC-PCC Reimbursement Request
Date: Wednesday, June 24, 2026 4:45:00 PM
Attachments: ARPA Round 2 GKCC Invoice.pdf
Personnel Roles.pdf
image001.png
Good afternoon, Dr. Hodge,
Your invoice was rejected as is, because we need to distinguish between staff members that had
responsibilities with the overnight shelter that ceased to operate on April 1, 2026 and those who are
paid for the other services you provide, as listed in the agreement.
It reads: “providing staffing for social and prevention services for at risk persons, emergency shelter,
beds and lockers, and transportation for homeless persons in the City of Dover limits.”
Restated for clarity:
1. Staffing for social prevention services for at risk persons
2. Staffing for prevention services for at risk persons
3. Emergency shelter (through 3/31/26) for homeless persons
4. Beds (through 3/31/26) for homeless persons
5. Lockers for homeless persons
6. Transportation for homeless persons in the City of Dover limits
Please place each employee in one of these categories, so I can calculate their wages up to the
cutoff date for those that worked for the overnight shelter services. If you have other invoices that
you would like to add, please include them on your revised cover letter. Let me know if you have
any questions.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
61
Page 62
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: Re: EXTERNAL: ARPA Round 2 GKC-PCC Reimbursement Request
Date: Wednesday, June 24, 2026 5:18:16 PM
Attachments: image001.png
Personnel Roles.pdf
Dear Ms. O'Brien,
I am happy to clarify as best as I can.
The document "Personnel Roles" I sent before -- and which is re-attached hereto -- is accurate and
correct, and describes the work of all staff for whose wages we request reimbursement. I affirm that
ALL the personnel listed on that document were engaged EXCLUSIVELY on the work described in the
sub-recipient agreement. They fit into your categorization as follows:
Category 1: Staffing for social prevention services for at risk persons; and Category 2: Staffing
for prevention services for at risk persons
Hodge
Bulson
Campbell
Category 3: Emergency Shelter (through 3/31/26) for Homeless Persons
Angel
Ellis
Harper
Kozakowski
Moore
Romero
Savage
The beds and lockers (Categories 4 and 5) have already been reimbursed, so we seek no further
reimbursement. We also do not seek reimbursement for any expenditures related to transportation
(Category 6).
Thank you,
Derrick Hodge
On 06/24/2026 4:45 PM, O'Brien, Deborah wrote:
Good afternoon, Dr. Hodge,
Your invoice was rejected as is, because we need to distinguish between staff members that had
responsibilities with the overnight shelter that ceased to operate on April 1, 2026 and those who
are paid for the other services you provide, as listed in the agreement.
62
Page 63
Item 1.
From: O"Brien, Deborah on behalf of dobrien@dover.de.us
To: "G. D. Hodge, Ph.D."
Cc: Duca, Sharon
Subject: RE: EXTERNAL: ARPA Round 2 GKC-PCC Reimbursement Request
Date: Monday, July 13, 2026 4:29:00 PM
Attachments: image001.png
image002.png
ARPA Round 2 GKC-PCC Reimbursement Request.pdf
Good afternoon, Dr. Hodge,
I’m sorry for the delay in responding. For backup, I will need the actual payroll reports for all the
shelter workers showing the weekly or bi-weekly payroll information from 7/1/25 through 3/31/26,
along with the revised totals for each employee. The summary payroll report will be sufficient for
categories 1 and 2 below. Please note that the attached invoice will need to be revised with the
exact allowable payroll costs, once you have that amount.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Department of Planning, Inspections & Community Development
City of Dover
(P) 302-736-7175
(F) 302-736-4217
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Wednesday, June 24, 2026 5:18 PM
To: O'Brien, Deborah <dobrien@dover.de.us>
Subject: Re: EXTERNAL: ARPA Round 2 GKC-PCC Reimbursement Request
Dear Ms. O'Brien,
I am happy to clarify as best as I can.
The document "Personnel Roles" I sent before -- and which is re-attached hereto -- is accurate
and correct, and describes the work of all staff for whose wages we request reimbursement. I
affirm that ALL the personnel listed on that document were engaged EXCLUSIVELY on the
work described in the sub-recipient agreement. They fit into your categorization as follows:
Category 1: Staffing for social prevention services for at risk persons; and Category
63
Page 64
Item 1.
From: O"Brien, Deborah
To: O"Brien, Deborah; G. D. Hodge, Ph.D.
Cc: Duca, Sharon
Subject: RE: EXTERNAL: ARPA Round 2 GKC-PCC Reimbursement Request
Date: Friday, August 14, 2026 8:09:18 AM
Attachments: image001.png
image002.png
Good morning, Dr. Hodge,
I know you’ve been on sabbatical, but I’m still waiting for the backup for the ARPA reimbursement.
We need to process this by next Friday, August 21, if we’re going to accrue it back to FY26.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Department of Planning, Inspections & Community Development
City of Dover
(P) 302-736-7175
(F) 302-736-4217
From: O'Brien, Deborah <dobrien@dover.de.us>
Sent: Monday, July 13, 2026 4:30 PM
To: 'G. D. Hodge, Ph.D.' <gdhodge@pcc-dover.org>
Cc: Duca, Sharon <SDuca@doverde.gov>
Subject: RE: EXTERNAL: ARPA Round 2 GKC-PCC Reimbursement Request
Good afternoon, Dr. Hodge,
I’m sorry for the delay in responding. For backup, I will need the actual payroll reports for all the
shelter workers showing the weekly or bi-weekly payroll information from 7/1/25 through 3/31/26,
along with the revised totals for each employee. The summary payroll report will be sufficient for
categories 1 and 2 below. Please note that the attached invoice will need to be revised with the
exact allowable payroll costs, once you have that amount.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
64
Page 65
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: Payroll Details
Date: Thursday, August 20, 2026 1:16:19 PM
Attachments: Hodge Paystubs.pdf
Employee Pay Details, by Title.pdf
Employee Pay Details, by Name.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Attached hereto are the detailed payroll reports you requested:
1. Hodge payments, from 1 July 2025 until 30 June 2026;
2. All employees for whom reimbursement is requested), labeled according to job title; and
3. All employees for whom reimbursement is requested), labeled according to job name.
Thank you,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
65
Page 66
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: Payroll Details
Date: Thursday, August 20, 2026 1:16:19 PM
Attachments: Hodge Paystubs.pdf
Employee Pay Details, by Title.pdf
Employee Pay Details, by Name.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Attached hereto are the detailed payroll reports you requested:
1. Hodge payments, from 1 July 2025 until 30 June 2026;
2. All employees for whom reimbursement is requested), labeled according to job title; and
3. All employees for whom reimbursement is requested), labeled according to job name.
Thank you,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
There were 65 pages attached. In order to reconcile, I needed to
create an Excel spreadsheet identifying each employee who was
paid, how much they were paid, and on what dates they were paid.
Shelter staff employees paid after 3/31/26 were omitted.
66
Page 67
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Cc: Duca, Sharon; Dickerson, Robin; Marney, Patricia
Subject: RE: EXTERNAL: Payroll Details
Date: Tuesday, August 25, 2026 10:50:00 AM
Attachments: image001.png
image002.png
Importance: High
Good morning, Dr. Hodge,
Thank you for the backup I needed to process your reimbursement. I’ve calculated the total reimbursable amount for the staff. I went by the employer cost on
your report. Please send a new cover letter with the amount of $31,333.77, so we can get it accrued back to 6/30/26.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Department of Planning, Inspections & Community Development
City of Dover
(P) 302-736-7175
(F) 302-736-4217
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Thursday, August 20, 2026 1:15 PM
To: O'Brien, Deborah <dobrien@doverde.gov>
Subject: EXTERNAL: Payroll Details
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Attached hereto are the detailed payroll reports you requested:
1. Hodge payments, from 1 July 2025 until 30 June 2026;
2. All employees for whom reimbursement is requested), labeled according to job title; and
3. All employees for whom reimbursement is requested), labeled according to job name.
Thank you,
________________________________________________________________________________
G. D. Hodge, Ph.D.
67
Page 68
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL:
Date: Friday, August 28, 2026 2:36:00 PM
Attachments: ARPA Round 2 GKC-PCC Reimbursement Request.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Thank you,
Derrick
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
68
Page 69
46 South Bradford Item 1.
Dover 19904
302.674.4178
A collaboration of community stakeholders
who work to improve
the quality of life in Downtown Dover.
11 June 2026
Ms. Deborah O’Brien, CPFO, MBA
Community Development Manager
City of Dover
RE: ARPA Round 2 GKCC/PCC
Dear Ms. O’Brien,
Please reimburse People’s Community Center $32,426.48 for the following allowable
personnel expenditures, according to our contract with the City and consistent with
applicable federal and local statute:
1. Staff Wages: $26,426.48 (twelve months).
Documentation Attached:
▪ Payroll Report.
2. Professional Salary Share: $6,000 (for twelve months at $500 per month).
Documentation Attached:
▪ Memorandum of Understanding between PCD and PCC;
▪ Payroll Report, showing total personnel costs for the period: $81,346.90.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent
information, or the omission of any material fact, may subject me to criminal, civil, or
administrative consequences including, but not limited to violations of U.S. Code Title 18,
Sections 2, 1001, 1343 and Title 31, Sections 3729-3730 and 3801-3812.
Respectfully submitted,
G. D. Hodge, Ph.D.
President of the Board of Directors
69
Page 70
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Subject: RE: EXTERNAL:
Date: Friday, August 28, 2026 2:41:00 PM
Attachments: image001.png
RE EXTERNAL Payroll Details.msg
Dr. Hodge,
The allowable costs are $31,333.77, consisting of $25,333.77 for staff and $6,000 for your salary.
Please revise your invoice to reflect the correct amount.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Department of Planning, Inspections & Community Development
City of Dover
(P) 302-736-7175
(F) 302-736-4217
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Friday, August 28, 2026 2:36 PM
To: O'Brien, Deborah <dobrien@doverde.gov>
Subject: EXTERNAL:
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Thank you,
Derrick
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
70
Page 71
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: Re: EXTERNAL:
Date: Friday, August 28, 2026 3:05:28 PM
Attachments: image001.png
Final Personnel Reimbursement August 2026.pdf
In my absent-mindedness, I attached the wrong file. Here is the corrected one.
d.
On 08/28/2026 2:41 PM, O'Brien, Deborah wrote:
Dr. Hodge,
The allowable costs are $31,333.77, consisting of $25,333.77 for staff and $6,000 for your salary.
Please revise your invoice to reflect the correct amount.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Department of Planning, Inspections & Community Development
City of Dover
(P) 302-736-7175
(F) 302-736-4217
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Friday, August 28, 2026 2:36 PM
To: O'Brien, Deborah <dobrien@doverde.gov>
Subject: EXTERNAL:
71
Page 72
46 South Bradford Item 1.
Dover 19904
302.674.4178
A collaboration of community stakeholders
who build partnerships to improve
the quality of life in Downtown Dover.
28 August 2026
Ms. Deborah O’Brien, CPFO, MBA
Community Development Manager
City of Dover
RE: ARPA Round 2 GKCC/PCC
Dear Ms. O’Brien,
Please reimburse People’s Community Center $31,333.77 for allowable personnel costs
($25,333.77 for staff plus $6,000 for the Director), according to our sub-recipient
agreement with the City and consistent with applicable federal statute and ordinance.
You previously received documentation of these expenditures under separate cover.
I certify to the best of my knowledge and belief that the information provided herein is
true, complete, and accurate. I am aware that the provision of false, fictitious, or
fraudulent information, or the omission of any material fact, may subject me to criminal,
civil, or administrative consequences including, but not limited to violations of U.S. Code
Title 18, Sections 2, 1001, 1343 and Title 31, Sections 3729-3730 and 3801-3812.
Respectfully submitted,
G. D. Hodge, Ph.D.
President of the Board of Directors
72
Page 77
Item 1.
From: O"Brien, Debbie
To: gdhodge@pcc-dover.org
Cc: O"Brien, Debbie
Subject: Monthly Program Updates – Help Us Share Your Impact
Date: Thursday, February 5, 2026 2:08:00 PM
Importance: High
Good afternoon, Dr. Hodge,
I hope you are doing well. I want to start by saying THANK YOU for the important work you do
every day on behalf of our community. The services you provide make a real difference for
residents, and we truly appreciate your ongoing partnership.
As part of our efforts to better communicate the impact of our CDBG-funded programs, we
are asking subrecipients to submit a brief monthly status update highlighting your recent
activity and outcomes. While monthly reporting is included in your agreement, our goal here
is less about formality and more about giving you the opportunity to showcase your successes
and help us tell your story more effectively. And, it’s not just about the money that you spent
in January; it's about the people you helped. You may have just answered a question that
saved a person time or frustration, so feel free to use call/telephone logs or anything else I
might not have thought to mention, in addition to all of the other details.
For each month, we ask that you share:
· The number of individuals served
· The number of requests received – please include those who didn’t qualify or backed
out for some reason. You spend valuable time gathering information and processing cases
and should be acknowledged for these too!
· Whether you currently have a waiting list
· Any success stories or highlights you would like to share (no names or identifying
information, please)
These updates are incredibly valuable. They help us demonstrate program impact to City
Council, strengthen confidence among private investors and Community Development
Financial Organizations (CDFOs), and communicate clearly with beneficiaries, community
stakeholders, and the media. Consistent outcome information builds trust, supports
continued funding, and helps ensure that the services you provide remain visible and well-
supported.
We truly want this to be a space for you to brag a little — your accomplishments deserve to
be seen. I know this is short notice, but would you please, for the month of January, give me
as much or any information you can pull together for me to use in my report to Council, which
77
Page 78
Item 1.
is due by Friday, February 13th.
Please feel free to reach out if you have questions or need clarification. We appreciate your
collaboration and look forward to highlighting the great work you are doing.
Sincerely,
Debbie O’Brien, CPFO
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
78
Page 79
Item 1.
From: O"Brien, Deborah
To: gdhodge@pcc-dover.org
Cc: Duca, Sharon
Subject: Reminder – CDBG Agreements Expiring June 30, 2026
Date: Friday, June 5, 2026 2:59:00 PM
Good afternoon, Dr. Hodge,
I wanted to send a friendly reminder that the PY2025 CDBG agreements for the Shelter
Operations Project and the Renovations Project are scheduled to expire on June 30, 2026.
As discussed during our meeting and in my follow-up email, if PCC intends to seek
reimbursement for eligible expenses incurred under either agreement, please submit the
required reimbursement requests and supporting documentation as soon as possible to allow
sufficient time for review and processing prior to the expiration date.
If you have any questions regarding eligible expenses, documentation requirements, or the
status of either project, please let me know.
Thank you, and I look forward to hearing from you.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
79
Page 80
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: Re: Reminder – CDBG Agreements Expiring June 30, 2026
Date: Friday, June 5, 2026 3:02:43 PM
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Thank you for reminding me. I am overwhelmed and doing the best I can.
I will send you a reimbursement request early next week, say. on 9 June.
Derrick
On 06/05/2026 2:59 PM, O'Brien, Deborah wrote:
Good afternoon, Dr. Hodge,
I wanted to send a friendly reminder that the PY2025 CDBG agreements for the Shelter
Operations Project and the Renovations Project are scheduled to expire on June 30, 2026.
As discussed during our meeting and in my follow-up email, if PCC intends to seek
reimbursement for eligible expenses incurred under either agreement, please submit the
required reimbursement requests and supporting documentation as soon as possible to
allow sufficient time for review and processing prior to the expiration date.
If you have any questions regarding eligible expenses, documentation requirements, or the
status of either project, please let me know.
Thank you, and I look forward to hearing from you.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
--
________________________________________________________________________________
80
Page 89
Item 1.
From: O"Brien, Debbie
To: Dr. G. Derrick Hodge <gdhodge@pcd-dover.org>
Cc: Harvey, Tracey
Subject: Renovations project
Date: Tuesday, October 7, 2025 8:24:00 AM
Good morning, Dr. Hodge,
In the process of doing the environmental review for your project, we realized that since the
building was built prior to 1978, and the scope of work includes interior remodeling, it will need
to be tested for lead-based paint by a qualified environmental company. The expense is
eligible for reimbursement through CDBG; however, you will need to obtain 3 quotes before
you can proceed. If lead-based paint is found in the area where the work is to be completed,
mitigation measures to reduce, avoid, or eliminate adverse environmental impacts will be
required before the project can be started.
Thanks!
Debbie O’Brien, CPFO
Community Development Manager
City of Dover Planning Department
15 Loockerman Plaza
Dover, DE 19901
(302) 736-7196
89
Page 90
Item 1.
From: O"Brien, Debbie
To: Dr. G. Derrick Hodge <gdhodge@pcd-dover.org>
Cc: Harvey, Tracey
Subject: RE: Renovations project
Date: Tuesday, October 7, 2025 10:45:00 AM
Dr. Hodge,
It just occurred to me that the lead-based paint assessment probably won’t cost more than
$10,000, and therefore, won’t require 3 quotes. I apologize for the confusion!
Thanks!
Debbie O’Brien, CPFO
Community Development Manager
City of Dover Planning Department
15 Loockerman Plaza
Dover, DE 19901
(302) 736-7196
_____________________________________________
From: O'Brien, Debbie
Sent: Tuesday, October 7, 2025 8:25 AM
To: Dr. G. Derrick Hodge <gdhodge@pcd-dover.org> <gdhodge@pcd-dover.org>
Cc: Harvey, Tracey <tharvey@DOVER.DE.US>
Subject: Renovations project
Good morning, Dr. Hodge,
In the process of doing the environmental review for your project, we realized that since the
building was built prior to 1978, and the scope of work includes interior remodeling, it will need
to be tested for lead-based paint by a qualified environmental company. The expense is
eligible for reimbursement through CDBG; however, you will need to obtain 3 quotes before
you can proceed. If lead-based paint is found in the area where the work is to be completed,
mitigation measures to reduce, avoid, or eliminate adverse environmental impacts will be
required before the project can be started.
90
Page 91
Item 1.
From: Scott Rifkin
To: O"Brien, Debbie; G. D. Hodge, Ph.D.
Cc: Nathaniel Alper
Subject: Re: EXTERNAL: Re: 46 S Bradford Interior Renovation HUD ER Complete
Date: Friday, January 23, 2026 10:01:11 AM
Hi Debbie and Rev. Hodge,
Our agreement requires payment before we convert and assign the Environmental Review
(ER) in HEROS. We have completed the entry into HEROS and it is ready to be assigned as
soon as payment is received.
However, please let us know if this presents a hardship and we can discuss making an
exception.
Thanks,
Scott
On Fri, Jan 23, 2026 at 9:24 AM O'Brien, Debbie <dobrien@dover.de.us> wrote:
Good morning,
Yes, I received it. Thank you! Is this in HEROS?
Sincerely,
Debbie O’Brien, CPFO
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
91
Page 92
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: CDBG Renovation Reimbursement Request
Date: Wednesday, June 10, 2026 2:52:52 PM
Attachments: CDBG Renovation Reimbursement Request Cover.pdf
Executed MFI Revised Contract.pdf
MFI Proof of Payment.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Please reimburse People's Community Center in the amount of $40,000 for building
renovations related to the Center for Workforce Development. Attached hereto are three
supporting documents:
1. Cover letter detailing the expenditure;
2. Proof of payment by Dover Federal Credit Union; and
3. Renovations contract with MFI Construction Company.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent
information, or the omission of any material fact, may subject me to criminal, civil, or
administrative consequences including, but not limited to violations of U.S. Code Title 18,
Sections 2, 1001, 1343 and Title 31, Sections 3729-3730 and 3801-3812.
Thank you,
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
92
Page 93
46 South Bradford Item 1.
Dover 19904
302.674.4178
A collaboration of community stakeholders
who work to improve
the quality of life in Downtown Dover.
10 June 2026
Ms. Deborah O’Brien, CPFO, MBA
Community Development Manager
City of Dover
RE: PY25/FY26 CDBG Renovations
Dear Ms. O’Brien,
Please reimburse People’s Community Center for the following renovation expenditures,
according to our contract with the City.
1. Renovation Costs:
Reimbursement Requested: $40,000.
Documentation Attached: Contract with MFI; proof of payment of $44,504.,04.
Note: The total contract amount is $178,016.14.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent
information, or the omission of any material fact, may subject me to criminal, civil, or
administrative consequences including, but not limited to violations of U.S. Code Title 18,
Sections 2, 1001, 1343 and Title 31, Sections 3729-3730 and 3801-3812.
Respectfully submitted.
G. D. Hodge, Ph.D.
President of the Board of Directors
93
Page 102
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Subject: RE: EXTERNAL: CDBG Renovation Reimbursement Request
Date: Wednesday, June 10, 2026 3:00:00 PM
Attachments: image001.png
Dr. Hodge,
Did you do an RFP or solicit sealed bids for this? Our purchasing policy requires anything over
$50,000 to do one or the other. Don’t you have the invoices for Harvard or Kairo? I can at least get
you the reimbursement for them, as well as AZ-RI. I still need to post the public notice, so let me
know if you have any other smaller invoices that can be applied to the workforce development
renovations.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Wednesday, June 10, 2026 2:52 PM
To: O'Brien, Deborah <dobrien@dover.de.us>
Subject: EXTERNAL: CDBG Renovation Reimbursement Request
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Please reimburse People's Community Center in the amount of $40,000 for building
renovations related to the Center for Workforce Development. Attached hereto are three
102
Page 103
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Debbie
Subject: EXTERNAL: Fwd: CDBG First Reimbursement Request
Date: Friday, January 30, 2026 4:32:11 PM
Attachments: First Reimbursement Detail.pdf
CDBG Expenditures November-January.pdf
AZRI Invoice.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Attached hereto you will find the following documents:
1. Spread sheet detailing the reimbursable expenditures;
2. Bank statements showing the payments made; and
3. Invoice from Azri Consultants.
Please therefore process a CDBG reimbursement for the amount of $17,100.
Thank you,
Derrick Hodge
President of the Board of Directors
People's Community Center
103
Page 104
Item 1.
People's Community Center
CDBG Expenditures, November 2025-January 2026
Date Vendor Purpose Amount Total
5 November Harvard Environmental Lead Assessment $ 600
13 November Kario Environmental Lead Abatement $ 6,000
26 November Kario Environmental Lead Abatement $ 5,500
22 December Harvard Environmental Lead Re-Assessment $ 300
31 January Azri Consultants Tier 1 Environmental $ 4,700
$ 17,100
104
Page 105
AZ-RI Item 1.
P.O. Box 4706
919 W. 34th Street
Baltimore, Maryland 21211
info@az-ri.com
az-ri.com
G.D. Hodge INVOICE 301
Peoples Church of Delaware
January 15th, 2026
46 South Bradford
Payment due by February 14th, 2026
Dover, Delaware 19904
Quantity Details Unit Price ($) Subtotal ($)
46 South Bradford
Dover, Delaware 19904
Complete a HUD Environmental Review (ER) in
accordance with 24 CFR Part 50 or Part 58 for CDBG grant
funding.
Project Name: 46 South Bradford Interior Renovation
1 HUD ENVIRONMENTAL REVIEW - CEST LEVEL 1,750.00 1,750.00
- Conducted by Environmental Scientist(s) with oversight by
an Environmental Professional (EP).
- Conducted in compliance with 24 CFR Part 58, 50, 51 and
55 as well as HUD MAP Guide (2021) as may be relevant.
NOTE: Price is reduced by $1,000 because 106 Hist.
Review determination is complete.
1 PHASE I ESA 2,950.00 2,950.00
- Conducted by an Environmental Scientist with oversight
by an Environmental Professional (EP) in accordance with
ASTM E1527-21.
- Report provided by email in .pdf format
USD Total $4,700.00
105
1/1
Page 106
Item 1.
From: O"Brien, Debbie
To: "G. D. Hodge, Ph.D."
Subject: RE: EXTERNAL: Fwd: CDBG First Reimbursement Request
Date: Monday, February 2, 2026 8:34:00 AM
Good morning, Dr. Hodge,
Please send invoices for the Harvard Environmental and Kario Environmental payments. Also, I don’t
see where AZ-RI was paid. Please provide a receipt or snipit of the bank statement showing where
the $4,700 was paid. Thanks!
Sincerely,
Debbie O’Brien, CPFO
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Friday, January 30, 2026 4:32 PM
To: O'Brien, Debbie <dobrien@dover.de.us>
Subject: EXTERNAL: Fwd: CDBG First Reimbursement Request
WARNING: This email originated from outside of the organization. Do not click
links or open attachments unless you recognize the sender and know the content
is safe.
Dear Ms. O'Brien,
Attached hereto you will find the following documents:
1. Spread sheet detailing the reimbursable expenditures;
2. Bank statements showing the payments made; and
3. Invoice from Azri Consultants.
Please therefore process a CDBG reimbursement for the amount of $17,100.
Thank you,
Derrick Hodge
President of the Board of Directors
106
Page 107
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Debbie
Subject: EXTERNAL: CDBG Reimbursement Request 1
Date: Thursday, April 9, 2026 4:17:13 PM
Attachments: Award Letter.pdf
First Reimbursement Detail.pdf
AZRI Invoice.pdf
Bank Transactions November-January.pdf
Cancelled Checks.pdf
Shower Repair Documents.pdf
Dishwasher Invoice.pdf
Dishwasher Credit Card Charge.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Attached hereto are a number of documents related to expenditures of the block grant awarded to
us by the City on 16 September 2025, and whose final contract was fully executed on 24
September.
1. Award Letter;
2. Spreadsheet Detailing the Construction and Repair-Related Expenditures;
3. Invoices, bank statements, and cancelled checks to support each of the 7 expenditures.
All these expenditures were consistent with the initial grant application narrative and contract, and
all are well supported by the above-referenced documents. I hope, therefore, that the City will
reimburse us in the amount of $37, 273.
These expenditures are all related to renovations of the physical space; we have not yet requested
reimbursement of any of the $22,700 allotted to us for operations costs.
Thank you,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
107
Page 108
Item 1.
People's Community Center
Block Grant Reimbursement Request
Date Cleared Vender Service Provided Amount
05 November Harvard Lead Paint Testing 600
13 November Kairo Lead Paint Abatement 6,000
26 November Kairo Lead Paint Abatement 5,500
22 December Harvard Lead Paint Re-Testing 300
04 February Azri Environmental Review 4,700
25 February Restaurant Store Dishwasher and Soap 6,173
2 March Woodard Shower Repair 14,000
Total Construction-Related Costs 37,273
The invoices for Kairo and Harvard were still not attached to this invoice.
108
Page 109
AZ-RI Item 1.
P.O. Box 4706
919 W. 34th Street
Baltimore, Maryland 21211
info@az-ri.com
az-ri.com
G.D. Hodge INVOICE 301
Peoples Church of Delaware
January 15th, 2026
46 South Bradford
Payment due by February 14th, 2026
Dover, Delaware 19904
Quantity Details Unit Price ($) Subtotal ($)
46 South Bradford
Dover, Delaware 19904
Complete a HUD Environmental Review (ER) in
accordance with 24 CFR Part 50 or Part 58 for CDBG grant
funding.
Project Name: 46 South Bradford Interior Renovation
1 HUD ENVIRONMENTAL REVIEW - CEST LEVEL 1,750.00 1,750.00
- Conducted by Environmental Scientist(s) with oversight by
an Environmental Professional (EP).
- Conducted in compliance with 24 CFR Part 58, 50, 51 and
55 as well as HUD MAP Guide (2021) as may be relevant.
NOTE: Price is reduced by $1,000 because 106 Hist.
Review determination is complete.
1 PHASE I ESA 2,950.00 2,950.00
- Conducted by an Environmental Scientist with oversight
by an Environmental Professional (EP) in accordance with
ASTM E1527-21.
- Report provided by email in .pdf format
USD Total $4,700.00
109
1/1
Page 117
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Debbie
Subject: EXTERNAL: CDBG Operations Reimbursement Request
Date: Friday, April 10, 2026 2:48:10 PM
Attachments: First Reimbursement Detail.pdf
Motor Vehicles Receipt.pdf
Vital Statistics 1.pdf
Vital Statistics 2.pdf
Vital Statistics 3.pdf
Vital Statistics 4.pdf
Vital Statistics 5.pdf
Green Card Replacement Receipt.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
The Center for Workforce Development has begun operations. be helping people who want to get
back into the workforce to obtain their basic documents needed to work legally in the formal
economy.
Thus far we have spent $220 of the $22,700 allotted to us via our contract with the City.
Attached hereto are document in support of those expenditures: cancelled checks to the Delaware
Office of Vital Statistics (for birth certificates); the Department of Motor Vehicles (for a State
Identification Card), and the Royal Thai Embassy (to replace a lost green card and passport,
required to work legally). There is also a spread sheet detailing the expenditures and dates.
Please process a reimbursement in the amount of $220, to be charged to the 2025 CDBG via our
contract executed on 24 September 2025.
Thank you,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
117
Page 118
Item 1.
People's Community Center
Block Grant First Operations Reimbursement Request
Date Cleared Vender Service Provided Amount
10 April Vital Statistics Birth Certificate 25
10 April Vital Statistics Birth Certificate 25
10 April Vital Statistics Birth Certificate 25
10 April Vital Statistics Birth Certificate 25
10 April Vital Statistics Birth Certificate 25
13 February DMV State Identification Card 40
1 April Royal Thai Embassy Lost Documents Replacement 55
Total Operations Costs $ 220
There were 7 pages of receipts/check copies attached.
118
Page 119
Item 1.
From: O"Brien, Debbie
To: gdhodge@pcc-dover.org
Cc: Duca, Sharon
Subject: Follow-Up on Invoices and Grant Activities
Date: Tuesday, April 28, 2026 10:59:00 AM
Attachments: EXTERNAL CDBG Operations Reimbursement Request.msg
People"s Community Center Invoices.msg
image002.png
Good morning, Dr. Hodge,
For clarity and convenience, I’ve combined my response to both of your recent requests into this email. I’ve also attached your other request for reimbursement, along with my February 6 email
outlining the documentation needed to process future invoices. My goal is to ensure we can move forward with reimbursement as smoothly as possible while staying within federal requirements.
To begin, here is a summary of the current status of all City grant funds awarded:
Project Activity / Scope of Service
# Project Description Beginning Balance Paid Current Balance
Renovations of areas in an existing church that
1 ARPA Round 1 Peoples Church 153,978.00 153,978.00 - will be utilized as a shelter for the homeless
Support staff to meet the needs of the shelter,
maintenance and utility cost for shelter operations,
2 ARPA Round 2 Peoples Church 63,288.00 63,288.00 - and the purchase of meals
Staffing for social and prevention services for at
risk persons, emergency shelter, beds and
lockers, and transportation for homeless persons
3 ARPA Round 2 GKCC_c/o_PCC 60,675.45 12,038.00 48,637.45 in the city limits
PY25/FY26 People's Comm. Ctr. Operating cost for maintenance & utilities for the
4 Shelter Operations 22,700.00 - 22,700.00 shelter
PY25/FY26 People's Comm. Ctr. Renovations of a facility that services the
5 Renovations 40,000.00 - 40,000.00 homeless
TOTAL 229,304.00 111,337.45
Regarding your reimbursement request for Project #5, I noted a few items that will need to be addressed before processing:
The invoices from Harvard Environmental and Kairo Environmental were not included (as noted in my February 6 email). Please provide these at your earliest convenience.
The dishwasher and shower expenses are not eligible under Project #5, as this project is limited to renovations associated with the Workforce Development Program. These items appear to fall
under prior renovation activities and cannot be reimbursed under this project as currently structured.
Once the remaining documentation is received, I will be able to process reimbursement in the amount of approximately $17,100.
Regarding the invoice submitted for Project #4 ($220.00), the supporting receipts appear to relate more closely to Workforce Development Program activities rather than shelter operating costs for
maintenance and utilities, which is the current scope of this project. As submitted, I’m not able to process reimbursement under Project #4.
That said, I do want to help identify a path forward so that eligible costs can still be reimbursed. If you are planning to continue services such as the Workforce Development Program or meal program,
we could discuss amending the scope of Project #4 to align with those activities as an eligible public service. This would allow certain expenses, such as program-related equipment and supplies, to be
considered for reimbursement, provided they meet CDBG requirements and are properly documented.
Lastly, I wanted to follow up on the 15% indirect cost included in the budgets and invoices. Could you please confirm whether you have a federally negotiated indirect cost rate? If you are using the de
minimis rate, we would need to ensure that it is reflected in the subrecipient agreement before those costs can be reimbursed.
I’m happy to set up a time to walk through any of this together. My goal is to ensure compliance while also helping you access all eligible funding available under your agreements.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Thursday, April 9, 2026 4:16 PM
To: O'Brien, Debbie <dobrien@dover.de.us>
Subject: EXTERNAL: CDBG Reimbursement Request 1
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Attached hereto are a number of documents related to expenditures of the block grant awarded to us by the City on 16 September 2025, and whose final contract was fully executed on 24
September.
1. Award Letter;
2. Spreadsheet Detailing the Construction and Repair-Related Expenditures;
3. Invoices, bank statements, and cancelled checks to support each of the 7 expenditures.
All these expenditures were consistent with the initial grant application narrative and contract, and all are well supported by the above-referenced documents. I hope, therefore, that the
City will reimburse us in the amount of $37, 273.
These expenditures are all related to renovations of the physical space; we have not yet requested reimbursement of any of the $22,700 allotted to us for operations costs.
Thank you,
________________________________________________________________________________
119
Page 120
Item 1.
600 North King Street, Suite 300
Wilmington, DE 19801-3776
302.353.4144
Daniel A. Griffith
Partner
302.357.3254
DGriffith@whitefordlaw.com
March 23, 2026
Rev. Dr. G. Derrick Hodge
People’s Community Church & People’s Community Center
46 South Bradford Street
Dover, Delaware 19904
Re: Code Interpretation Decision
Dear Reverend Hodge:
The City has received a formal complaint concerning activities at the People’s
Community Church & People’s Community Center located at 46 South Bradford Street, Dover,
Delaware (”the Property”). The complaint alleges
The apparent expansion of a legal nonconforming use within an RG-1 zoning
district;
Potential unpermitted change of use involving sheltering, feeding, medical,
counseling, and youth-programming activities;
Life-safety, occupancy classification, and ADA compliance implications;
The expiration of temporary emergency authorizations without evidence of
renewal or subsequent approvals.
This letter provides an official interpretation of the Dover Zoning Code as it applies to
that portion of the use at the Property that includes overnight sheltering.1
1 To the extent that the complaint alleges code violations at the Property, code enforcement issues will be handled by the City
separately. This Code Interpretation Letter is limited to a determination regarding the permissive uses of the Property
Whiteford, Taylor & Preston LLP | whitefordlaw.com | DC · DE · FL · KY · MD · NC · NJ · NY · VA
*Whiteford, Taylor & Preston LLP is a limited liability partnership. Our Delaware offices are operated under a separate Delaware limited liability company, Whiteford, Taylor & Preston LLC
120
Page 121
Item 1.
March 23, 2026
Page 2
The Property is zoned RG-1 (general residential) and includes a church as a legal
nonconforming use. The complaint alleges that the Property’s use has expanded beyond its legal
nonconforming status.
Under Article III, Section 2.11 of the Zoning Code, any use permitted in one-family
residence zones is permitted in the RG-1 zone:
Section 2. - General residence zones (RG-1 and RG-2).
2.1 Uses permitted. In a general residence zone, no building or premises shall be used, and no
building or part of a building shall be erected, which is arranged, intended or designed to be
used, in whole or in part, for any purpose, except the following:
2.11 Any use permitted in one-family residence zones.
Under Article III, Section 1.14 a place or worship is a permissible, conditional use in the
RG-1 zone and is subject to the approval of the planning commission:
1.14 The following uses are permitted, conditional upon the approval of the planning
commission in accordance with the procedures and subject to the general conditions set forth
in section 10.1 and to any specified requirements set forth below:
(a) Places of worship, including parish houses; [and] schools, including nursery
schools, kindergartens and day care centers in accordance with article 5, Supplementary
Regulations, section 14. Child day care facilities; philanthropic and eleemosynary
institutions; hospitals and sanitariums for general medical care;
To the extent the Property includes, in addition to its otherwise permissible uses, a
component of overnight sheltering, that component constitutes a conditional use requiring
Planning Commission approval prior to operation. See, e.g., Zoning Code Section 10.1(g) (IO
zone): “Emergency shelters and transitional housing.” Section 2.4(c)(ix) (RG-1 conditional use
for bed and breakfast inns): “The stay of overnight guests shall be limited to 30 consecutive
days.”
In order to achieve compliance with these code provisions for overnight sheltering, the
City requires that you:
1. File a conditional use application for the overnight sheltering component pursuant to
Section 1.14;
2. Obtain any required site development plan or certificate-of-occupancy approvals
associated with a change of use prior to operation. 30.10 Site development plan approval.
Site development plan approval in accordance with article 10, section 2 hereof shall be
required prior to the issuance of building permits for the erection or enlargement of all
121
Page 122
Item 1.
March 23, 2026
Page 3
structures, development of recreation facilities, and prior to the issuance of certificates of
occupancy for any change of use.
3. Coordinate with the City of Dover Planning Commission for hearing and action on the
conditional use application. City of Dover Planning Commission.
Until conditional use approval is obtained, the overnight sheltering component should not
operate. Please contact the Planning Office to discuss timelines and application requirements.
In addition, please note that, if the Planning Commission approves the conditional use
application, this would be a change in occupancy classification. Plans from an
authorized/licensed design professional would be required to be submitted to the Chief Building
Inspector showing how code compliance will be achieved through local, state, building, and fire
codes for the new occupancy. This submittal would need to be approved by the Chief Building
Inspector:
ARTICLE III. - BUILDING CODE
Sec. 22-61. - Adopted.
(d) The International Existing Building Code. That certain documents, three copies of
which are on file in the Licensing and Permitting Office of the city, being marked and
designated as "The International Existing Building Code 2009 Edition" as published by
the International Code Council be and is hereby adopted as the Existing Building Code
of the City of Dover in the State of Delaware for regulating and governing the repair,
alteration, change of occupancy, addition and relocation of existing buildings, including
historic buildings, as herein provided
2.0 Submittal of Plans
2.1 Requirement to Submit Plans
2.1.1 Plans, specifications, and other required construction documentation shall be
submitted to the Office of the State Fire Marshal for review and approval.
2.1.1.1 Information provided on plans shall contain scale drawings and all specific
technical details necessary to accurately perform a plans examination.
2.1.1.2 Any required or non-required fire protection system submitted for review are
required to meet these regulations and the applicable NFPA code or
standard as adopted or modified by these regulations.
2.1.2 Residential or commercial site plans, whether defined as a major or minor
subdivision by a political subdivision's rule or regulations, shall be submitted to
the Office of the State Fire Marshal for approval. Subdivision plans shall provide
all information outlined in these regulations.
2.1.3 Building plans providing all information outlined in these regulations shall be
submitted to the Office of the State Fire Marshal for review and approval prior to
actual construction with respect to the following:
2.1.3.1 All new buildings and additions;
122
Page 123
Item 1.
March 23, 2026
Page 4
2.1.3.2 A building undergoing a change in occupancy;
2.1.3.3 A part of a building suffering damage from fire, explosion, or other cause;
2.1.3.4 All dwelling units when attached in units of 3 or more, to verify the fire rated
design of the required separation wall between units; or
2.1.3.5 Plans must be submitted for a building undergoing alteration, renovation, or
remodeling.
This interpretation is based on the current Dover Zoning Code and the property’s RG-1
designation, and it addresses only the zoning compliance requirements related to the overnight
sheltering component. If you have questions or wish to schedule a meeting, please reach out to
the Planning Office.
Very truly yours,
/s/ Daniel A. Griffith
Daniel A. Griffith
DG:dag
123
Page 124
Item 1.
600 North King Street, Suite 300
Wilmington, DE 19801-3776
302.353.4144
Daniel A. Griffith
Partner
302.357.3254
DGriffith@whitefordlaw.com
March 26, 2026
Rev. Dr. G. Derrick Hodge
People’s Community Church & People’s Community Center
46 South Bradford Street
Dover, Delaware 19904
Re: Deadline for Conditional Use Application
Dear Reverend Hodge:
On March 25, 2026, The People’s Community Church & People’s Community Center
(“People’s Church”) received from my office on behalf of the City of Dover (“City”)
correspondence in the nature of a code determination letter (“the Letter”).
Among other things, the Letter advised that
In order to achieve compliance with these code provisions for overnight
sheltering, the City requires that you:
1. File a conditional use application for the overnight sheltering
component pursuant to Section 1.14;
2. Obtain any required site development plan or certificate-of-occupancy
approvals associated with a change of use prior to operation. 30.10 Site
development plan approval. Site development plan approval in accordance with
article 10, section 2 hereof shall be required prior to the issuance of building
permits for the erection or enlargement of all structures, development of
recreation facilities, and prior to the issuance of certificates of occupancy for any
change of use.
3. Coordinate with the City of Dover Planning Office for hearing and
action on the conditional use application with the City of Dover Planning
Commission..
Until conditional use approval is obtained, the overnight sheltering
component should not operate. Please contact the Planning Office to discuss
timelines and application requirements.
Whiteford, Taylor & Preston LLP | whitefordlaw.com | DC · DE · FL · KY · MD · NC · NJ · NY · VA
*Whiteford, Taylor & Preston LLP is a limited liability partnership. Our Delaware offices are operated under a separate Delaware limited liability company, Whiteford, Taylor & Preston LLC
124
Page 125
Item 1.
March 26, 2026
Page 2
This correspondence is to advise that the People’s Church will have fourteen (14) days
from the date of its receipt of this correspondence to file the conditional use application
referenced above. In the absence of the City’s receipt of that conditional use application, the City
will commence enforcement proceedings.
If you have questions or wish to schedule a meeting, please reach out to the Planning
Office.
Very truly yours,
/s/ Daniel A. Griffith
Daniel A. Griffith
DG:dag
125
Page 126
Item 1.
From: Duca, Sharon
To: O"Brien, Debbie; Melson-Williams, Dawn; Sass, Kay; Osika, Jason A.; Brown, Matthew; Kopp, Eddie L
Subject: Fw: EXTERNAL: Winter Sanctuary Operations
Date: Wednesday, April 22, 2026 11:08:33 AM
FYI
Sharon J. Duca,P.E., ICMA-CM
City of Dover Acting City Manager
Sent from my Verizon, Samsung Galaxy smartphone
Get Outlook for Android
From: Duca, Sharon
Sent: Monday, April 13, 2026 4:01:31 PM
To: G. Derrick Hodge <gdhodge@pcc-dover.org>
Subject: RE: EXTERNAL: Winter Sanctuary Operations
Good Afternoon Dr. Hodge,
Thank you for providing clarification regarding the sheltering operations during the cold weather
months.
In terms of the conditional use noted by the City Solicitor, the intent is to try to resolve the matter
before next season. If you would like to discuss further please let me know.
Thank you,
SHARON J. DUCA, P.E., ICMA-CM
ACTING CITY MANAGER
City of Dover City Manager’s Office
P.O. Box 475
Dover, Delaware 19903
Phone: 302-736-7005
Fax: 302-736-7002
E-mail: sduca@dover.de.us
-----Original Message-----
From: G. Derrick Hodge <gdhodge@pcc-dover.org>
Sent: Monday, April 6, 2026 2:20 PM
To: Duca, Sharon <SDuca@dover.de.us>
Subject: EXTERNAL: Winter Sanctuary Operations
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. Duca,
126
Page 127
Item 1.
The City Solicitor informs me that we need to apply for a zoning variance in order to continue
operations of People’s Community Center's Cold-Weather Emergency Sanctuary.
However, that sanctuary only operates during the cold-weather months; we ceased operations for the
season at 8am on 1 April of this year. Neither the Council nor the Solicitor seems to understand just
who we are and what we do, despite my several presentations to the Council.
Since we are closed for the season, no “enforcement action”, threatened by the Solicitor, will be
necessary.
Thank you,
________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
127
Page 128
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: FY25/FY26 CDBG Operations Reimbursement Request
Date: Friday, June 12, 2026 5:01:13 PM
Attachments: Cover Letter.pdf
Church Invoice Space.pdf
PCC MOU.pdf
Floor Plan Rented to PCC.pdf
Occupancy Payments.pdf
Retail Receipts.pdf
Retail Purchase Detail Spreadsheet.pdf
People"s Amazon Purchases Banking.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Please reimburse People's Community Center in the amount of $22,700 for expenditures allowed
according to our sub-recipient agreement, and congruent with relevant federal and local procedure.
1. Occupancy and Utilities: $16,000.
2. Cleaning and Maintenance: $6,950.46.
You will find the following supporting documents attached:
1. Cover letter detailing the expenditures;
2. Space-Use Invoice from People's Church to People's Community Center;
3. Memorandum of Understanding for space use and personnel cost sharing;
4. Floor plan showing square footage leased;
5. Banking statement showing occupancy payments;
6. Itemized retail receipts for cleaning and maintenance supplies;
7. Spreadsheet detailing retail purchases; and
8. Banking statement showing retail purchases.
I certify to the best of my knowledge and belief that the information provided
herein is true, complete, and accurate. I am aware that the provision of false,
fictitious, or fraudulent information, or the omission of any material fact, may
subject me to criminal, civil, or administrative consequences including, but not
limited to violations of U.S. Code Title 18, Sections 2, 1001, 1343 and Title 31,
Sections 3729-3730 and 3801-3812.
Respectfully submitted,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
There were 120 pages attached to this - too many to be included in
the packet.
128
Page 129
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Subject: RE: EXTERNAL: FY25/FY26 CDBG Operations Reimbursement Request
Date: Monday, June 15, 2026 3:22:00 PM
Attachments: image002.png
Good afternoon, Dr. Hodge,
I left you a voice mail this morning. Just to recap, in the backup, there were some purchases that
were made after March 31st, so those can’t be counted. Likewise, the occupancy can only be
reimbursed through March. That brings the eligible expenses to $19,342.61. Do you want me to go
ahead and process it without the rest, or do you have any other invoices that could be included?
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Friday, June 12, 2026 5:00 PM
To: O'Brien, Deborah <dobrien@dover.de.us>
Subject: EXTERNAL: FY25/FY26 CDBG Operations Reimbursement Request
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Please reimburse People's Community Center in the amount of $22,700 for
expenditures allowed according to our sub-recipient agreement, and congruent with relevant
federal and local procedure.
129
Page 130
Item 1.
1. Occupancy and Utilities: $16,000.
2. Cleaning and Maintenance: $6,950.46.
You will find the following supporting documents attached:
1. Cover letter detailing the expenditures;
2. Space-Use Invoice from People's Church to People's Community Center;
3. Memorandum of Understanding for space use and personnel cost sharing;
4. Floor plan showing square footage leased;
5. Banking statement showing occupancy payments;
6. Itemized retail receipts for cleaning and maintenance supplies;
7. Spreadsheet detailing retail purchases; and
8. Banking statement showing retail purchases.
I certify to the best of my knowledge and belief that the information provided
herein is true, complete, and accurate. I am aware that the provision of false,
fictitious, or fraudulent information, or the omission of any material fact, may
subject me to criminal, civil, or administrative consequences including, but not
limited to violations of U.S. Code Title 18, Sections 2, 1001, 1343 and Title 31,
Sections 3729-3730 and 3801-3812.
Respectfully submitted,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
130
Page 131
Item 1.
From: G. D. Hodge, Ph.D
To: O"Brien, Deborah
Subject: Re: EXTERNAL: FY25/FY26 CDBG Operations Reimbursement Request
Date: Monday, June 15, 2026 3:33:58 PM
I am out of the office today, because it’s my day off. But I will fix it tomorrow and resubmit.
Thank you.
Sent from my iPhone
On Jun 15, 2026, at 3:22 PM, O'Brien, Deborah <dobrien@dover.de.us> wrote:
Good afternoon, Dr. Hodge,
I left you a voice mail this morning. Just to recap, in the backup, there were some purchases that
were made after March 31st, so those can’t be counted. Likewise, the occupancy can only be
reimbursed through March. That brings the eligible expenses to $19,342.61. Do you want me to go
ahead and process it without the rest, or do you have any other invoices that could be included?
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
<image002.png>
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Friday, June 12, 2026 5:00 PM
To: O'Brien, Deborah <dobrien@dover.de.us>
Subject: EXTERNAL: FY25/FY26 CDBG Operations Reimbursement Request
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
Please reimburse People's Community Center in the amount of $22,700 for
expenditures allowed according to our sub-recipient agreement, and congruent with relevant
131
Page 132
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: CDBG Operations Reimbursemenrt
Date: Wednesday, June 17, 2026 1:19:10 PM
Attachments: Exterminator Treatments.pdf
Exterminator Invoices.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
I understand that a few of the expenditures for which we requested CDBG reimbursement are not
eligible. I therefore submit an additional request, for extermination of insect infestations totaling
$4,324. The following documents are attached:
1. Invoices from the extermination company; and
2. A spreadsheet that details and totals the amounts.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent information,
or the omission of any material fact, may subject me to criminal, civil, or administrative
consequences including, but not limited to violations of U.S. Code Title 18, Sections 2, 1001, 1343
and Title 31, Sections 3729-3730 and 3801-3812.
Respectfully submitted,
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
132
Page 133
Item 1.
Insect Infestation Mitigation Charges
People's Community Center Shelter
DATE AMOUNT INVOICE
08/07/2025 $225 #45737
08/26/2025 $225 #45825
09/18/2025 $604 #46275
09/26/2025 $80 #46230
10/31/2025 $80 #46231
11/25/2025 $80 #46232
12/18/2025 $80 #46233
01/09/2026 $600 #47574
01/22/2026 $500 #47585
01/28/2026 $80 #46234
02/09/2026 $400 #47789
02/13/2026 $165 #47960
02/26/2026 $350 #47957
02/26/2026 $300 #48019
03/12/2026 $350 #48160
03/12/2026 $125 #48161
03/27/2026 $80 #46236
$4,324
There were 45 pages of invoices attached to this, but
no proof of payment.
133
Page 134
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Subject: RE: EXTERNAL: CDBG Operations Reimbursemenrt
Date: Wednesday, June 17, 2026 2:04:00 PM
Attachments: image002.png
Thank you, Dr. Hodge,
Do you have the proof of payment? They might have sent monthly statements, showing what was
paid and what was charged.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Wednesday, June 17, 2026 1:18 PM
To: O'Brien, Deborah <dobrien@dover.de.us>
Subject: EXTERNAL: CDBG Operations Reimbursemenrt
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
I understand that a few of the expenditures for which we requested CDBG reimbursement are
not eligible. I therefore submit an additional request, for extermination of insect infestations
totaling $4,324. The following documents are attached:
1. Invoices from the extermination company; and
2. A spreadsheet that details and totals the amounts.
134
Page 135
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: CDBD Operations Reimbursement
Date: Wednesday, June 17, 2026 3:46:39 PM
Attachments: Exterminator Treatments Version 2.pdf
Proof of Payments.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
I have re-organized our pest-extermination reimbursement request, now based on dates and
amounts paid rather than invoices. To the invoices previous transmitted to you, please add the
following:
1. New spreadsheet detailing the checks paid, their dates of issue, and amounts.
2. Bank records showing each check and its endorsement.
The new total to be reimbursed is $4,625. Please do let me know if any balance remains in the
grant, and I will submit documentation for plumbing repairs during shelter season.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent information,
or the omission of any material fact, may subject me to criminal, civil, or administrative
consequences including, but not limited to violations of U.S. Code Title 18, Sections 2, 1001, 1343
and Title 31, Sections 3729-3730 and 3801-3812.
We are committed to being in full compliance with both federal and city requirements. Thank you
for your patience as we stumble through the process!
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
135
Page 136
Item 1.
Insect Infestation Mitigation Charges
People's Community Center Shelter
DATE AMOUNT CHECK
12/28/2026 $160 2187
01/11/2026 $80 2196
01/31/2026 $1,100 2211
02/15/2026 $400 2223
03/16/2026 $895 2243
03/16/2026 $400 2241
04/13/2026 $555 2259
05/24/2026 $730 2275
05/31/2026 $305 2278
$4,625
There were 9 pages of copies of checks attached to this,
but no matching invoices.
136
Page 137
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Subject: RE: EXTERNAL: CDBD Operations Reimbursement
Date: Wednesday, June 17, 2026 4:22:00 PM
Attachments: 1643_001.pdf
image003.png
Good afternoon, Dr. Hodge,
It would probably be a good idea for you to revise the attached according to the new when you
resubmit.
In addition, your ARPA balance remaining is below:
Greater Kent
ROUND 2 Date
Coalition/PCC
G/L Beginning
$60,675.45
Account balance
20020 10/23/2025 $12,038.00
20020 06/17/2026 $32,426.48
Total spent to
$44,464.48
date
Ending Balance $16,210.97
% spent 73%
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Wednesday, June 17, 2026 3:46 PM
To: O'Brien, Deborah <dobrien@dover.de.us>
137
Page 138
Item 1.
Subject: EXTERNAL: CDBD Operations Reimbursement
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
I have re-organized our pest-extermination reimbursement request, now based on dates and
amounts paid rather than invoices. To the invoices previous transmitted to you, please add the
following:
1. New spreadsheet detailing the checks paid, their dates of issue, and amounts.
2. Bank records showing each check and its endorsement.
The new total to be reimbursed is $4,625. Please do let me know if any balance remains in the
grant, and I will submit documentation for plumbing repairs during shelter season.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent
information, or the omission of any material fact, may subject me to criminal, civil, or
administrative consequences including, but not limited to violations of U.S. Code Title 18,
Sections 2, 1001, 1343 and Title 31, Sections 3729-3730 and 3801-3812.
We are committed to being in full compliance with both federal and city requirements.
Thank you for your patience as we stumble through the process!
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
138
Page 139
This is the revised invoice that was finally approved for reimbursement (not including the
Amazon or Exterminator receipts.
Item 1.
46 South Bradford
Dover 19904
··,' Reople·s .. 302.674.4178
•
Communi�y
i .
A collaboration of community stakeholders
who work to improve
Cen�er the quality of life in Downtown Dover.
12 June 2026
Ms. Deborah O'Brien, CPFO, MBA
Community Development Manager
City of Dover
RE: PY25/FY26 CDBG Operations
Dear Ms. 0' Brien,
Please reimburse People's Community Center $22,700 for the following expenditures,
according to our contract with the City, our M.O.U. with the building owner, and applicable
federal and local statute:
('\
\3;000 .oo �CltJ.
l. Occupancy and Utilities: $1"'6,QQ_o.oo.
Documentation Attached:
■ Invoice from People's Church to PCC;
■ Memorandum of Understanding between PCD and PCC;
■ Floor plan showing the rented space; and
■ Banking statement.
Note: The occupancy cost billed to this particular grant is only a small portion of
the actual cost of space specified in the MOU.
2. Cleaning and Maintenance:� °J ,7 00 .00 �O..&
Documentation Attached:
■ Itemized retail receipts; Co ,'3 l\�. (o (
■ Spreadsheet detailing each expenditure; and
■ Banking statements ..
't E'>'-+e,rn\ (\a..+or ·, A\JO ,.C,JLS 3,, ?)57. 39
139
Page 142
This revision did not change the amount reimbursed for exterminator invoices, but it did cause me
to have to re-reconcile and revise my disbursement attachment. Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Deborah
Subject: EXTERNAL: Extermination Payments
Date: Thursday, June 18, 2026 2:24:40 PM
Attachments: Exterminator Treatments Revised.pdf
Supplemental Check Images.pdf
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. O'Brien,
This week I sent you a reimbursement request for pest extermination expenditures. Unfortunately,
my earlier request included invoices for services outside of the eligible date range. I apologize for
the unnecessary work I gave you!
Attached hereto is a corrected request, with the ineligible dates deleted. A few new payments have
been added. I also added to the detailed spreadsheet the specific invoices for which each check was
in payment, and the dates of service and reflected in the invoices. I think that you will find this
spreadsheet very helpful in organizing and verifying. The retail service invoices were transmitted
to you earlier this week.
Thus, attached hereto are the following documents supporting a reimbursement in the amount of
$4,019:
A revised spreadsheet detailing the dates of service and payments; and
Supplemental check images.
I certify to the best of my knowledge and belief that the information provided herein is true,
complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent information,
or the omission of any material fact, may subject me to criminal, civil, or administrative
consequences including, but not limited to violations of U.S. Code Title 18, Sections 2, 1001, 1343
and Title 31, Sections 3729-3730 and 3801-3812.
Thank you again for your continuing help!
________________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
142
Page 143
Item 1.
Insect Infestation Mitigation Charges
People's Community Center Shelter
Check Date Amount Invoice Dates of Service Check #
08/31/2026 $225 45825 26 Aug 2078
11/02/2026 $604 46275 18 Sep 2130
10/13/2026 $80 46230 26 Sep 2108
12/28/2025 $160 46232; 46233 25 Nov; 18 Dec 2187
01/11/2026 $80 46231 31 Oct 2196
01/31/2026 $1,100 47574; 48585 9 Jan; 22 Jan 2211
02/15/2026 $400 47789 09-Feb 2223
46234; 47957; 47960; 28 Jan; 26 Feb; 13 Feb;
03/16/2026 $895 2243
48019 26 Feb
04/13/2026 $475 48160; 48161 12 Mar; 12 Mar 2259
$4,019
Notes:
1. Check #2259 was in the amount of $555; in included service for a date outside the
reeimburseable range, so the request is for only part of the amount of that check.
143
Page 144
Item 1.
From: G. D. Hodge, Ph.D
To: O"Brien, Deborah
Subject: EXTERNAL: Re: CDBG operations project
Date: Thursday, August 13, 2026 4:41:38 PM
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
I have been on sabbatical and out of town since 1 July, but I will try to get to this as soon as I
can, since you are on a deadline.
Sent from my iPhone
On Aug 13, 2026, at 4:20 PM, O'Brien, Deborah <dobrien@doverde.gov> wrote:
Good afternoon, Dr. Hodge,
I’m working on the closeout report for the $22,700 expenditure and need to know how the money
assisted the community from 7/1/2025 – 3/31/2026. I’m attaching a template for your convenience,
to show you what I’m looking for. Just fill out the sections you can to the best of your ability, and
please send it back as soon as possible. I need to provide this information in the Consolidated
Annual Performance Evaluation Report (CAPER) for public comments by September 9th.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Department of Planning, Inspections & Community Development
City of Dover
(P) 302-736-7175
(F) 302-736-4217
<Picture (Device Independent Bitmap) 1.jpg>
Thank you for your email. Please be advised that the City of Dover email domain has changed to
@doverde.gov as part of our ongoing efforts to improve communications. Our new domain is part of
a long-range initiative to increase security and by switching to a .gov domain it provides further
assurance to the public that the communications received from @doverde.gov is official, trusted
information. Messages sent to our old email addresses will still be received until the conversion is
completed. Kindly update your records accordingly, we appreciate your attention to this update.
<CDBG Subrecipient PY 2025 Annual Report.docx>
144
Page 145
Economic Development Application
1.
Item 1.
Workforce Development Program Launch
14-months: 1 December 2025 - 31 December 2026
Version: 5 October 2025
Sources
Block Grant 22,700
City ARPA III 10,000
Dover Economic Development 47,363
80,063
Occupancy
Outfit (Furniture and Equipment) 8,000
Rent and Utilities 13 months * $1000 13,000
21,000
Staff
Coordinator 20 hours/week x $22 25,520
Center Director 13 months x 500 6,500
32,020
Program
Transportation 3,000
Identity Documents (SS Card, DL, Birth Certificate) 2,000
Partner Costs: Expungements, Financial Literacy 3,000
GED Tests 5,600
Unanticipated Expenses 3,000
Events 1,500
16,600
Total Direct Costs 69,620
Indirect Costs 15% of $69,620 10,443
Total Project Cost 80,063
145
39
Page 146
Item 1.
COUNCIL COMMITTEE OF THE WHOLE MEETING FEBRUARY 26, 2026 PAGE 11
these existing programs might be a more effective approach and stated that partnerships and
collaboration with organizations already providing these services could be more efficient.
He also noted that the People's Church had previously received significant funding from the city,
including funds during the COVID-19 pandemic, and stated that he was concerned about
providing additional funding without seeing measurable outcomes. Mr. Boggerty concluded by
stating that, based on the concerns raised during the meeting and the matters that had recently
come to light, he would not support the request at this time until those issues were resolved.
Mr. Lewis stated that he agreed with the comments made by Council President Neil. He noted
that when the matter had previously come before the committee, there were issues with the
application. He referenced an email sent to council members by Mrs. Francis Perry, which raised
concerns regarding possible misrepresentation of information in the application, including
references to veterans.
Mr. Lewis further stated that, to his understanding, the Veterans Affairs Department already
operates its own workforce development programs. He indicated that the concerns raised in the
email were significant and contributed to his position on the matter.
Additionally, Mr. Lewis stated that he believed the proposal would duplicate existing services,
noting that the Department of Labor already provides workforce development programs. He
reported that he had spoken with representatives from the Department of Labor, who indicated
that they already offer a range of programs available to assist homeless individuals seeking
employment and job training.
Based on these concerns, Mr. Lewis stated that he would not support the funding request.
Responding to Mr. Neil, Mr. Hugg stated he was not aware of a recent decision from the solicitor
and that no response had been received to the solicitor’s letter to Mr. Baird. He noted that staff
were reviewing several zoning issues, particularly regarding building uses that were inconsistent
with current zoning. He reported that, following a meeting with planning, code enforcement, the
fire marshal, and emergency management staff, serious violations relating to building use and
condition were identified. Mr. Hugg recommended that the matter not proceed at this time. He
acknowledged that a potential legal risk existed due to zoning issues.
Pastor Hodge introduced Pastor Grimes of Solid Rock Baptist Church and Harold Stafford,
founding director of the HELP Initiative and former Delaware Secretary of Labor, noting that
Mr. Stafford served on the board to guide workforce development efforts. He stated there
appeared to be three main issues and noted several factual misunderstandings. He emphasized
that all parties shared a common goal of reducing street homelessness, supporting individuals in
stabilizing their lives, and protecting property values.
Pastor Hodge clarified that the economic development application was unrelated to the church’s
shelter operations, which had historically provided emergency winter housing for the homeless.
He described the workforce development program’s target population as individuals seeking to
re-enter the workforce or stabilize their lives, and emphasized that the program was not intended
to duplicate existing services, including those for veterans, but rather to operate through
146
Page 147
Item 1.
COUNCIL COMMITTEE OF THE WHOLE MEETING FEBRUARY 26, 2026 PAGE 12
partnerships with organizations such as Neighborhood Partners and the Delaware Department of
Labor. He noted that funding had been secured to renovate a segregated space for program
activities, including workshops, computer access, and vocational assessments.
Dr. Sudler stated that the proposed program primarily served as a mediator to connect
participants with existing services and occasionally host workshops, rather than providing a
unique or differential advantage in workforce development. He noted that partner organizations,
including Neighborhood Partners and Solid Rock Baptist Church, already had space to host
workshops, and questioned the necessity and amount of funding requested.
He emphasized support for housing and homeless services, including assistance for vulnerable
populations, but expressed concern that unresolved compliance issues, such as zoning, health, or
code violations, needed to be addressed before additional city funding could be considered.
Dr. Sudler concluded that, given current budget constraints and existing community services,
approval of economic development funds at that time was not feasible, and that any proposal would
need to demonstrate a clear, extraordinary advantage to justify funding.
Pastor Hodge stated that the program provided an advantage through partnerships and affirmed
that the organization was in compliance with health and code regulations.
Mr. Neil expressed concerns that, despite claims of compliance, the city could be held liable if
legal action arose, noting that the property’s current use did not align with zoning and code
requirements. He cited multiple detailed letters from residents reporting that activities at the
location, such as feeding 75–100 people nightly, were negatively impacting the surrounding
residential area, including property damage and quality-of-life concerns. He emphasized that
while the program’s goals were positive, the same services could be provided at alternative
locations without affecting local homes, and that the city could not defend noncompliant uses.
Pastor Hodge stated that having a satellite location in the neighborhood would increase
accessibility for individuals who might not travel to other sites, such as Blue Hill Mall, due to
psychological or logistical barriers. He noted that situating services locally could facilitate
workforce readiness assessments for populations less likely to access distant locations and asked
Mr. Stafford to confirm this point.
Mr. Harold Stafford stated that he was the co-founder and board president of the HELP Initiative
in Dover, which had provided services to over 20,000 residents since its founding. He noted he
was not speaking in his former capacity as Delaware Secretary of Labor. He explained that the
organization supported Pastor Hodge’s workforce development program by supplementing
services, providing funding for pre-apprenticeship positions, and partnering with vocational
schools to train and employ participants, including individuals recently released from
correctional facilities. Mr. Stafford emphasized that establishing a satellite location in the
neighborhood would increase access to workforce development services for populations unlikely
to travel to other sites, aligning with past efforts to bring services directly into the community.
Responding to Mr. Neil, Mr. Will Grimes, Pastor of Solid Rock Baptist Church, stated that the
first floor of the CURE building housed Restore Central Dover, providing community
147
Page 148
Item 1.
From: O"Brien, Debbie
To: gdhodge@pcc-dover.org
Cc: O"Brien, Debbie
Subject: FW: City of Dover CDBG grant application
Date: Thursday, January 29, 2026 3:53:00 PM
Attachments: Sub-Recipient Grant Application-PY26.pdf
Sub-Recipient Grant Application-PY26.docx
Importance: High
Good afternoon, Dr. Hodge,
I’m just following up on this application request I sent last month. I need to get all of these in
asap. See below for the attachments.
Sincerely,
Debbie O’Brien, CPFO
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
_____________________________________________
From: O'Brien, Debbie
Sent: Wednesday, December 31, 2025 4:17 PM
Cc: Duca, Sharon <SDUCA@DOVER.DE.US>
Subject: City of Dover CDBG grant application
Good afternoon,
Attached, you will find the application for CDBG funds for Plan Year 2026. Please complete
148
Page 149
Item 1.
and return the application by January 30th for the upcoming year’s CDBG allocation. Please let
me know if you have any questions or concerns, and please forward this to anyone in your
organization that needs to be aware. Thank you!
Sincerely,
Debbie O’Brien, CPFO
Community Development Manager
City of Dover
15 Loockerman Plaza
Dover DE 19901
(302) 736-4239
149
Page 150
Item 1.
From: G. D. Hodge, Ph.D.
To: O"Brien, Debbie
Subject: EXTERNAL: Community Development Block Grant
Date: Tuesday, February 17, 2026 8:34:18 AM
Attachments: 2026-2027 Application.pdf
Hodge CV.pdf
PCC Determination Letter.pdf
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Dear Debbie,
Attached hereto are:
Sub-Recipient Grant Application;
Hodge Curriculum Vitae; and
IRS Determination Letter.
Thank you for your patience!
Derrick
___________________________________________________________________________________________
G. D. Hodge
President of the Board of Directors,
People's Community Center
150
Page 151
Item 1.
CITY OF DOVER
PY 2025-2029 Multi-Year
CDBG GRANT APPLICATION FORM
PY2026
1. General Applicant Information
A. Name of Organization: People’s Community Center
Address: 46 South Bradford
Phone Number: 674.4178
B. Name, position and signature of person submitting application:
G. D. Hodge
President of the Board of Directors
Name and position of authorizing official:
G. D. Hodge
President of the Board of Directors
C. Name, address and phone number of Contact Person (if different from B above):
Not applicable.
D. Activity: Workforce Development and Neighbors in Need
Amount Requested: $77,300
Source of Matching Funds: Grant-in-Aid; private individual community donations
151
Page 152
Item 1.
City of Dover, Delaware
2. Low/Moderate-Income Benefit:
The amount of benefit to low-and-moderate-income persons must be calculated for each
activity as described below. May be estimated as long as at least 51% of the population being
served is low to moderate income.
2. Total 3. L/M 4. % L/M 6. Amount
5. Amount
Activity Persons Persons Persons L/M
Requested
Served Served Served Benefit
A. Free Store 2400 2400 100% $14,500 $14,500
B. Vocational Rehabilitation 140 140 100% $40,000 $40,000
C. Case Management 300 300 100% $22,800 $22,800
Source of Data: All data is collected by scanning barcodes into our new software
system called Charity Tracker. The numbers in the chart above are 12-month
extrapolations based on the numbers served in the first ten weeks of the shelter
season, as detailed below.
A. Vocational Rehabilitation: Of the 151 men whom we housed from 1
December 2025 until 15 February 2026, 73 (almost half) expressed a desire
to return to the formal workforce. (Persons with untreated mental illness or
active substance use were not offered entry into the Workforce
Development program). Of those 73, 11 need general equivalency
diplomas, 17 need expungements, 19 financial literacy, 8 want computer
training, and 58 want specific job training and placement.
B. Free Store: We serve 20 persons per day, 3 days per week, for 40 weeks per
year. We thus distribute groceries, clothing, and household items to 2,400
families per year. From 1 December 2025 until 15 February 2026, we
distributed $10,878 to 161 distinct persons, 19 of whom were children and
28 of whom were elderly.
C. Case management: From 1 December 2025 until 15 February 2026, we
have housed 151 distinct men, 30 of whom were elderly. 41 of these – or
approximately 1/3, were current or past users of illicit substances. Another
36 were persons with a history of mental illness or cognitive disability (or
both). Thus, over half of our guest need case management services to help
them get into stable housing, medical treatment, and employment.
152
Page 153
Item 1.
City of Dover, Delaware
3. Management Capacity
A. List the person to be responsible for administering the CDBG Project:
Sub-Recipient Personnel Title(s)
G. Derrick Hodge President, Board of Directors
B. Attach resumes, audits, 501(c)(3) status and other supporting documentation for the
organization which establishes the capacity of the personnel above to effectively manage a
CDBG sub-recipient project.
4. Application Work Plan
Each proposed program activity must address each of the following areas through plan year
2026. Items C through H will only need to be completed for the current fiscal year. Attach a
mission statement and purpose of your organization.
A. Each program activity must be addressed separately. Program activities must be listed in
order of priority with the program activity of highest priority first. This order of priority for
program activities must be followed on all forms contained in this application.
B. Each program’s activity must be fully described. For rehabilitation programs, this
description must include the number of units to be rehabilitated, rental properties to be
rehabilitated, any special population groups the rehabilitation program will address, the target
area, and the need for the rehabilitation activity.
C. Provide a timetable showing monthly milestones for completion of each activity.
D. Attach drawings plans or other documentation necessary to describe program activities.
E. Describe each activity’s conformance with the goals and objectives of the City’s
Consolidated Plan.
Activity A. The Free Store. Priority Need 1 – HP1 and 2: Homelessness
Prevention. As the need for food and shelter has exploded over the past few
years, so has the demand for groceries and clothing. We receive massive
donations of clothing and dry goods, but our capacity to process and distribute
these donations is limited by our physical plan and by the lack of volunteers. Since
the clothing and grocery distribution programs are unfunded, we have relied
exclusively on volunteer labor.
153
Page 154
Item 1.
City of Dover, Delaware
About eighteen months ago, we were becoming overwhelmed with the
volumes of both the donations and the demand. We could not process the
donations fast enough, and the dark space we had dedicated to the clothing
pantry was stuffed beyond capacity. So we decided to convert a new space, on
the main floor of the building and with bright windows, into the “Free Store.” We
wanted people to feel good when they come to get what they need, and we
needed a more organized system. The Free Store organizes everything just like a
retail sore: merchandise is neat, sorted, and hung on racks. The atmosphere is
pleasant, so shoppers don’t mind spending time. The space contains of one large
room with groceries, household items, and adult clothing, and a smaller room with
children’s clothing, shoes, and toys.
Every day that we re open, we distribute approximately $500 of clothing,
groceries, and kitchen goods (primarily) to housed women and children in the
neighborhood.
Providing decent clothing and groceries to neighborhood families will
relieve a small amount of pressure on their household budgets, thus enabling them
to pay rent and utilities with less stress. In this way, our work supports the City’s
Consolidated Plan commitment to help people with very low incomes from
becoming homeless or returning to homelessness (AP-65 Homeless and Other
Special Needs Activities – 91.220(i)). Further provision for this type of assistance is
described on page 110 of the Consolidated Plan, in the paragraph titled “Actions
planned to reduce the number of poverty-level families”.
What we urgently need is a store manager. Our volunteer base is
overwhelmed and ill equipped for the management task. We need a paid
position to organize, staff, and supervise the store operations. This position will pay
$15 per hour for 20 hours per week, for forty-five weeks per year. Thus, the annual
cost will be $13,500 plus $1,000 for payroll taxes. Unrestricted, individual donations
to the Community Center will pay rent and utilities for the Free Store, if CDBG pays
the personnel cost of $14,500.
The grant review committee needs to know that the Free Store manager
will be one of our clients. Part of our program model is that we help people get
back on their feet and into more stable housing and employment. Ten of our
twelve staff members are formerly or currently homeless, or addicts in early
recovery. Those guests and volunteers who prove to be responsible and capable
are given duties of increasing responsibility. Thus, the pay that the manager will
receive is not only to organize the store so that neighborhood can stay escape
the risk of homeless, but that position itself will contribute to our workforce
development goal.
154
Page 155
Item 1.
City of Dover, Delaware
Activity B. Vocational Rehabilitation. Priority Need 1 – PF 4: Facility Improvements.
We seek not only to keep people alive, but to contribute to the wellbeing of the
entire neighborhood. We have noticed that about a third of our over-night guests
are currently employed, so we built new showers, washer-dryers, and toilets so they
could go to work fresh each day. Perhaps another third of our guests would like to
get back into the workforce, but they need help. We are in process of forming
partnerships with the Delaware Department of Labor, NeighborGood Partners,
and various area non-profit organizations, to improve the employability of our
guests. The Department has an excellent program for identifying skills and deficits,
and ushering people back to work; NeighborGood Partners will provide financial
literacy training; the Apex Program will provide expungements; and the technical
school district will provide GEDs.
We want our guests to connect to that help, because we believe that this
would reduce the number of people who are homeless and whose presence
frustrates business who look forward to a revitalized downtown. But some folks
need an additional bridge, before they can plug-into formal State programs. We
want to offer a satellite site to provide a pleasant and nearby place for our guests
to connect to personnel and programs to help them become employable.
We feel that the Consolidated Plan understates the problem, and overstates
resources currently available to help (e.g., MA-30 Homeless Facilities and Services
– 91.210(c) and MA-35 Special Needs Facilities and Services – 91.210(d)). People’s
Community Center offers its expertise in the community, the trust of its most
marginalized residence that we have earned over the years, and its significant
physical plant, to the City’s planners to aid in its downtown revitalization work.
To do this work, we need to continue to renovate our space. A sub-recipient
grant in the 2025 cycle allowed us to complete led-paint abatement, a Tier One
environmental study, and some of the building renovations. But we need to
continue this renovation work, and our HVAC system failed in February 2026.
Architectural and engineering plans from Becker Morgan are attached
hereto, as is a pricing document (bed) from Delmarva Veteran Builders. Since all
four floors of the building will benefit from the new HVAC system but the enter for
Workforce Development only occupies the basement, we believe that only 5% of
the total estimated cost ($40,000) be provided by CDBG. We will provide 95% of
the cost from other sources.
In summary: This activity draws upon two significant existing assets – our
experience with the chronically underemployed and homeless populations, and
the States’s programs in vocational rehabilitation (via the Department of Labor
and Delaware Technical and Community College) – to enable the City to
155
Page 156
Item 1.
City of Dover, Delaware
proceed with its consolidated plan with less unemployable people in the streets
and less reliance on the underground economy for survival. We request 5% of the
estimated cost, or $40,000.
Activity C. Case Management. Priority Need 1 – HP1 and 2: Homelessness
Services and Prevention. As stated above, we want to do more than merely
keep people alive; we want to help them move into a better place, with stable
housing, financial literacy, health care, and addiction treatment (when
appropriate). To do that, we need professional case workers. Some service
provision is being done by our current Peer Counselor, but we need a more
broadly trained psychiatric nurse practitioner.
At the beginning of the2025-2026 shelter season, we noticed a significant
shift as compared to previous years: a smaller portion of our nightly guests are
substance abusers, and a larger portion are persons with other mental illnesses.
There is an urgent need for counseling, case management, and psychiatric
medical care.
This work would enable very low-income neighborhood residents to
connect with job training, get social security numbers and Medicaid, addiction
counseling, financial literacy, or anything else they need in order to get our of
homeless or avoid becoming homeless. This work is consistent with the goals
articulated by AP-65 Homeless and Other Special Needs Activities – 91.220(i).
We have begun a conversation with Delaware State University about
providing a training site for MSW students. If CDBG will support part-time stipends
for one social work stupent, the University will provide the supervision. In this way,
the funds will not only help the very-low income people we work with, but also DSU
students. We envision stipends for 20 hours per week, paid at $16 per hour, for 40
weeks per year. The total stipend would be $12,800 per year.
The psychiatric nurse practitioner, who is already working with us, is able to
bill Medicaid for her services. For those guests who do not yet have Medicaid, we
would need to pay her at the rate of $50 per session. Five sessions per week for 40
weeks would cost a total of $10,000 (as a contract payment, there would be no
employer FICA expense). Through Grant-in-Aid and unrestricted individual
donations, People’s Community Center will provide the office space if CDBG will
pay the contract cost.
156
Page 157
Item 1.
City of Dover, Delaware
5. Each application should also describe any efforts to coordinate with businesses regarding the
development of the community as it affects low/moderate-income residents of the area.
Our model is collaborative; we do not have the expertise in-house to best utilize
grant funds and serve the needs of those who struggle. Hence, our goal is to
connect to others who do have experience and expertise. We build partnerships
with other non-profits, governmental bodies, and local donors, to make
downtown a more pleasant and livable space.
In addition to the partnerships already noted, Dr. Hodge sits on the Steering
Committee of Restoring Central Dover, an initiative of NeighborGood Partners.
Two members of the Delaware House of Representatives and two members of the
Dover City Council sit on the Board of Directors. Finally, two members of our Board
of Directors are key members of the downtown property owners group, who meet
regularly to discuss the problems of homeowners in a distressed neighborhood and
how we can, collaboratively, improve the quality of life for renters, homeowners,
and homeless.
6. Have you received a sub-recipient grant from the previous funding year? Yes.
If yes, give the total amount $66,700.
157
Page 158
Item 1.
From: O"Brien, Debbie
To: "G. D. Hodge, Ph.D."
Subject: RE: EXTERNAL: Community Development Block Grant
Date: Friday, February 20, 2026 2:53:00 PM
Attachments: image002.png
Good morning, Dr. Hodge,
Thank you again for submitting the PY2026 CDBG application and for the impactful work your
organization is doing in the community. As I work through the review process, I’ve identified a few
areas where some additional detail or supporting documentation would be helpful to ensure the
application meets HUD requirements. To make this as easy as possible, I’ve outlined these items
below as a checklist that we can attach to the application. Speaking of attachments, I will need the
engineering plans showing what percentage of the building will be used for each activity and the
pricing document from Delmarva Veteran Builders that were mentioned in the application.
Items Requested for Clarification / Attachment:
1. Low/Moderate-Income (LMI) Documentation
Brief description of how income eligibility is determined and documented for program
participants
Any intake forms, tracking methods, or tools used to verify LMI status
Estimate which programs the participants will use and how many times throughout the year
2. Budget Detail and Cost Allocation
A basic line-item breakdown for each activity (personnel, contracts, and other direct service
delivery costs)
Clarification of how shared costs (such as HVAC improvements) are allocated to CDBG-eligible
activities – specific goals and costs identified
Provide a timetable with monthly milestones for completion of each activity
3. Free Store – Staffing and Operations
A simple breakdown of the store manager’s weekly responsibilities (including time spent on
preparation, inventory, and volunteer coordination outside open hours)
Clarification of the difference between operating weeks (40) and requested staffing weeks
(45)
4. Case Management – Services and Tracking
A short outline of the specific case management services provided (e.g., housing placement,
benefits enrollment, coordination of care, etc.)
Description of how participant progress and outcomes are tracked
Clarification of the type of client data collected (e.g., income status, demographics, housing
status) and the system used for reporting
5. Vocational Rehabilitation – Program Structure
A short outline of the specific vocational rehabilitation services provided
Clarification on how participants will be reached and engaged outside of the shelter season
158
Page 159
Item 1.
(December–March)
Additional detail on how services will be delivered year-round
Please bear in mind that CDBG funds may support only those costs that are a direct service delivery
cost of a public service activity in accordance with 24 CFR 570.201(e), apart from your renovation
plans.
I’m happy to discuss any of the above if it would be helpful. Please don’t hesitate to reach out.
Sincerely,
Debbie O’Brien, CPFO
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Tuesday, February 17, 2026 8:32 AM
To: O'Brien, Debbie <dobrien@dover.de.us>
Subject: EXTERNAL: Community Development Block Grant
WARNING: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Dear Debbie,
Attached hereto are:
Sub-Recipient Grant Application;
Hodge Curriculum Vitae; and
IRS Determination Letter.
Thank you for your patience!
159
Page 160
Item 1.
From: G. Derrick Hodge
To: Duca, Sharon
Cc: Anderson, David; O"Brien, Debbie
Subject: EXTERNAL: Renovations at People"s Community Center
Date: Monday, April 6, 2026 2:33:07 PM
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear Ms. Duca,
The governor’s office has funded a renovation project in the basement of People’s Church, in
order to convert one large space into private offices and a conference room, for training and
case management,
Becker-Morgan has drawn the architectural plans for the new space, and lead-paint abatement
and a tier-one environmental review have already been accomplished. Thus, we are almost
ready-to-go. But before we even apply for a construction permit, the City Councilor of our
neighborhood, David Anderson, recommended that we have a meeting with you and with our
developer, to ensure that we are compliant in all other respects.
When would be a convenient time for us to meet?
Thank you,
________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
160
Page 161
Item 1.
From: O"Brien, Deborah
To: "G. D. Hodge, Ph.D."
Cc: Duca, Sharon; Lewis, Phillip
Subject: 5/26/26 meeting follow up
Date: Wednesday, May 27, 2026 12:56:00 PM
Attachments: image003.png
image004.png
Good afternoon, Dr. Hodge,
To follow up on our discussion yesterday, I wanted to summarize the key points that were discussed regarding the ARPA and CDBG-funded activities involving People’s Church of Dover (PCD) and
People’s Community Center (PCC).
Project chart copied from my 4/28 email for ease of reference:
Project # Project Description Beginning Balance Paid Current Balance Activity / Scope of Service
Renovations of areas in an existing church that will be
1 ARPA Round 1 Peoples Church 153,978.00 153,978.00 - utilized as a shelter for the homeless
Support staff to meet the needs of the shelter,
maintenance and utility cost for shelter operations, and the
2 ARPA Round 2 Peoples Church 63,288.00 63,288.00 - purchase of meals
Staffing for social and prevention services for at risk
persons, emergency shelter, beds and lockers, and
3 ARPA Round 2 GKCC_c/o_PCC 60,675.45 12,038.00 48,637.45 transportation for homeless persons in the city limits
PY25/FY26 People's Comm. Ctr. Shelter Operating cost for maintenance & utilities for the shelter
4 Operations 22,700.00 - 22,700.00
PY25/FY26 People's Comm. Ctr. Renovations of a facility that services the homeless
5 Renovations 40,000.00 - 40,000.00
TOTAL 229,304.00 111,337.45
These items are not necessarily listed in the order discussed but are organized by project for clarity.
Project 3 – ARPA funding – Staffing, Beds/Lockers, Transportation related to the shelter
PCC may continue to seek reimbursement for eligible costs as outlined in the approved scope of services.
I also wanted to clarify the reimbursement timelines and fiscal year limitations:
Invoices and payroll submitted at this time may only be reimbursed back to July 1, 2025, which represents the beginning of the City’s current fiscal year.
After 6/30/26, we can only continue reimbursing for the period starting 7/1/26.
Going forward, invoices and supporting documentation should be submitted between July 1, 2026 and December 15, 2026, to allow adequate processing time prior to the federal expenditure
deadline.
ARPA reimbursements cannot be processed after December 31, 2026.
Project 4 – CDBG – Shelter Operations
During our discussion, we reviewed several compliance and documentation requirements associated with federal grant funding:
All future invoices, payment requests, and reports involving federal funding must include the required certification language pursuant to 2 CFR 200.415(b).
Expenses should be separated by project and tracked through a fund accounting system that clearly identifies each funding source and related expenditures.
We discussed indirect costs as a potentially eligible expense; however, indirect costs must be supported by documentation, a reasonable allocation methodology, and inclusion within the
executed agreement.
We discussed the possibility of amending the agreement to allow reimbursement of eligible workforce development-related operations or the free meal program in place of overnight shelter
operations due to zoning and operational limitations. However, you indicated that PCC does not wish to pursue amendments to the existing agreements at this time, as you anticipate having
sufficient eligible expenditures under the current approved scope of services to fully utilize the remaining funding.
I also noted that eligible maintenance and utility expenses associated with shelter operations may be reimbursed through April 1, 2026 at 8:00 a.m., when overnight shelter operations ceased.
Additional items discussed included:
The Memorandum of Understanding dated September 1, 2025 regarding occupancy and utility costs associated with PCC’s use of PCD space. For future reference, any MOU submitted as
supporting documentation should be notarized.
The need to determine the percentage of building space utilized for shelter activities in order to establish an appropriate allocation methodology for rent and utility reimbursement. All costs
must be “necessary, reasonable, and allocable.”
Amazon and similar invoices must clearly identify the products purchased and their relationship to eligible grant activities. Where supplies are used across multiple PCC activities, an allocation
methodology may be necessary unless supplies are separately dedicated to shelter operations.
Payroll documentation, including pay stubs or equivalent records supporting case management salaries dating back to December, will need to be submitted.
Employees working across multiple activities or funding sources, including the Center Director position, must maintain timesheets and activity documentation in compliance with 2 CFR
200.430(i).
Project 5 – CDBG – Renovations for the Workforce Development Program
We discussed the following next steps regarding the proposed workforce development renovation project:
PCC will provide the contractor’s quote reflecting the total renovation cost for the workforce development area, so the required public notice process may begin.
Please note that procurement must follow the City’s policy, found here: https://www.cityofdover.gov/media/Purchasing/Policy/Purchasing%20Policy%20Final%2005-23-2022.pdf and records
may be requested for purchases over $10,000. See the purchasing flow chart on page 3.
Following completion of the 7-day public comment period, I will submit the Request for Release of Funds/Authority to Use Grant Funds documentation to HUD for review in connection with the
environmental review process completed through HEROS by AZ-RI.
Once HUD authorization is received, reimbursement activity may begin.
PCC will also provide invoices from Kario Environmental and Harvard Environmental associated with lead-based paint testing, mitigation activities, and the Phase I Environmental Assessment
totaling $17,100.
Regarding previously submitted invoices for dishwasher equipment, supplies, and shower repairs, eligibility for reimbursement under the current grant agreements do not allow for reimbursement of
these expenses. Please note that all reimbursements remain subject to review for eligibility, completeness of documentation, compliance with applicable federal regulations, and availability of grant
funds.
Please let me know if I missed anything discussed during the meeting or if you have any questions regarding the documentation requirements moving forward.
Here is what 2 CFR 200.415(b) says:
Subrecipients under the Federal award must certify to the pass-through entity whenever applying for funds, requesting payment, and submitting financial reports: “I certify to the best of my
knowledge and belief that the information provided herein is true, complete, and accurate. I am aware that the provision of false, fictitious, or fraudulent information, or the omission of any
material fact, may subject me to criminal, civil, or administrative consequences including, but not limited to violations of U.S. Code Title 18, Sections 2, 1001, 1343 and Title 31, Sections 3729-3730
and 3801-3812.”
161
Page 162
Item 1.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Tuesday, May 26, 2026 10:20 AM
To: O'Brien, Deborah <dobrien@dover.de.us>
Subject: Re: EXTERNAL:
Let's meet today at 3:45 ish.
On 05/26/2026 8:25 AM, O'Brien, Deborah wrote:
Good morning, Dr. Hodge,
I’m available today and tomorrow, 8 – 4:30, except I have a meeting tomorrow at 9:00, that’ll be about an hour long. I’ll be out of town Thursday and Friday. Let me know what works for
you.
Sincerely,
Debbie O’Brien, CPFO, MBA
Community Development Manager
Planning Department
City of Dover
15 Loockerman Plaza
Dover DE 19901
(P) 302-736-7175
(F) 302-736-4217
dobrien@dover.de.us
From: G. D. Hodge, Ph.D. <gdhodge@pcc-dover.org>
Sent: Saturday, May 23, 2026 12:19 PM
To: O'Brien, Deborah <dobrien@dover.de.us>
Subject: EXTERNAL:
WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Thank you for calling!
I would like to come see you, at your earliest convenience, so I can try to rap my head around the requirements and barriers. When could I come over?
Derrick
__________________________________________________________________________
G. D. Hodge, Ph.D.
President of the Board of Directors
People’s Community Center
--
________________________________________________________________________________ G. D. Hodge, Ph.D. President of the Board of Directors People’s Community Center
162
Page 163
Item 1.
CITY OF DOVER, DELAWARE
ACTION FORM
PROCEEDING: Council Committee of the Whole- Legislative, Finance, and Administration Committee
DEPARTMENT OF ORIGIN: Planning, Inspections, and Community Development- Code Enforcement
DATE SUBMITTED: October 1, 2026
PREPARED BY: Eddie Kopp, CCEO, Chief Code Enforcement Officer
SUBJECT: Amendments to the Dover Code of Ordinances
REFERENCE: Chapter 42- Environment
RELATED PROJECT: N/A
REVIEWED BY: Sharon J. Duca, P.E., ICMA-CM, Jason A. Lyon, P.E., Assistant City Manager/Interim
Director of Planning, Inspections, and Community Development
EXHIBITS: Ordinance 2026-15
EXPENDITURE REQUIRED: N/A
AMOUNT BUDGETED: N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: 10/13/2026 -Introduction to Council Committee of the Whole
10/26/2026 -First Reading at City Council
11/09/2026 -Final Reading at City Council
STAFF RECOMMENDATION: Approve the text amendments to the ordinance.
BACKGROUND AND ANALYSIS
• The proposed amendments aim to establish a light pollution ordinance.
• Light pollution is an increasing concern that causes distress among residents.
• The additions will create enforceable regulations regarding light pollution.
This proposed ordinance establishes standards for exterior lighting within the City of Dover to address
excessive or unreasonable lighting, glare, illumination, and light trespass. The ordinance requires exterior
lighting to be installed, maintained, and operated in a manner that minimizes impacts on adjacent
properties and public rights-of-way. These amendments provide a specific regulatory framework for
addressing lighting-related complaints and violations while establishing standards intended to prevent
excessive lighting, glare, and light trespass from adversely affecting neighboring properties.
163
Page 164
Item 1.
City of Dover
PROPOSED ORDINANCE #2026-15
1 BE ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3
4 That Chapter 42 –Environment, be amended by inserting the text indicated in bold, blue, italics,
5 and deleting the text indicated in red strikethrough as follows:
6
7 Sec. 42-3. Lighting
8 (a) Generally. It shall be unlawful for any person to install, maintain, operate, or cause to
9 be installed, maintained, or operated, any excessive, unreasonable, or unusually bright
10 lighting, glare, or illumination that annoys, disturbs, injures, or endangers the
11 comfort, repose, health, peace, or safety of others, or creates a risk thereof, within the
12 limits of the city.
13 (b) Exterior Lighting. All exterior lighting shall be installed, maintained, and operated to
14 minimize light trespass onto adjacent properties. The type, height, location, intensity,
15 and shielding of exterior lighting fixtures shall be designed and maintained so that
16 light is directed onto the subject property and does not unnecessarily shine, glare, or
17 reflect onto adjacent buildings or properties.
18 (c) Light Trespass. Exterior lighting shall not be installed or operated in a manner that
19 causes excessive or unreasonable illumination, glare, or light trespass onto adjacent
20 properties or public rights-of-way.
21 (d) Shielding. Where necessary to prevent excessive glare or light trespass, exterior
22 lighting fixtures shall be appropriately shielded, redirected, or adjusted to confine
23 illumination to the subject property.
24 (e) Notice. Where a violation of this section is identified, the property owner shall be
25 notified of the violation and, when applicable, any complaint received concerning the
26 violation. The property owner shall take all reasonable and necessary action to correct
27 the violation and bring the premises into compliance with this section.
28 (f) Violations; penalties. Any property that violates any provision of this section shall be
29 subject to the fines and penalties provided in Appendix F—Fees and Fines.
30
31 APPENDIX F - FEES AND FINES
32 Chapter 42-3.- Lighting
Chapter 42.Environment
Sec. 42-3. Lighting
Subsec. (f) Violations; penalties, Initial Notice $0.00
Subsec. (f) Violations; penalties, Second Notice $100.00
164
Page 165
Item 1.
Subsec. (f) Violations; penalties, Third Notice $200.00
Subsec. (f) Violations; penalties, Fourth Notice $300.00
Subsec. (f) Violations; penalties, Fifth Notice $500.00
Subsec. (f) Violations; penalties, Sixth and Subsequent Notice $1000.00
33
34 ADOPTED: *
35
36 SYNOPSIS
37
38 This proposed ordinance establishes standards for exterior lighting within the City of Dover to
39 address excessive or unreasonable lighting, glare, illumination, and light trespass. The ordinance
40 requires exterior lighting to be installed, maintained, and operated in a manner that minimizes
41 impacts on adjacent properties and public rights-of-way. These amendments provide a specific
42 regulatory framework for addressing lighting-related complaints and violations while establishing
43 standards intended to prevent excessive lighting, glare, and light trespass from adversely affecting
44 neighboring properties.
45
46 (SPONSORS: ROCHA & DUCA)
47
48 Actions History
49 10/13/2026 - Scheduled for Introduction - Legislative, Finance, and Administration Committee
165
Page 166
Item 3.
ALDERMAN'S COURT AD HOC COMMITTEE MEETING
The Alderman's Court Ad Hoc Committee was held on Tuesday, July 21, 2026, at 3:00 p.m. with
Mr. Anderson presiding. The members present were Mr. Neil, Mr. Rocha, Mr. Lewis, Mr.
Garfinkel, Ms. Smack, Mr. Witham (out at 4:40 p.m.), Ms. Gibbs (out at 3:43 p.m.), Dr. Halpern,
Mr. Wilson, Dr. Hoff and Ms. Mejia (via Webex).
Staff members present were Ms. Duca, Ms. Wheeler, and Ms. Martin.
ADOPTION OF THE AGENDA
Mr. Neil moved for approval of the agenda, seconded by Mr. Garfinkel, and unanimously
carried.
INTRODUCTION – COUNCIL PRESIDENT NEIL
Chairman Anderson introduced Council President Neil, who stated that the Committee's work
originated from concerns expressed by Dover residents and business owners regarding recurring
quality-of-life issues affecting the community. He described those concerns as a "cry for help"
from citizens seeking additional tools to address behaviors associated with addiction, mental
illness, and other circumstances that continue to impact neighborhoods and local businesses.
Mr. Neil emphasized that the Committee's purpose was not to create a court intended to generate
municipal revenue. Rather, he stated that any Alderman's Court should provide an appropriate
legal framework through which individuals struggling with addiction, mental illness, and similar
challenges could be held accountable while also being connected with treatment and supportive
services when available. He observed that many individuals experiencing these challenges are not
acting rationally and often require judicial accountability to obtain assistance. At the same time,
he noted that residents and business owners deserve meaningful protection from repeated quality-
of-life offenses that diminish public safety and community well-being.
Mr. Neil further stated that many lower-level offenses historically intended to preserve public
order are no longer consistently enforced because of the demands placed upon the criminal justice
system. As a result, communities are left with fewer effective tools to address recurring disruptive
behavior while individuals in crisis often fail to receive the intervention they need.
Mr. Neil shared a personal experience involving a close family member whose addiction began
following injuries sustained in an automobile accident. He explained that the progression from
prescription medication dependency to illicit drug use ultimately resulted in the loss of that family
member. He stated that the experience reinforced his belief that accountability and treatment
should work together rather than independently. Drawing upon more than two decades of
professional experience with the Maryland Division of Vocational Rehabilitation, Mr. Neil
described working alongside rehabilitation professionals who assisted individuals living with
blindness, mental illness, physical disabilities, and other significant challenges in preparing for
employment and independent living. He also observed that individuals who discontinue necessary
treatment or medication often experience setbacks that significantly affect their ability to remain
stable and productive.
166
Page 167
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 2
Mr. Neil acknowledged that some members of the public may have concerns regarding the
potential for an Alderman's Court to disproportionately affect minority populations or other
vulnerable individuals. He stated that those concerns should be taken seriously and emphasized
that it would be the Committee's responsibility to ensure that any future recommendations promote
fairness, equal treatment under the law, and appropriate judicial oversight. He concluded his
remarks by reiterating that individuals who knowingly violate traffic laws and other enforceable
offenses provide an existing source of legitimate court activity. However, he emphasized that the
financial operation of a municipal court should never depend upon individuals who lack the ability
to pay fines. Instead, he stated that the Committee's responsibility is to carefully evaluate whether
an Alderman's Court can improve public safety, strengthen accountability, and better serve both
the community and individuals in need of assistance.
GUEST PRESENTATION – ALDERMAN’S COURT 40 – TERRI CONOVER, CLERK OF
THE COURT
Ms. Terri Conover presented information regarding the Alderman’s Court 40, located in Newark,
DE. She gave information regarding day-to-day operations, personnel, and the variety of cases
they see.
Responding to Mr. Lewis, Ms. Conover explained that the operating budget for Alderman's Court
40 is funded through the City of Newark's annual budget process. As the department head, she
prepares and presents the Court's annual budget request to the Mayor and City Council for
consideration during the City's budget hearings. Ms. Conover explained that the Court also
receives revenue through the statewide Court Security Fund. Those monies are used primarily to
support courtroom security operations, including compensation for court bailiffs. She advised that
the Court's operating budget includes the purchase and replacement of equipment required for
court security personnel, including firearms, conducted electrical weapons (tasers), ballistic vests,
and uniforms. While certain equipment, such as firearms and tasers, may be reassigned when
staffing changes occur, uniforms and fitted protective vests must generally be replaced with newly
hired personnel. She further noted that ballistic vests require replacement at regular intervals in
accordance with manufacturer safety standards. Ms. Conover described the allocation of fines,
court costs, and statutory assessments collected by the Court. Using a traffic citation as an example,
she explained that, in addition to the base fine and court costs, various assessments are imposed
pursuant to State law, including court security fees, police funds, victim compensation
assessments, and technology related fees. She stated that the Court submits those statutory
assessments to the appropriate State agencies on a quarterly basis. Revenue associated with
municipal fines, court costs, court security fees, and alcohol-related assessments remains with the
City of Newark in accordance with applicable law and municipal budgeting practices.
Committee members discussed the complexity of administering the Court's financial
responsibilities and acknowledged that court operations involve substantially more than the
collection of fines. Ms. Conover noted that the Court maintains detailed financial records and
regularly processes payments to multiple State entities while also administering municipal
revenues.
Responding to Mr. Garfinkel, Ms. Conover explained that Alderman's Court 40 conducts
proceedings throughout the week and manages a variety of court calendars based upon the type of
167
Page 168
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 3
case being heard. She stated that officer availability plays a significant role in scheduling criminal
and traffic trials. Court staff coordinate closely with the Newark Police Department to account for
officer work schedules, training assignments, vacations, and other scheduling conflicts before trial
dates are established. She stated that the Court generally schedules between 15 and 20 trials during
a trial session to ensure that cases can be heard efficiently while providing adequate time for
attorneys, defendants, and witnesses. Ms. Conover explained that arraignment calendars fluctuate
considerably depending upon filing volume. Some sessions include approximately ten
arraignments, while others may exceed twenty matters. She further stated that court sessions
involving prosecutors or the Public Defender's Office require additional coordination because
those calendars frequently involve more complex criminal matters, attorney conferences, and
pretrial proceedings. Ms. Conover noted that defendants who are incarcerated may appear before
the Court either in person or through video proceedings, depending upon the circumstances.
Coordination with correctional facilities is therefore an important component of the Court's daily
operations.
Committee members observed that the Court's scheduling process requires significant
administrative planning and coordination among court personnel, law enforcement officers,
prosecutors, defense counsel, correctional officials, and the judiciary.
Responding to Mr. Garfinkel, Ms. Conover stated that trial dates for police officers had historically
been scheduled approximately two months in advance. She explained that recent changes to the
Newark Police Department's twelve-hour shift schedule have made scheduling somewhat more
challenging because officer availability now varies more significantly throughout the calendar
year. Despite those challenges, Ms. Conover stated that the Court continues to manage its caseload
effectively. At the time of the meeting, trial calendars were being scheduled into October and
November, which she indicated compared favorably with scheduling timeframes experienced by
other Delaware courts.
Responding to Ms. Gibbs, Ms. Conover stated the relationship between the police department and
the court did not raise any issues as they only saw police officers during certain time frames and
cases.
Responding to Dr. Hoff, Ms. Conover stated that she could not explain the statistical comparison
without reviewing the methodology used to calculate the reported figures he stated. She noted,
however, that Newark's Court handles a broader range of cases than several other municipal courts
throughout the State and conducts its own criminal and traffic trials rather than transferring those
matters to another court. Ms. Conover explained that numerous factors contribute to delays in
resolving cases, including continuances requested by defendants or attorneys, failures of
defendants to appear for scheduled proceedings, and circumstances in which defendants become
incarcerated after a hearing has been scheduled. She stated that the Court continues to manage
older pending cases while scheduling new matters as efficiently as possible.
She further stated that Newark Police officers consistently appear for scheduled trial dates and
noted that officer attendance has not presented a significant operational challenge for the Court.
Ms. Conover contrasted that experience with other jurisdictions that occasionally encounter
difficulties securing officer appearances for scheduled trials. Although unable to explain the
168
Page 169
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 4
reported clearance rate, Ms. Conover expressed confidence in the Court's day-to-day operations
and stated that court personnel continue to process cases efficiently while accommodating the
unique circumstances associated with each matter. She stated that Newark's Alderman's Court
exercises broader jurisdiction than many of Delaware's other municipal courts, including authority
over misdemeanor criminal offenses and driving under the influence cases. She noted that several
beach communities primarily handle parking and traffic violations, making direct statistical
comparisons difficult.
Dr. Hoff shifted the discussion to the City of Dover's judicial needs. He stated that the Justice of
the Peace Court 16 processed approximately 10,000 cases during Fiscal Year 2025, a caseload
substantially greater than that handled by Newark's Alderman's Court. He noted that any future
Alderman's Court established in Dover would therefore require careful evaluation of anticipated
staffing, operational costs, and judicial resources. He summarized the Committee's work by
identifying what he considered the three principal questions before the Committee: whether
establishing an Alderman's Court is legally permissible, whether an Alderman's Court is necessary
to address the City's needs, and whether creation of the Court is politically feasible. In his opinion,
the first two questions could likely be answered in the affirmative, while acknowledging that the
third question would not. He further observed that civil filings in Justice of the Peace Court 16 had
increased approximately 117 percent between Fiscal Years 2021 and 2025. He clarified, however,
that those civil cases were not the focus of the Committee's work and would not become part of
the proposed jurisdiction of a Dover Alderman's Court.
Mr. Neil reiterated that the Committee's primary concern involves recurring quality-of-life issues
affecting individuals who struggle with addiction, mental illness, and other conditions that impair
their ability to care for themselves or comply with the law. He stated that the Committee's objective
is to examine whether a municipal court could provide a legal framework that encourages
accountability while connecting appropriate individuals with treatment and supportive services.
He emphasized that the Committee's intent is not to create a court for the purpose of generating
municipal revenue or replacing the existing responsibilities of the Justice of the Peace Court.
Rather, he stated that revenue associated with traffic violations and other municipal offenses would
simply help support court operations while allowing the City to focus on addressing behaviors that
negatively affect neighborhoods, businesses, and the community.
Responding to Chairman Anderson, Ms. Conover clarified how traffic and criminal matters are
treated under Delaware law. Ms. Conover explained that individuals who receive Probation Before
Judgment for a traffic offense continue to have the underlying citation reflected in court records;
however, the disposition is not considered a conviction and is not reported to the Delaware
Division of Motor Vehicles as a conviction. She noted that while the record remains available for
judicial review when determining eligibility for future probation before judgment, it does not carry
the same legal consequences as a conviction. With respect to criminal matters, Ms. Conover
explained that eligibility for probation before judgment is determined by reviewing the defendant's
criminal history.
Using University of Delaware student violations as an example, she stated that an individual who
previously received probation before judgment for a qualifying criminal offense within the
preceding five years would generally be ineligible to receive the benefit again during that period.
169
Page 170
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 5
Ms. Conover further explained that criminal offenses resolved through Probation Before Judgment
may later be eligible for expungement upon successful completion of probation, provided the
individual otherwise qualifies under Delaware law. In contrast, she advised that traffic offenses
are not eligible for expungement, and certain civil violations likewise remain part of the court
record. She emphasized that Probation Before Judgment is not a conviction, but that the underlying
court record remains available. She also noted that the University of Delaware receives copies of
the Court's docket involving student cases and independently determines whether any disciplinary
action is warranted under University policies.
Responding to Ms. Smack, Chairman Anderson acknowledged the concern and stated that security,
prisoner transport, and facility design would be addressed during future discussions as the
Committee considered operational requirements associated with establishing an Alderman's Court.
Responding to Mr. Witham, Ms. Conover stated that the Court routinely considers motions filed
by attorneys in appropriate criminal cases, including motions involving DUI prosecutions and
evidentiary issues. She explained that attorneys regularly file pretrial motions and that those
matters are resolved as part of the Court's normal criminal case process.
Responding to Mr. Witham, Ms. Conover explained that, unlike many Justice of the Peace Court
cases, matters heard by Alderman's Court 40 generally remain within the Court unless specific
statutory requirements for appeal are met. She advised that appeals are limited primarily to cases
in which the base fine exceeds $100, exclusive of court costs and statutory assessments. She further
explained that individuals appealing an eligible case must file the appropriate appeal with the Court
of Common Pleas and pay the required filing fee. According to Ms. Conover, relatively few cases
are appealed, with most criminal and traffic matters being fully resolved in Alderman's Court. Ms.
Conover also discussed appeals involving DUI Court. She explained that defendants eligible for
the Court of Common Pleas DUI Court program may, following the appropriate evaluation and
acceptance into the program, complete the required appeal process so that the matter may proceed
within the specialty court. She noted that these cases occur infrequently and involve coordination
among the Court, the Attorney General's Office, and the Court of Common Pleas.
Responding to Mr. Witham, Ms. Conover stated that the Court does possess sentencing authority
within the limits established by Delaware law. She explained that the Court may impose terms of
probation, sentence individuals to periods of incarceration when authorized, and supervise
violations of probation through coordination with the Delaware Department of Correction. Ms.
Conover stated that defendants may receive suspended periods of Level V incarceration followed
by probation, depending upon the circumstances of the offense and the applicable sentencing
provisions. She noted that the Court also hears violations of probation and enforces the conditions
imposed as part of those sentences.
Ms. Conover also stated that Alderman's Court 40 hears appeals involving municipal code
enforcement citations, including violations of high grass, property maintenance, and parking-
related offenses. Ms. Conover stated that the City of Newark recently amended its procedures so
that only the property owner or landlord may appeal municipal code citations issued against rental
properties. She explained that tenants are no longer permitted to file appeals on their own behalf.
While this change has reduced the number of appeals filed by tenants, she noted that it has also
170
Page 171
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 6
created situations in which tenants correct violations within the required timeframe but remain
responsible for fees assessed by their landlords because no appeal is pursued. She also mentioned
the City's recently adopted chronic nuisance property ordinance, which authorizes substantial fines
for property owners who repeatedly fail to address ongoing code violations. According to Ms.
Conover, those matters are likewise adjudicated through Alderman's Court 40.
Responding to Mr. Witham, Ms. Conover advised that additional legal issues would likely arise
should the City of Dover pursue the establishment of an Alderman's Court. She observed that
questions concerning the applicability of State statutes versus municipal ordinances, charging
authority, and court jurisdiction would require guidance from the City's legal counsel. She offered
to assist the Committee in the future and indicated that Newark's City Solicitor could also serve as
a resource regarding legal and operational considerations.
Responding to Chairman Anderson, Ms. Conover also recalled that, more than a decade earlier,
the City of Newark had successfully opposed efforts to eliminate its Alderman's Court and transfer
its jurisdiction to the State court system. She stated that the experience demonstrated both the value
of maintaining a local court and the importance of clearly establishing its purpose and benefits.
Ms. Conover stated that Newark's close working relationship with the Police Department
contributes significantly to the Court's effectiveness. Police officers can swear out warrants,
address payment plans, participate in video proceedings for incarcerated defendants, and resolve
numerous administrative matters without requiring a formal court appearance. She stated that,
although Newark is a relatively small municipality, Alderman's Court 40 maintains a substantial
workload and believes a Dover Alderman's Court would likely experience similar demands.
Responding to Mr. Rocha, Ms. Conover explained that Alderman's Court 40 utilizes holding
facilities located within the adjoining Newark Police Department when necessary. She stated that
defendants sentenced to incarceration are generally escorted by police personnel to the holding
area pending transport and that use of the secured sally port is relatively infrequent. Ms. Conover
advised that she has served as Clerk of Alderman's Court 40 for approximately ten years following
a twenty-eight-year career as a probation officer. She credited the Court's success to the strong
working relationships among court staff, the City administration, the Police Department, and the
judiciary.
DISCUSSION
Chairman Anderson invited Committee members to discuss what additional information they
would like to receive as the Committee continues evaluating the feasibility of establishing an
Alderman's Court for the City of Dover.
Committee members expressed interest in hearing from representatives of additional Alderman's
Courts throughout Delaware to compare operational practices and organizational structures.
Although Alderman's Court 40 in Newark provided a valuable model, members agreed that
presentations from other municipal courts could provide additional perspectives regarding court
administration, jurisdiction, staffing, and best practices.
Chairman Anderson stated that future meeting agendas would be developed based upon the
interests and recommendations of the Committee. He emphasized that, while he would initially
171
Page 172
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 7
coordinate the meetings, the Committee itself would determine what information was necessary to
make informed recommendations regarding the potential creation of an Alderman's Court.
Mr. Neil then discussed concerns that had been expressed by members of the public regarding the
possible transfer of existing municipal appeal functions to a newly established court. He stated
that, in his opinion, the Committee should focus on addressing the City's current needs rather than
simply replicating existing processes or restructuring boards that are functioning effectively.
Mr. Neil reiterated that the Committee's primary objective is to identify lawful tools that would
enable the City to more effectively address recurring quality-of-life issues affecting
neighborhoods, businesses, and residents. He stated that many individuals’ experiencing addiction,
mental illness, or chronic behavioral issues repeatedly encounter law enforcement but often return
to the community without meaningful intervention. He explained that the Committee is examining
whether an Alderman's Court could provide an appropriate legal framework that promotes
accountability while encouraging treatment, rehabilitation, and supportive services when
appropriate. He emphasized that the proposal is intended to improve public safety and
neighborhood quality of life rather than focus solely on traffic enforcement or revenue generation.
Mr. Neil further observed that traffic citations and related court costs would likely provide an
important source of funding to support court operations. He stated, however, that the Committee's
overall mission remains centered on addressing community concerns and improving the City's
ability to respond to persistent quality-of-life issues in a fair and balanced manner.
Committee members also discussed whether additional municipal code provisions, including
certain trespassing violations, could potentially fall within the jurisdiction of an Alderman's Court.
Members acknowledged that questions regarding jurisdiction, municipal ordinances, and
enforcement authority would require further legal review as the Committee's work progresses.
Dr. Halpern stated that he intended to approach the Committee's work with an open mind. He
expressed support for continuing to examine how other Alderman's Courts operate while
identifying the City's desired outcomes before determining whether a municipal court would be an
appropriate solution. He emphasized that the City cannot continue relying solely on its current
approach to addressing recurring community issues. He suggested that establishing common goals
at the outset of the Committee's work would help members evaluate whether an Alderman's Court
could effectively meet those objectives while addressing the concerns raised by both supporters
and opponents of the proposal.
Chairman Anderson discussed the potential for future enabling legislation to authorize referrals to
existing specialty court programs, including Veterans Treatment Court, Drug Court, and DUI
Court, when appropriate. Committee members observed that connecting eligible individuals with
specialty court programs could further the Committee's objective of addressing the underlying
causes of recurring criminal behavior while promoting rehabilitation and accountability.
Mr. Witham shared observations based upon his experience in the Delaware court system and
discussed the historical development of specialty courts. He noted that Delaware has expanded
treatment-oriented court programs over time in recognition that many offenders benefit from
172
Page 173
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 8
services addressing addiction, mental health concerns, and other underlying issues rather than
traditional punitive measures alone. He also briefly discussed his military service and professional
background before returning to the Committee's work.
Dr. Hoff stated his perspective regarding the Committee's ongoing evaluation of an Alderman's
Court. He stated that his research indicates municipal courts have historically served a legitimate
governmental purpose and noted that neighboring jurisdictions, including municipalities in
Delaware and Pennsylvania, continue to utilize various forms of local courts. In his opinion;
additional clarification is needed regarding the necessity for establishing an Alderman's Court in
Dover. While acknowledging the significant increase in the caseload of Justice of the Peace Court
16, he observed that the Committee has also discussed using a municipal court to address quality-
of-life issues, behavioral health concerns, and specialty court referrals. He suggested that clearly
defining the Court's intended purpose would strengthen the Committee's future recommendations.
He further stated that political feasibility remains an important consideration.
He recommended examining municipalities that have both retained and eliminated Alderman's
Courts to better understand the advantages, challenges, and long-term operational impacts
associated with those decisions. He also suggested that the Committee consider alternative
approaches that may address similar community concerns while continuing to evaluate whether
establishing an Alderman's Court represents the most effective solution. Dr. Hoff observed that
any proposal should ultimately demonstrate measurable benefits to City residents and improve
overall quality of life.
Mr. Witham discussed the increasing workload experienced by Justice of the Peace Court 16. He
noted that recent legislative changes and increasing caseloads have placed additional demands
upon the State court system and observed that discussions with representatives of the Justice of
the Peace Court could provide valuable information regarding future Committee deliberations.
PUBLIC COMMENT
William Faust, Jr. 136 Orchard Avenue, expressed concern that afternoon meeting times may limit
opportunities for public participation. The speaker encouraged the Committee to consider
scheduling future meetings at times that would allow additional residents to attend and provide
comments. He also raised concerns regarding parking availability, courthouse security, operational
costs, and the financial sustainability of a municipal court. Additional comments focused on the
potential costs associated with appeals, the need for adequate holding facilities and security
personnel, and the importance of ensuring that any proposed Alderman's Court provides
measurable value to City taxpayers.
Bobby Wilson, 32 W. Loockerman, encouraged the Committee to begin planning promptly,
emphasizing that delays would only postpone efforts to address ongoing quality-of-life issues
within the community.
Chairman Anderson stated that if the City elected to establish an Alderman's Court,
implementation could occur incrementally. Rather than assuming jurisdiction over every eligible
case type immediately, the Court could begin with a limited caseload and expand its jurisdiction
over time as facilities, staffing, and operational capacity develop. Newark's recent addition of
173
Page 174
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING OF JULY 21, 2026 PAGE 9
marijuana-related cases was cited as an example of a phased approach. He acknowledged concerns
regarding construction costs, available space, and long-term financial sustainability. It was noted
that start-up costs would likely be significant and that revenues generated by the Court could
fluctuate over time depending upon changes in case volume and the success of programs intended
to reduce repeat offenses.
Ms. Smack, 1001 Whiteoak Rd, discussed whether fines imposed upon individuals experiencing
homelessness, substance use disorders, or financial hardship would effectively address the
underlying causes of recurring offenses.
Responding to Ms. Smack, Mr. Neil reiterated that the Committee's vision extends beyond the
collection of fines. He explained that a municipal court could provide additional sentencing
options, including community service, referrals to treatment programs, specialty courts, and other
rehabilitative measures designed to encourage accountability while addressing underlying
behavioral health issues. He emphasized that anticipated revenues supporting court operations
would primarily derive from routine municipal traffic, parking, and similar violations rather than
from quality-of-life offenses involving vulnerable individuals. He stated that the Committee's
objective is to develop a balanced proposal that prioritizes public safety, rehabilitation, and
responsible fiscal planning.
Chairman Anderson stated that the Committee's ongoing discussions are intended to develop a
thoughtful and workable proposal before presenting any formal recommendation to the City
Council. He expressed appreciation for the diverse viewpoints offered throughout the Committee's
meetings and emphasized the importance of continued public participation as the process moves
forward.
ADJOURNMENT
Chairman Anderson thanked Committee members, presenters, and members of the public for their
participation.
The meeting adjourned at 5:03 p.m.
David Anderson
Chairman
AB/RM
174
Page 175
Item 3.
ALDERMAN’S COURT AD HOC COMMITTEE MEETING
The Alderman’s Court Ad Hoc Committee was held on October 1, 2026, at 3:30 p.m. with Mr.
Anderson presiding. The members present were Mr. Lewis (via Webex), Ms. Smack, Mr. Witham,
Ms. Gibbs, Dr. Halpern, and Dr. Hoff.
Staff members present were Ms. Marney and Ms. Martin.
ADOPTION OF AGENDA
Mr. Anderson stated that the scheduled guest was unable to attend and requested deletion of Item 3,
Guest Presentation, from the agenda.
Dr. Hoff moved for adoption of the agenda, deleting Item 3, Guest Presentation, seconded by
Dr. Halpern and unanimously carried.
ADOPTION OF MINUTES
Dr. Hoff moved for adoption of the minutes of the Alderman’s Court Ad Hoc Committee
Meeting of July 21, 2026, seconded by Ms. Smack and unanimously carried.
RECAP OF THE LAST MEETING AND QUESTIONS
Mr. Anderson reviewed the previous meeting, which included an extensive discussion with the
Clerk of the Newark Alderman’s Court regarding court operations and possible approaches for
Dover. Responses from the Newark court to committee members’ questions had been distributed.
He stated that discussions with other jurisdictions would provide additional information regarding
whether and how an Alderman’s Court could operate in Dover.
Mr. Anderson explained that the committee’s recommendation would be submitted to the
Legislative, Finance, and Administration Committee, followed by City Council and State
Legislature. He emphasized the importance of developing goals before determining the court’s
structure and obtaining broad community support for any proposed Charter change.
GOALS:
Committee members discussed the following proposed goals for an Alderman’s Court.
1. Improve the quality of life for all, including residents and offenders.
2. Provide clear distinctions between matters handled by the Alderman’s Court and matters handled
by the State court system.
3. Establish the court’s jurisdiction, including exclusive and joint jurisdiction.
4. Develop cost and revenue estimates and assess whether the court could be self-sustaining.
5. Ensure that the court is community-oriented and not driven solely by fines.
6. Include referrals to drug court and other specialty courts.
7. Retain a criminal focus and avoid affecting people’s property through the court’s jurisdiction.
8. Develop sentencing guidelines that include constructive community service.
9. Explore whether the court could serve as an entry point for individuals needing mental health
assistance.
10. Explore probation before judgment as a mechanism for paid workforce training, soft skills
development, and an assessment of individual needs.
Dr. Halpern stated the importance of focusing on improving the quality of life for both residents
and offenders. He emphasized the need to determine whether a local court would provide an
effective mechanism for achieving that goal.
175
Page 176
ALDERMAN’S COURT AD HOC COMMITTEE OF OCTOBER 1, 2026 PAGE 2
Item 3.
Ms. Smack discussed establishing clear jurisdiction and providing guidance to law enforcement
regarding matters that would be heard in the Alderman’s Court and matters that would remain in
the State court system.
Mr. Witham explained the distinction between exclusive and shared jurisdiction. Members also
raised the importance of assessing legislative support for a proposed Charter change.
Mr. Witham stated that a proposed budget should identify operating costs and estimated annual
revenue. Members discussed financial sustainability and the possible use of any surplus. Concern
was expressed that financial needs should not influence findings of guilt or the assessment of fines
and that the court should operate to help the community.
In response to questions regarding property and municipal code enforcement matters, Mr.
Anderson stated that jurisdiction remained a question for the committee to determine. He noted that
the City already had appeal boards for construction and other code matters and expressed support
for retaining those processes. Mr. Witham explained that a court limited to criminal matters would
not have jurisdiction over civil building code appeals.
Mr. Anderson proposed referrals to existing specialty courts, including drug court and veterans
court, to provide early intervention and assistance. Members also discussed sentencing alternatives,
including community service, to avoid placing additional financial burdens on individuals living in
poverty.
Discussion included whether the court could provide an entry point for mental health evaluation
and treatment.
Mr. Anderson stated that the proposed goals would be put in writing and distributed to members,
including those who were absent, to allow additional input by email. The goals would be brought
back for discussion in November, after the election.
COMMUNITY ENGAGEMENT STRATEGY
Committee members discussed online and paper surveys to solicit opinions on proposed goals,
identify additional goals, and determine support for an Alderman’s Court. Concerns were raised
regarding whether survey responses would represent the community and whether participants
would have sufficient information about the proposed court to provide informed responses.
Members suggested providing educational information before requesting feedback.
Ms. Smack recommended holding more than one town hall and providing adequate advance notice
explaining the purpose of the meetings and the issues to be discussed.
Dr. Halpern recommended surveys before and after town halls to assess participants’ views and
understanding. Members also discussed managing meetings to encourage constructive comments
regarding problems and possible solutions.
Ms. Gibbs emphasized the importance of obtaining input from communities most likely to be
affected by the court and ensuring that outreach reached more than those who routinely
participated. Mr. Anderson discussed the possibility of an evening meeting to receive public
comment once a proposal had been developed. He emphasized combining accountability with
opportunities for rehabilitation and improving conditions throughout the City.
176
Page 177
ALDERMAN’S COURT AD HOC COMMITTEE OF OCTOBER 1, 2026 PAGE 3
Item 3.
During concluding discussion, members raised the need for support at both the City and State
levels. Mr. Anderson discussed the importance of community support for a Charter amendment and
the possibility of seeking voter input if necessary.
Mr. Anderson proposed an additional goal of connecting eligible individuals with reentry services,
paid job training, workforce development, and other assistance based on an assessment of their
needs. He discussed probation before judgment as a possible mechanism for participation and cited
a Wilmington program as an example of efforts to reduce crime and repeat offenses. Mr. Witham
noted that rehabilitation programs could exceed the penalties associated with low-level offenses
and that participant agreement would be necessary.
Dr. Halpern discussed barriers to employment, including a lack of identification and a mailing
address, and the need to connect individuals with existing services. It was noted that social services
could provide a mailing address for some individuals receiving assistance.
Mr. Witham recommended involving Finance, the Police Department, and the City Clerk’s Office
in developing projected costs, including administrative staffing, judges, citation preparation, and
distribution. Members discussed potential volunteer assistance during startup, legislative funding,
grants, and partnerships with service providers. A previously discussed startup estimate of
approximately $500,000 was mentioned; it was not presented as a finalized budget.
Ms. Marney noted that costs would depend on staffing arrangements, including whether employees
were part-time or full-time and whether benefits would be required. Possible startup assistance
from the Department of Justice was suggested if the court reduced demands on the State system.
Further financial analysis was needed.
Mr. Anderson stated that a Charter amendment would authorize the City to establish a court but
would not immediately create or fund it. He estimated that securing a location, staff, and initial
funding could require nine months to a year. Members discussed possible judicial nomination and
approval procedures, the use of attorneys or lay judges, and the importance of legal experience for
the chief judge. No appointment procedure was adopted.
Dr. Halpern requested information regarding traffic citations issued in Dover, the portion of fines
and court costs distributed to the State, and actual revenue received by the City. Mr. Anderson
stated that the information would be sought through the City Manager and Finance, with input from
the Police Department. Mr. Witham noted the availability of State statistical information and the
importance of distinguishing assessed fines from amounts collected.
Mr. Anderson discussed adopting municipal ordinances that mirrored certain State offenses to
retain applicable revenue locally. Mr. Witham noted that municipal ordinances and changes to
State statutes addressing jurisdiction would be needed. Mr. Anderson expressed a preference for
addressing the proposed structure and jurisdiction as part of the authorization process.
The meeting adjourned at 4:41 p.m.
David Anderson
Chairman
177